CS Paper Radar

An Efficient Algorithm for the Quickest Path Reliability Problem

Majid Forghani-elahabad

cs.DM ·submitted 2026-10-06 22:18 UTC · v1

Abstract

The quickest path reliability problem is to compute the probability that a given flow is transmitted along a single source-destination path within a given time limit. When a budget is imposed, path feasibility is jointly dependent on lead time, transmission cost, and capacity. Existing exact methods may require enumeration of all minimal paths a priori or examination of many partial paths that cannot be completed feasibly. In this paper, we propose an exact algorithm that generates the corresponding lower boundary state vectors without first enumerating minimal paths. Shortest-lead-time, least-cost, and widest-capacity information yield admissible destination-based bounds. Stronger capacity-aware bounds are derived from capacity-filtered subnetworks. These bounds allow early pruning of infeasible branches while keeping all solutions. The algorithm generates the exact complete set of lower bounds without any duplicates, and its correctness and computational complexity are proven.

Closest papers

Nearest neighbours by meaning across the whole index.

The Complexity of Traffic Engineering in Segment Routing Networks

cs.DS ·2026-11-13 ·Matthias Bentert, Stefan Schmid
theory similarity 0.63
Abstract

Segment routing is a modern variant of source routing which has recently become popular in the Internet. It allows operators to equip network packets with an additional header which specifies segments: a list of waypoints the packet needs to traverse on its way to the destination. This is reminiscent of Valiant routing in parallel computing and introduces an additional degree of freedom in traffic engineering. This flexibility can be exploited to minimize congestion in the network. This paper sheds light on the computational complexity of traffic engineering in segment routing networks. We consider two problem variants: a fixed-length variant where link weights are given and only waypoints can be chosen, and a variable-length variant where additionally the network operator can also choose the link weights, which then define the shortest paths taken between the waypoints. We prove that the first variant is NP-hard even if the network graph is planar and if all demands and link weights are 1. We also show that the second variant is NP-hard already for planar network graphs with all demands being 1. On the positive side, we present a compact and general mixed integer linear program to compute exact solutions for the first variant.

0.32

Path Length Existence Problems in Bounded-Treewidth Probabilistic Graphs

cs.DB cs.CC ·2026-10-13 ·Antoine Amarilli, Mikaël Monet, Harshul Sagar
hot direction similarity 0.60
Abstract · 42 pages

We consider the problem of computing the probability of existence of a source-to-target path or walk satisfying a given length constraint in an input probabilistic graph. The length constraints we consider can require the length to be at least $\ell$, at most $\ell$, or exactly $\ell$, for $\ell$ a target length given as input. The probabilistic graphs that we consider are directed graphs where each edge is annotated with an independent probability of existence. As this task is generally intractable (#P-hard), we aim for algorithms applying to input graphs that are assumed to be of bounded treewidth. We classify the complexity landscape of these problems: - We give an XP algorithm parameterised by treewidth to compute the probability that an input probabilistic graph contains a source-to-target path/walk of length $\geq \ell$, and do the same for a path/walk of length $\leq \ell$. - We show that the four problems mentioned in the last item are W[1]-hard parameterised by pathwidth (hence not FPT under the standard assumption that FPT$\neq$W[1]). This is in contrast to the case of non-probabilistic graphs, where the corresponding problems were known to be FPT parameterised by treewidth; and to the connectivity problem (and more generally MSO evaluation) on probabilistic graphs, where the same was known. - Surprisingly, we show that it is #P-hard to compute the probability that an input graph contains a source-to-target path/walk of length exactly $\ell$, even on graphs of pathwidth $2$. By contrast, all our problems are tractable on graphs of treewidth $1$. - Last, we investigate the complexity of our problems when the edges can carry weights. This causes all our problems to become #P-hard already on pathwidth-2 graphs, and causes specifically the ``exactly $\ell$'' walk problem to be #P-hard even on pathwidth-1 graphs.

0.32

Optimizing the Steady-State Travel Time of Nash Flows over Time with Capacity Increases

cs.DS ·2026-11-09 ·Niklas Dahlmeier, Paul Paschmanns, Laura Ritter, Ruben Skorupinski
similarity 0.59
Abstract

We study budgeted capacity augmentation for single-source single-sink \NFOTs under constant inflow $u_0$. The goal is to increase capacities on arcs subject to a global budget constraint in order to minimize the steady-state travel time in the network. We show that this problem is weakly NP-hard on series-parallel networks and provide an exact pseudopolynomial algorithm as well as a fully polynomial algorithm that attains the optimum travel time for budget $B$ while spending at most $B + \varepsilon\cdot\max\{B,u_0\}$. On general networks the problem becomes strongly NP-hard. Moreover, unless $\text{P} = \text{NP}$, for every fixed $\varepsilon \in (0,1)$, no polynomial-time algorithm can achieve the optimal steady-state travel time while exceeding the budget by at most a factor of $n^{1-\varepsilon}$. Lastly, we give structural properties about steady-state travel time under varying arc capacities. We identify capacity thresholds determined by subsets of $s$-$t$-cuts and show that the travel time is constant in the interior of the cells resulting from the corresponding hyperplane arrangement.

0.24

On the Delay-Constrained Maximum Concurrent Flow Problem

cs.NI math.OC ·2026-09-04 ·Walid Ben-Ameur, Guillaume Beraud-Sudreau, Hervé Kerivin, Sebastien Martin
theory similarity 0.58
Abstract

Real-time services, such as VoIP and large-scale neural network training, require strict transmission delay guarantees. While routing under hop constraints is tractable, real-world delays increase sharply with equipment load, typically modeled using the M/M/1 queuing function where delay is inversely proportional to available bandwidth. We investigate the resulting Delay-Constrained Maximum Concurrent Flow (DCMCF) problem, which seeks to maximize the minimum throughput across all commodities. The problem's complexity stems from the conditional and non-linear nature of the delay constraints, which are active only along the specific paths used by the flow. We prove that DCMCF is strongly NP-hard, even for single-source/single-destination instances. To address the inherent non-convexity of the problem, we introduce a new convex relaxation expressed through second-order cone constraints, obtained from the convex envelope of a function representing the conditional delay associated with a single arc of a given path. The relaxation is shown to outperform existing formulations based on disjunctive programming. Leveraging this result, we develop a polynomial-time approximation algorithm with a provable performance guarantee and present numerical experiments demonstrating the effectiveness of the proposed approach.

0.31

Strengthening Compact Vehicle Routing Formulations through Arc-Flow Aggregation and Refinement

cs.DM math.OC ·2026-11-15 ·Julian Yarkony, Willem-Jan van Hoeve, Anthony Karahalios, Martin Karyamsetty, Soheyl Khalilpourazari +2 more
similarity 0.57
Abstract · 47 pages. Submitted to Transportation Science

Arc-flow formulations can provide strong relaxations for mixed-integer program formulations of vehicle routing problems, but the associated networks may be prohibitively large. We study the setting in which multiple arc flow relaxations may be applied, and introduce a dual-guided aggregation and refinement framework that constructs substantially smaller arc-flow formulations while recovering the LP bound of the original networks. Dual information is used both to identify states that can be aggregated without weakening the bound and to guide node disaggregation. We show that the resulting procedure converges finitely to the arc-flow bound of the full arc-flow formulation. The framework retains the original decision variables, allowing cutting planes to be added directly in the original variable space. Moreover, it produces an explicit MILP formulation without relying on column generation or pricing to determine the arc-flow relaxation bound. We apply our approach to the vehicle routing problem with time windows for which we define two arc flow relaxations, as well as two families of cutting planes over the original variable space. Computational experiments show that strong bounds can be obtained using substantially aggregated networks. The resulting root bounds are competitive with those obtained by the branch-and-price solver RouteOpt, while retaining a formulation that can be solved directly by a general-purpose MILP solver.

0.30

Generalized Flows over Time: Complexity, Structure and Algorithm

cs.DS ·2026-11-02 ·Siyuan Chen, Shengminjie Chen, Suixiang Gao, Zheyu Jiang, Dun Ma +1 more
publishedtheory similarity 0.57
Abstract · 43pages,7figures;An earlier version of this paper appeared at COCOON 2026

Generalized flows over time constitute a general network flow model that incorporates both transit times and flow losses or gains. We study their complexity, structure, and approximation. We prove that the generalized maximum flow over time problem remains NP-hard under standard binary encoding, even on lossy two-terminal series-parallel networks. The maximum temporally repeated restriction is APX-hard with general gains and NP-hard on lossy networks. We then consider the minimum source supply needed to satisfy a fixed sink demand within a given horizon, and prove that an optimal solution always exists without intermediate storage. On lossy networks, such a solution can additionally use only simple source--sink paths. These structural properties yield a fully polynomial-time approximation scheme via time condensation, with analogous schemes for generalized maximum flows over time and quickest flows with a source-supply budget.

0.38

Semi-Streaming Reachability and Shortest Paths in $n^{1/3+o(1)}$ Passes

cs.DS ·2026-11-03 ·Gary Hoppenworth, George Z. Li, Sepideh Mahabadi, Jakub Tarnawski
theory similarity 0.57
Abstract

In the semi-streaming model, the edges of an $n$-vertex graph arrive in a stream, and an algorithm makes multiple passes over that stream while using only $\widetilde{O}(n)$ space. The number of passes needed to compute single-source reachability in directed graphs is a long-standing open question in streaming algorithms, going back to Henzinger, Raghavan, and Rajagopalan (1998). The best known semi-streaming algorithm uses $n^{1/2+o(1)}$ passes due to Jambulapati, Liu, and Sidford (2019), while the best lower bound is $Ω(\log n/\log\log n)$ passes due to Guruswami and Onak (2016). We give streaming algorithms for computing single-source reachability and shortest paths on $n$-vertex directed graphs using $\widetilde{O}(n)$ space and $n^{1/3+o(1)}$ passes. Our algorithms are based on implicit hopsets, which are large hopsets that can be represented implicitly in $\widetilde{O}(n)$ space. We introduce this notion and give new constructions for implicit hopsets with small hopbound. Along the way, we obtain new work-depth tradeoffs for parallel shortest paths in directed graphs, improving the recent result of Ashvinkumar, Bernstein, Probst Gutenberg, and Saranurak (2026).

0.20

Stochastic Corridor Time Network Capacity Planning for Low Altitude Airspace Systems

cs.CE ·2026-08-11 ·Yipu Yao, Li Ding, Yanlu Zhao
similarity 0.57
Abstract

Regulators in China, the United States, and the European Union now provide low-altitude airspace access as priced, time-windowed corridor authorizations, booked in advance and forfeited if unused. We ask how much capacity a UAV logistics planner should reserve on each corridor--time unit before demand is realized, to maximize expected profit net of reservation cost. Reserved capacity cannot be transferred across corridors or time windows and is consumed jointly along time-respecting paths, so reservations are coupled through the network in ways that models with exogenous airspace capacity cannot capture. We formulate a two-stage stochastic program whose recourse selects and routes accepted requests on a time-expanded network, prove its arc-based and path-packing forms equivalent, and solve it by Benders decomposition with column-generated subproblems. The decomposition operates on the LP relaxation, and all reported reservation and routing decisions are recovered as integer plans. Computational experiments achieve single-digit LP-Benders gaps on moderate-sized networks and extend to much larger instances through a truncated-path approach. A Shenzhen case study shows reservations concentrating on structurally central corridors, with demand level and reservation price having more influence on the quantity of capacity reserved than the selection of corridors.

0.04