Many maintenance models implicitly assume that maintenance can be performed whenever intervention is warranted. In practice, however, environmental uncertainty, such as weather and sea conditions, can make maintenance opportunities intermittent and dynamically evolving. We consider a degrading asset for which preventive maintenance may be performed before failure, but intervention is possible only when the asset is accessible. Accessibility evolves stochastically over time and therefore affects not only whether maintenance can be performed now, but also the value of waiting for future opportunities. We formulate this setting as a finite-state Markov decision process under a long-run average cost criterion and investigate the structure of the optimal maintenance policy. Under monotone degradation and cost conditions, we show that an optimal policy retains a threshold form in asset condition, but unlike a single threshold, the optimal threshold varies with the accessibility state. Thus, intervention depends jointly on the asset condition and the expected evolution of future maintenance opportunities. Through a numerical study motivated by offshore wind turbine maintenance, we examine how accessibility dynamics, degradation characteristics, and economic parameters shape the optimal thresholds and compare the optimal policy with constant-threshold and age-based maintenance policies. In a representative setting, adapting the condition threshold to accessibility reduces long-run average cost by 4.31% relative to an optimized condition-based maintenance policy. Relative to an optimized age-based policy, the optimal policy reduces long-run average cost by 33.95%. The results show that maintenance thresholds are not universal: they should adapt to the degradation and accessibility characteristics of the system, and failing to account for these conditions can lead to substantial cost increases.

Closest papers

Nearest neighbours by meaning across the whole index.

Regime-Dependent Value of CVaR in Preventive Maintenance Scheduling under RUL Uncertainty

eess.SY ·2026-09-27 ·Jerzy Baranowski, Waldemar Bauer
similarity 0.66
Abstract · This work has been submitted to the IEEE for possible publication

We study preventive-maintenance scheduling for a small fleet when several assets compete for a limited number of maintenance slots and their remaining useful lives (RULs) are uncertain. The planning horizon is divided into discrete periods; each asset may be maintained at most once, and at most $K$ assets may be maintained in any one period. Future usage and RUL errors are represented by scenarios. We compare a risk-neutral policy that minimizes expected cost with a risk-aware policy that minimizes expected cost plus conditional value-at-risk (CVaR), where $\operatorname{CVaR}_{0.90}$ is the mean cost among the worst 10\% of scenarios. Both policies are solved exactly by enumerating all capacity-feasible schedules. A $3\times5$ experiment combines capacities $K=1,2,3$ with five increasing levels of RUL uncertainty, with ten paired replications for each combination. The risk-aware policy provides its largest benefit when RUL uncertainty is low-to-moderate and more than one maintenance action can be executed per period. In the best observed case, it reduces CVaR by 13.4\% with an expected-cost increase of only 0.2 relative cost units. At high uncertainty, the benefit becomes negligible and the two policies can select identical schedules. The results show that risk-aware scheduling creates operational value only when prognostic information is sufficiently informative and the maintenance system has enough flexibility to act on it.

0.13

From Market Signals to Maintenance Decisions: Grid-Informed Maintenance Optimization in Offshore Wind Farms

eess.SY math.OC ·2026-10-20 ·Keyi Wang, Robert Mieth, Ahmed Aziz Ezzat
similarity 0.66
Abstract

The reliable and cost-effective integration of large-scale offshore wind farms into power systems is largely influenced by maintenance operations. To date, power producers primarily rely on farm-level information (e.g., health signals, power generation, weather conditions) for maintenance planning of wind turbine fleets. We propose to consider additional grid-level information in maintenance operations, such as generation curtailment and market pricing. Periods of high generation curtailment or negative electricity pricing can be viewed as opportunities for preventive maintenance, since assets are fully or partially shut down due to grid-imposed constraints. We first analytically establish that access to market information has non-negative economic value for maintenance scheduling under a stylized setting, providing a theoretical foundation for treating market and grid information as a maintenance opportunity. We then formulate a grid-informed opportunistic maintenance scheduling model as a receding-horizon mixed integer linear program that jointly leverages both farm- and grid-level signals under realistic conditions to determine a maintenance plan for offshore wind turbines. Considering a 600-MW offshore wind farm in the United States, our proposed method reduces annual maintenance costs by up to 10%, while enhancing asset availability and resource utilization, relative to advanced maintenance models that solely rely on farm-level information.

0.40

Strategic and Grid-Aware Maintenance Planning of Offshore Wind Farms

eess.SY ·2026-09-01 ·Robert Mieth, Ahmed Aziz Ezzat
similarity 0.62
Abstract

Wind turbines require regular maintenance and the resulting costs are a substantial component of a wind farm's cost of electricity production. As a result, there has been ongoing interest in improving wind turbine maintenance scheduling to find an optimal balance between maintenance costs and the risk of failure or unplanned repairs. What remains understudied is the opportunity for wind farms to schedule maintenance in the context of grid conditions and electricity market clearing. This paper contributes to closing this gap by modeling and studying wind farm maintenance planning in a grid and electricity market context. We also review current U.S. practice of wind farm maintenance scheduling, which motivates this paper and its models. Our focus is the derivation of a strategic maintenance planning problem, alongside an efficient solution approach, in which the wind farm operator aims to submit a derated wind farm capacity such that the resulting market clearing and electricity prices maximize its profit while ensuring that all required maintenance can be performed. We derive and study both deterministic and stochastic versions of the model, with the latter considering environmental and operational uncertainties. We conduct numerical experiments using the IEEE RTS 96-bus testbed with real-world offshore wind farm data and investigate the roles of farm and turbine size, as well as forecast quality. We observe an alignment between strategic and grid-serving maintenance planning and find that wind farms can improve their bottom line with low impact on system costs.

0.45

Planning or Learning: Reliability and Cost in Multi-Asset Maintenance

cs.AI cs.LG ·2026-09-11 ·Xian Yeow Lee, Chandrasekar Venkatraman, Ahmed Farahat
publishedbenchmark similarity 0.58
Abstract

Industrial maintenance systems involve multiple interacting assets and shared resources, making it challenging to balance reliability and operational cost using a single decision framework. While recent work has focused on reinforcement learning (RL) for maintenance scheduling, direct comparisons with planning approaches under identical settings remain limited. In this work, we empirically compare planning and RL for multi-asset bearing maintenance using run-to-failure data. We examine how these methods behave when balancing preventive maintenance against tolerable failures across a range of failure penalty scenarios. We observed a consistent behavioral difference driven by objective formulation. Planning enforces reliability as a hard constraint and produces zero-failure policies whose total cost is largely insensitive to the magnitude of failure penalties. RL agents optimize expected cost and often trade off preventive maintenance against occasional failures as penalties vary, resulting in lower costs under low-penalty regimes but persistent non-zero failures even when penalties are high. We also investigate lightweight constraint mechanisms, including reward shaping and action masking, to encourage RL's reliability. From a practical perspective, planning may be more suitable when strict reliability is required and deployment horizons are short, whereas RL may provide cost-efficient policies when limited failures are acceptable and long-run operational efficiency is prioritized. Overall, this study clarifies the trade-offs between reliability and cost in multi-asset maintenance and suggests that planning and RL are complementary approaches. Beyond these findings, the controlled benchmark protocol itself that unifies environment, cost model, and evaluation across paradigms, offers a reusable template for comparing decision-making approaches in other maintenance settings.

0.32

Inter-Temporal Price Constraints in Dynamic Pricing: Performance Guarantees Under Price Monotonicity and Promotion Fatigue

cs.DM math.OC ·2026-09-23 ·Weiyuan Li, Paat Rusmevichientong, Huseyin Topaloglu
similarity 0.55
Abstract · 31 pages in main text, 14 pages in appendix, 1 figure

We study dynamic pricing problems under inter-temporal price constraints. We have resources with limited capacities. At each time period, we decide which products to make available and what prices to charge for the available products. The sale probability for a product depends on its price. If we make a sale for a product, then we collect a revenue reflecting the price and consume the capacities of a combination of resources. We work with two types of inter-temporal constraints. In price monotonicity, the prices charged for a product at different time periods have to be monotone. In promotion fatigue, we can discount a product at most once over each time interval of a fixed length. Computing the optimal policy is intractable. We use fluid approximations to construct policies. Traditionally, policies from fluid approximations make randomized decisions at each time period by following an optimal solution to the fluid approximation, but such randomized decisions easily violate price monotonicity or promotion fatigue constraints. We develop policies that sample price paths according to an optimal solution to the fluid approximation, while satisfying the inter-temporal constraints. Letting $c_{\min}$ be the smallest initial capacity of a resource and $L$ be the maximum number of resources used by a product, our policies have a performance guarantee of $\max\Big\{ \frac{1}{8L}, \, \frac{1}{2} - \sqrt{\frac{\log c_{\min}}{2 \,c_{\min}}} - \frac{L}{c_{\min}}\Big\}$. Thus, under large resource capacities, our policies are guaranteed to obtain at least half of the optimal total expected revenue. The latter performance guarantee is tight in the sense that no policy can, in general, obtain more than half of the optimal objective value of the fluid approximation even under large resource capacities. We unify our approach to open the path for extensions to other inter-temporal price constraints.

0.31

Threshold Structure of Optimal Policies in Restart POMDPs

cs.LG math.OCmath.PR ·2026-08-11 ·Konstantin Avrachenkov, Alexey Piunovskiy, Yi Zhang
publishedtheory similarity 0.54
Abstract · 8 pages, the paper has been accepted to IEEE CDC 2026

We study a Restart POMDP (Partially Observable Markov Decision Process) on a general Borel state space, where the controller either lets the hidden state evolve unobserved or restarts the system and observes the new state. Exploiting a sufficient-statistic representation consisting of the last observed state and the elapsed time since restart, we reduce the problem to a fully observed MDP. Under a natural one-step cost deterioration condition, we prove that optimal policies have a threshold structure in the elapsed time for both the discounted and total undiscounted cost criteria. When the state space is partially ordered and the kernel is stochastically monotone, we further show that the optimal threshold is nonincreasing in the state. For the average cost criterion, under additional assumptions of geometric ergodicity and domination of the transient gain, we establish analogous threshold results via the vanishing discount approach, after showing the uniform boundedness of the optimal thresholds and relative value functions.

0.25

Locked In: Multi-Objective RL for the AI Data Center Build-Out

cs.LG cs.AI ·2026-10-26 ·Satyapragnya Kar, Rajarshi Das, PR Panigrahi
published similarity 0.54
Abstract · Tackling Climate Change with Machine Learning Workshop at NeurIPS 2026

AI data center build-out is a multi-trillion-dollar, multi-decade infrastructure program. Yet siting, power procurement, and cooling decisions are still made with static, single-point scoring tools. These tools are evaluated once, on day-zero numbers. This is a poor fit. A site's water, power, and carbon profile drifts substantially over the 10 to 20 year asset life. The governing decisions are also irreversible, and they bind capital and physical plant for years. We formalize long-horizon build-out as a tiered multi-objective Markov decision process. Strategic commitments are gated to discrete windows, incur switching costs, and energize only after source-dependent lead times. Operational dispatch is restricted to capacity that physically exists. We solve the problem with a preference-conditioned multi-objective agent that has a semi-Markov manager and worker hierarchy. The agent recovers a family of policies that a planner can steer across cost, carbon, water, and reliability at inference time. We validate long-horizon dynamics with a lightweight counterfactual rollout model. Across three commitment regimes (irreversible, reversible, and commit-once) on real site data, preference conditioning yields a confirmed, steerable trade-off on both objective pairs in every regime. Imposing lock-in produces a more evenly covered frontier and a far more consistent rate of anticipatory retrofit ahead of a binding water-stress constraint than a freely reversible formulation. Finally, a compact counterfactual dynamics model tracks slow-moving state well. It is measurably outperformed by simple persistence on the water-stress axis. We report this limitation rather than obscure it. We release the environment, agents, baselines, and evaluation harness. All of them are grounded in real interconnection-queue, water-stress, and grid-emissions data.

0.25

Convergence-Aware Pareto Selection of Covariate Scaling Transformations for Markov Deterioration Hazard Models: Evidence from Bridge Inspection Data

cs.LG stat.ME ·2026-09-24 ·Takato Yasuno, Keita Kobayashi, Ryuta Sakaguchi
unusual similarity 0.53
Abstract · 19 pages, 2 figures, 5 tables

Maximum likelihood estimation of Markov deterioration hazard models for infrastructure asset management is sensitive to the numerical conditioning of explanatory covariates, yet production pipelines often adopt a single scaling convention without systematic justification. We study four covariate scaling transformations---baseline max scaling, min-max scaling, z-score scaling, and Box-Cox transformation with a training-derived positivity shift---applied to an Exponential Hazard Markov (EHM) model estimated via L-BFGS-B on bridge inspection transition data.

0.51