CS Paper Radar

Daily listing

2026-10-18 · cs.CE

4 papers first submitted this day (UTC) in cs.CE — Computational Engineering, Finance, and Science. arXiv announces a day's submissions the next evening, so the newest day fills up over ~24 h.

Score = weighted mean ofCitations 20%Upvotes 10%Code stars 10%Venue 15%Code/data 10%Novelty 15%Momentum 15%Substance 5%how it works

AI & Machine Learning 2

The Hidden Look-Ahead: Point-in-Time Leakage in Electricity Market Data

cs.LG cs.CEstat.AP ·2026-10-18 ·Abdelkrim Alfalah
positioncode/data
Abstract · 13 pages, 4 figures, 7 tables

Empirical studies of electricity prices routinely state that their models use only information available at the time of the trading decision. For weather-driven forecasts drawn from commercial archives, this condition is harder to meet than it appears, and whether it holds can change over time. We identify three timing pitfalls. A forecast run is labelled by the issue time of its weather model, but becomes available hours later and keeps changing after publication. Auction gates follow local clock time, while archives use UTC. Outturn series are revised after publication without earlier values being kept. Using the timestamps of 128,656 forecast runs from ten weather-model configurations, matched to the day-ahead and first intraday auction gates in Great Britain over 2022-2026, we find that selecting "the latest run issued before the gate" picks a run not yet published at the gate on more than 99% of delivery days for six of the ten configurations at one of the two gates. For GFS at the day-ahead gate, the share is 0.6% in winter and 99.8% in summer. The exposure also shifts as publication delays drift, and an action margin of a few minutes can cost a full six-hour forecast cycle. The wrongly selected inputs differ materially from those available at the gate, but their apparent accuracy gain ranges from -9% to +24% across variables, models, gates and seasons, so its effect cannot be assumed and must be measured. We argue that point-in-time correctness is a dynamic property of the data pipeline, and propose a protocol that audits it from timestamps before any model is fitted.

0.30

Multifidelity Monte Carlo Estimator for High-Dimensional Quantities of Interest

cs.LG cs.CE ·2026-10-18 ·Zhibo Dai, Hamdi A. Tchelepi, Daniel M. Tartakovsky
unusual
Abstract

Multifidelity Monte Carlo (MFMC) reduces the cost of estimating the statistics of quantities of interest (QoIs) computed via expensive high-fidelity model by using cheaper low-fidelity models as control variates. We extend MFMC to vector-valued QoIs by replacing the scalar control-variate coefficients with matrices and minimizing a weighted mean-squared error. The optimal full-matrix coefficients are available in closed form, and their variance reduction is summarized by an effective correlation that takes the place of the squared Pearson correlation in the closed-form MFMC design. Restricting the coefficients to block-diagonal, diagonal, and scalar classes gives a nested hierarchy of estimators with increasing variance reduction and increasing pilot-data demand, with closed-form coefficients for compatible weightings. For a scalar QoI obtained by linearly projecting the state, correcting the full state before projecting is never worse at the population level. Experiments on a Gaussian problem, a reduced-order model of an advection--diffusion problem, and a coarse-grid two-phase flow problem show that the best class depends on the pilot size relative to the number of covariance quantities it must estimate, and that reusing the pilot samples lowers the mean-squared error.

0.23