CS Paper Radar

Daily listing

2026-08-29 · cs.DS

3 papers first submitted this day (UTC) in cs.DS — Data Structures and Algorithms. arXiv announces a day's submissions the next evening, so the newest day fills up over ~24 h.

Score = weighted mean ofCitations 20%Upvotes 10%Code stars 10%Venue 15%Code/data 10%Novelty 15%Momentum 15%Substance 5%how it works

Theory & Algorithms 3

Hardness of Approximation of Rank Aggregation on Ulam Metric

cs.CC cs.DS ·2026-08-29 ·Sk Ruhul Azgor, Diptarka Chakraborty, Le Van Cuong, Debarati Das, Tien Long Nguyen
theory
Abstract

We study the approximability of rank aggregation under the Ulam metric. In the \emph{Ulam median} problem, the goal is to find a permutation minimizing the sum of its Ulam distances to the input permutations, while in the \emph{Ulam center} problem the objective is to minimize the maximum such distance. Both problems are known to be NP-hard, but no explicit approximation hardness was previously known. We prove that, for every $\varepsilon>0$, it is NP-hard to approximate either Ulam median or Ulam center within a factor of $51/50-\varepsilon$, even when the input consists of only four permutations. We further show that unless P = NP, neither problem admits a polynomial-time additive approximation scheme. The hardness result for Ulam median is established via a reduction from MAX-E3-LIN-2. The corresponding hardness for Ulam center is then obtained through a reduction from Ulam median.

0.46

Scheduling to Maximize Weighted Throughput with an Active-Time Budget

cs.DS ·2026-08-29 ·Susanne Albers, G. Wessel van der Heijden
publishedtheory
Abstract · 16 pages, 5 figures, To appear at WAOA 2026

We study the active-time scheduling problem with weighted throughput maximization. In this setting, a set of $n$ jobs $J$ arrive at integer release times, each with an integer processing time and integer deadline. Jobs may be preempted at integer time slot boundaries. A schedule assigns jobs to time slots, with at most $m$ jobs assigned to the same time slot. A slot is called \emph{active} if at least one job is scheduled in it. Instead of scheduling all jobs to minimize the number of active time slots, we consider the more general variant of \emph{weighted throughput} with an active-time budget $K$, where each job $j\in J$ has a weight $w_j$. The objective is to maximize the total weight of \emph{completed} jobs using at most $K$ active time slots. This means that partially scheduled jobs do not count towards the objective. The classical active-time minimization problem is recovered by asking whether all jobs can be completed within a given active-time budget. We give hardness, approximation, and exact algorithmic results. For general intervals with unbounded parallelism, we prove NP-hardness, rule out an FPTAS unless $\mathrm{P}=\mathrm{NP}$, and give a pseudo-polynomial time $Ω(1/\log K)$-approximation. For proper intervals, we prove a canonical structural lemma and obtain an exact $(nK)^{O(m)}$-time algorithm. For laminar intervals, we give an exact $f(K,m)\cdot n^{O(1)}$-time algorithm.

0.25

A Simplified Analysis of the Good-Bad $3/2$-Approximation Algorithm for Some Minimum-Cost Graph Problems

cs.DS cs.DM ·2026-08-29 ·Shayan Ranjbarzadeh, David P. Williamson, Hannane Yaghoubizade
Abstract

In this paper, we consider an easy greedy approximation algorithm, the good-bad algorithm, introduced by Couëtoux for finding a minimum-cost set of edges such that every connected component has at least $k$ vertices. Couëtoux proves that the good-bad algorithm achieves a $3/2$-approximation for this problem. Davis and Williamson extend this result to the more general problem of finding a minimum-cost edge set that contains at least one edge from every cut $S\subseteq V$ satisfying $h(S) = 1$ where $h:2^V \rightarrow \{0,1\}$ is downward monotone; that is, $h(S) = 1$ implies $h(T) = 1$ for every nonempty subset $T \subseteq S$. The original problem corresponds to $h(S) =1$ when $|S|<k$. We give a simplified analysis of the good-bad algorithm for downward monotone functions.

0.10