CS Paper Radar

From Corridor Selection to Earthwork: A Multi-Stage Framework for Automated Road Design via Steiner Trees and Convex Optimization

Paavai Manimaran Vanjeenathammal, John R. J. Thompson, Warren Hare, Yves Lucet

cs.CE math.OC ·submitted 2026-09-16 19:27 UTC · v1

Abstract

Designing road networks for wind farms in complex terrain is a challenging task, especially under tight construction budgets. Traditional manual methods are time-consuming and may yield suboptimal results. We propose a structured three-phase optimization framework, TriPhase, to automate and minimize road construction costs from corridor selection to earthwork. Phase one formulates corridor selection as a Steiner minimum tree problem over a terrain-aware graph, incorporating slope and curvature constraints. In phase two, each road segment undergoes horizontal alignment optimization using a bilevel model, where a mixed-integer program evaluates vertical alignment costs. To ensure solver compatibility and performance, the model is reformulated explicitly for Gurobi. The final phase applies a network-wide convex optimization model to refine vertical alignment. Numerical experiments on real-world sites demonstrate up to 14% cost savings compared to industry-standard manual designs, validating the framework's effectiveness and practical relevance.

Closest papers

Nearest neighbours by meaning across the whole index.

On solving integer bilevel optimization problems with a non-convex quadratic follower objective function using disjunctive cuts

cs.DM math.OC ·2026-10-01 ·Kübra Tanınmış, Elisabeth Gaar, Jon Lee, Ivana Ljubić, Markus Sinnl
similarity 0.52
Abstract

In this work, we study bilevel optimization problems where all variables are integer, all constraints and the leader objective function are linear, and the follower objective function is non-convex quadratic. Relying on bilevel-free sets derived from improving directions, we develop a disjunctive cut approach to exclude bilevel-infeasible solutions within a branch-and-cut algorithm. We show that our disjunctive cuts can be obtained by solving a cut generating linear program. Furthermore, we discuss conditions that allow the number of disjuncts in the cut generating linear program to be reduced, and we propose several strategies to identify improving directions and generate disjunctive cuts efficiently. We evaluate various aspects of the proposed branch-and-cut algorithm on both convex instances from the literature that fit our setting and new non-convex instances and compare the performance of our best approach with existing state-of-the-art approaches, which we significantly outperform.

0.21

Topology-Aware Integrated Sensing, Communication, Charging in Massive Low-Altitude Wireless Network

cs.IT ·2026-10-01 ·Han Yu, Jiajun He, Zhaofeng Liu, Hing Cheung So
published similarity 0.51
Abstract

Future low-altitude wireless networks (LAWNs) are expected to simultaneously support sensing, communication, and charging, resulting in tightly coupled multi-objective optimization problems with strong interdependencies among heterogeneous functions. However, existing multi-objective frameworks typically rely on complex problem-specific formulations and alternating optimization procedures, which suffer from high computational complexity and limited scalability in large-scale, highly dynamic deployments. In this paper, we propose a unified topology-aware (TA) framework that abstracts terrestrial and non-terrestrial devices as nodes, and models their interactions as edges, forming a bipartite graph representation of the LAWN. By leveraging this graph representation, we develop a low-complexity topology reconfiguration algorithm based on a unified resource-adjustment rule. Simulation results demonstrate that the proposed TA-based method consistently outperforms state-of-the-art approaches in multi-functional coordination efficiency, while maintaining robustness and scalability in scenarios involving massive terrestrial and airborne user equipments.

0.34

Toward Near-Optimal Floorplanning with Complex Design Constraints for Modern SoCs

cs.AR ·2026-10-25 ·Fuxing Huang, Hao Ai, Qiyuan Chen, Hao Wu, Wenxing Zhu +2 more
publishedbenchmark similarity 0.50
Abstract · 9 pages, 7 figures, Accepted by International Conference on Computer-Aided Design (ICCAD) 2026

Modern system-on-chip (SoC) floorplanning is increasingly challenged by highly coupled complex design constraints. Existing methods often relax constraints into objectives via multi-objective optimization, leading to infeasible solutions or degraded quality. To address this, we formulate the problem as a constrained optimization task and propose a novel three-stage analytical framework integrating semidefinite programming (SDP), augmented Lagrangian method (ALM), and second-order cone programming (SOCP), which enforces constraints more rigorously and achieves higher-quality solutions. First, we adopt a two-step SDP formulation to obtain a robust initialization in the non-convex search space. Next, we incorporate differentiable objectives and constraints into an incremental ALM to jointly handle coupled design constraints during global floorplanning. Finally, an SOCP-based legalization strictly enforces feasibility while further reducing area. Experiments on the FloorSet benchmark show that our method satisfies all constraints with the fastest runtime. Compared with state-of-the-art methods, it reduces wirelength and area by 90\% and 16\% on average, and achieves near-optimal results, with wirelength and area being merely 2\% and 1\% larger than the ground-truth references, respectively.

0.51

Eventually Optimal and Scalable Multi-Agent Planning for Block Cave Mining

cs.RO ·2026-09-07 ·Christopher Leet, Paolo Forte, Uwe Köckemann, Henrik Andreasson, Sven Koenig
top venue similarity 0.49
Abstract

Automation in underground mining has the potential to significantly enhance safety, operational efficiency, and sustainability. However, effectively coordinating fleets of autonomous vehicles in dynamic mine environments introduces substantial challenges in both optimization and motion planning. To address these challenges, we introduce and formalize the \emph{Block Cave Mining (BCM)} problem, which focuses on computing a transport plan that maximizes ore throughput while satisfying draw ratio constraints. To solve this problem, we propose SAMM, an eventually optimal anytime solver that jointly integrates task assignment, scheduling, and path planning via a mixed-integer linear programming formulation. To improve scalability, we also introduce SAMMS, a variant of SAMM that trades optimality guarantees for efficiency by decomposing the problem into shorter planning subcycles. Experimental evaluations using realistic industrial mine scenarios demonstrate that SAMMS achieves near-optimal throughput and scales effectively to larger fleets and mine layouts.

0.48

GCS-Bridging: Restoring Connectivity of Disconnected Convex Sets for Graph-of-Convex-Sets Motion Planning

cs.RO ·2026-08-23 ·Xiaokai Zhou, Baoshi Cao, Yang Liu, Kui Sun, Boyu Ma +2 more
similarity 0.49
Abstract · 8 pages, 3 figures

Graph-of-Convex-Sets (GCS)-based trajectory optimization represents collision-free regions in configuration space as a finite collection of convex sets and directly performs collision-free trajectory planning over these sets, substantially simplifying the planning process. However, existing GCS-based trajectory planning methods generally assume sufficient connectivity among the convex regions and do not explicitly address cases in which the start and goal regions belong to different connected components of the initial GCS map. To address this limitation, we propose GCS-Bridging, which reconnects disconnected convex regions through collision-free point paths followed by convex region inflation, thereby recovering the feasibility of otherwise disconnected GCS planning problems. Extensive simulations across multiple IRIS-related algorithms and scenarios demonstrate that GCS-Bridging restores missing start-to-goal connectivity in the initial GCS map with a 99.8% success rate. In addition, a hardware experiment on a single-arm Franka platform in a real-world scenario with initially disconnected start and goal regions validates the effectiveness of the proposed method in practical motion planning. Project website: https://zhouxk1997.github.io/GCS_Bridging/

0.20

Pairwise Reconnection for Cost-Distance Steiner Trees

cs.DS ·2026-11-06 ·Edgar Perner
theory similarity 0.48
Abstract

The Uniform Cost-Distance Steiner Tree Problem asks for a rooted tree that minimizes the connection cost plus a weighted sum of root-to-terminal distances. We develop an algorithm that constructs two candidate trees: one based on direct connections to the root and another that pairs selected vertices and connects each pair to the root. The algorithm selects the tree with the smaller objective value. The resulting randomized algorithm achieves expected approximation factors of $1.698$ in the spanning case and $2.041$ in the general case, and it can be derandomized in polynomial time. The pairwise matching analysis charges part of the augmentation cost directly to the connection and delay costs of an optimal solution, rather than only to the separated lower bound used in previous analyses. This allows the $1.698$ factor to fall below the maximum multiplicative gap of $1+1/\sqrt{2}$ between the optimum value and that lower bound. We give instance families with approximation-ratio lower bounds approaching $1+1/\sqrt{2}$ for cut-and-reconnect algorithms that start from a minimum spanning tree and $3/2$ for the present algorithm. Finally, we show that the Uniform Cost-Distance Steiner Tree Problem and the Steiner-tree version of the Cable-Trench Problem are approximation equivalent up to an arbitrarily small additive loss.

0.20

AGRO-Nav: Autonomous Graph-based Orchard Navigation

cs.RO ·2026-08-26 ·Ho Young Yun, Jaemin Yu, Duksu Kim
similarity 0.48
Abstract · 8 pages, 4 figures

Orchards form semi-structured environments in which parallel tree rows create natural driving corridors, yet narrow inter-row clearance and dense foliage lead geometry-agnostic grid planners to drift off the row center and risk trunk or canopy contact. We present AGRO-Nav, an automated framework for static graph-based global planning in orchards. From tree-row lines fitted to trunk clusters in a SLAM point cloud, it builds, without any manual waypoints, a sparse topological graph of intra- and inter-row connectivity; a global route is then found by Dijkstra search on this graph, connected to the start and goal by any-angle Theta* segments, and smoothed with a cubic B-spline. In real-orchard trials, AGRO-Nav follows the row center with a mean error of about 0.08 m, far below the A* (0.31 m) and Theta* (0.43 m) shortest-path baselines, while planning roughly four to five times faster. In Isaac Sim, it attains the lowest error among A*, Theta*, and a reproduced RANSAC midline baseline and remains stable as tree density drops to 70%, where the RANSAC baseline degrades. The resulting trajectories---straight row-centered segments joined by controlled turns---suit differential-drive and four-wheel-steering platforms.

0.36

HOPHY: A Hierarchical Hypergraph Representation for Off-Road Path and Mission Planning

cs.RO ·2026-09-17 ·Pranay Meshram, Charuvahan Adhivarahan, Prithvi Poddar, Ehsan Tarkesh Esfahani, Chen Wang +2 more
similarity 0.48
Abstract · Under Submission for IEEE Journal

Mission-level autonomy for disaster response, search and rescue, and tactical UGV operations requires repeated path and mission planning as terrain conditions, agent types, and objectives change. Pixel-grid search is costly for repeated kilometer-scale queries, while semantic abstractions must maintain valid costs and connectivity as conditions change. We present HOPHY (Hierarchical Off-Road Planning using Hypergraphs), a reusable hierarchical terrain representation that organizes map-scale terrain into geometrically connected semantic regions (GSNodes), connectivity-preserving critical regions (Coarse Regions), and typed hyperedges for terrain, agent, and weather context. Hyperedge intersections select affected regions and incident edges for state updates without rebuilding the hierarchy. Across real off-road maps spanning kilometer-scale areas, HOPHY achieves 100% planning success and less than 0.01% median cost deviation from the oracle (pixel A*), with substantially lower query and replanning latency than the evaluated pixel and abstraction baselines. Applied to a multi-robot task-allocation (MRTA) problem, these gains reduce total computation by 79x over pixel A* and 7.2x over the fastest abstraction baseline, with mission makespan comparable to pixel A*. Finally, we demonstrate HOPHY on a physical Clearpath Jackal that successfully executes a 1.5-km, eight-task mission across mixed-surface outdoor terrain and a blockage-triggered replanned route.

0.21