CS Paper Radar

The Complexity of Value Optimization in Sporadic Task Systems

Christopher Harbourne, Nathan Fisher, Kecheng Yang, Pontus Ekberg, Sanjoy Baruah, Zhishan Guo

cs.CC cs.DS ·submitted 2026-10-26 02:21 UTC · v1
theory

Abstract

Value-based Task Selection (VTS) asks whether a real-time system can select tasks whose total value reaches a required target while preserving every deadline. We study its threshold decision form for finite collections of independent sporadic tasks scheduled preemptively on one processor. We prove that this problem is $Σ_2^P$-complete for both constrained and arbitrary deadlines, even when all numerical parameters are encoded in unary. The existential choice is the selected task set, while the universal condition requires every processor-demand window to remain feasible. Our hardness reduction already uses constrained-deadline tasks. It represents universal assignments by Chinese Remainder Theorem timestamps and uses polynomial-weight local selector locks to enforce a valid existential assignment. The reduction produces polynomially many tasks, and every generated execution time, deadline, period, task value, and target is polynomially bounded in the source-instance size.

Comment
31 pages, 5 figures, 2 tables

Closest papers

Nearest neighbours by meaning across the whole index.

Strong NP-Hardness and Approximation Algorithm for Weighted Tardiness with Release Dates and Identical Processing Times

cs.CC cs.DMmath.CO ·2026-09-23 ·Zhi-Long Chen, Nicholas G. Hall
theory similarity 0.64
Abstract · 38 pages, 2 figures, 5 tables

We study nonpreemptive scheduling on a single machine with release dates, due dates, positive job weights, and a common processing time. The objective is to minimize total weighted tardiness. Although closely related equal-processing-time problems admit polynomial-time algorithms, the complexity of this problem has remained open in the literature since 2010. We prove that its decision version is strongly NP-complete, even when every job can meet its due date if processed immediately upon release. The reduction is from unweighted MAX-CUT and uses a quadratic number of jobs with polynomially bounded numerical data. Its main ingredient is a constructive normalization theorem that converts every sufficiently inexpensive feasible schedule into a binary choice for each graph vertex; after normalization, total weighted tardiness equals a constant minus a scaled cut value. We also give a deterministic polynomial-time phase-grid assignment algorithm for the shifted objective $Φ=F+p\sum_jw_j$, where $F$ is total weighted tardiness. The algorithm enumerates at most $N$ release-date residues modulo $p$, solves one minimum-cost assignment problem for each residue, and returns the best phase-grid schedule. It runs in $O(N^5)$ arithmetic operations and achieves the tight ratio $3/2-1/(2N)$ for this algorithm. Because the added term $p\sum_jw_j$ is independent of how the jobs are scheduled, the shifted and original objectives have exactly the same optimal schedules. However, the approximation guarantee applies to the shifted objective; for the original objective, the analysis provides an additive bound. Thus, the paper both resolves the long-standing complexity question and provides a complementary worst-case guarantee for the phase-grid assignment algorithm.

0.21

Scheduling to Maximize Weighted Throughput with an Active-Time Budget

cs.DS ·2026-08-29 ·Susanne Albers, G. Wessel van der Heijden
publishedtheory similarity 0.63
Abstract · 16 pages, 5 figures, To appear at WAOA 2026

We study the active-time scheduling problem with weighted throughput maximization. In this setting, a set of $n$ jobs $J$ arrive at integer release times, each with an integer processing time and integer deadline. Jobs may be preempted at integer time slot boundaries. A schedule assigns jobs to time slots, with at most $m$ jobs assigned to the same time slot. A slot is called \emph{active} if at least one job is scheduled in it. Instead of scheduling all jobs to minimize the number of active time slots, we consider the more general variant of \emph{weighted throughput} with an active-time budget $K$, where each job $j\in J$ has a weight $w_j$. The objective is to maximize the total weight of \emph{completed} jobs using at most $K$ active time slots. This means that partially scheduled jobs do not count towards the objective. The classical active-time minimization problem is recovered by asking whether all jobs can be completed within a given active-time budget. We give hardness, approximation, and exact algorithmic results. For general intervals with unbounded parallelism, we prove NP-hardness, rule out an FPTAS unless $\mathrm{P}=\mathrm{NP}$, and give a pseudo-polynomial time $Ω(1/\log K)$-approximation. For proper intervals, we prove a canonical structural lemma and obtain an exact $(nK)^{O(m)}$-time algorithm. For laminar intervals, we give an exact $f(K,m)\cdot n^{O(1)}$-time algorithm.

0.25

An EPTAS for Vector Scheduling with Time Intervals

cs.DS cs.CC ·2026-09-27 ·Junho Hwang
theory similarity 0.63
Abstract · 18 pages, 4 figures. v2: extended to several resources and unrelated machines, with a new title and simplified proofs

We study vector scheduling in which each job is active during a fixed time interval. A job uses several resources and stays on one machine for its entire interval; its resource requirements may depend on the machine. The objective is to minimize the largest resource load over all machines and times. For $r$ machines and $d$ resources, we give a deterministic $(1+\varepsilon)$-approximation in $f(r,d,1/\varepsilon)N^{O(1)}$ time, where $N$ is the binary input length. This gives an efficient polynomial-time approximation scheme for fixed $r$ and $d$, extending approximation schemes for scalar temporary tasks assignment. The algorithm merges jobs into blocks whose time intervals are fixed before any machine is chosen, and assigns the blocks by dynamic programming over a balanced recursive split of the time line. We also prove strong NP-hardness and an exponential lower bound in $1/\varepsilon$ under the Exponential Time Hypothesis, already for two identical machines and one resource.

0.13

Exact Locality Gaps for Matchable Semi-Matchings

cs.DS cs.DM ·2026-10-01 ·Marek Gałązka, Hanna Wdowicka
code/data similarity 0.61
Abstract · 11 pages. Verification code and data: https://github.com/mgalazka84/semimatching-locality-gaps

An assignment of tasks to servers can resist every small improvement and still make tasks wait longer than necessary. We determine exactly how inefficient such an assignment can be when each task requires one unit of service and the eligibility constraints permit all tasks to use distinct servers. For every move size $r$ and maximum current server load $K$, we give a closed formula for the worst ratio between locally optimal and globally optimal total completion time. Local optimality here allows every feasible reassignment changing at most $r$ tasks. Every finite-cap bound is attained on a tree where each task has at most two eligible servers. Thus the worst behavior already occurs under simple eligibility constraints. At load cap two, the exact ratio is $1+1/(r+2)$, attained on a path with $r+2$ tasks. Without a load cap, the worst-case supremum is $3/2$ for single-task moves and approximately $1.294503159$ for two-task moves; its excess above one is $1/(r+2)+O(2^{-r}/r)$ as $r$ grows. The proof uses an explicit rational potential on a comparison graph and matching extremal constructions. These results give sharp guarantees for bounded-size local search on matchable semi-matchings, including exact guarantees under degree bounds.

0.30

Scheduling with Mandatory Breaks: NP-Hardness and an Additive-One Approximation

cs.DS ·2026-09-28 ·Shreyas Ghildiyal, Muralidhara V N
similarity 0.60
Abstract

In classical fixed-interval scheduling, each job of a given set must be processed during a prescribed time interval. The goal is to assign each job to exactly one machine such that no two jobs assigned to the same machine overlap in their interiors, and the number of machines used is minimized. Without further constraints this is interval graph coloring and is solvable in polynomial time through greedy approaches. We study a variant in which every used machine must remain idle during a contiguous \emph{break} of prescribed length $x$ somewhere in the scheduling horizon. We show that this additional constraint makes the problem hard, except when $x\le1$. First, for every fixed $x\ge2$, deciding whether $k$ machines suffice for the assignment of a given set of jobs is NP-complete, even when all coordinates are bounded linearly in the number of jobs, so machine minimization is strongly NP-hard. Second, for $x=1$, we give a polynomial-time algorithm that solves the problem exactly. Finally, we give a deterministic polynomial-time algorithm that, on every feasible instance, outputs a schedule using at most $\OPT+1$ machines, where $\OPT$ is the true minimum. Unless $\mathrm{P}=\mathrm{NP}$, no polynomial-time algorithm guarantees $\OPT$ machines for any fixed $x\ge2$, so the additive guarantee of one is best possible.

0.07

Asymmetric Weighted Earliness-Tardiness: Scheduling with a Nonrestrictive Common Due Date

cs.CC math.OCcs.DMmath.CO ·2026-09-12 ·Nicholas G. Hall, Hans Kellerer, Miao Song
similarity 0.60
Abstract · 268 pages, 12 figures, 29 tables

Single-machine asymmetric weighted earliness--tardiness (AWET) scheduling asks how to sequence jobs around a common synchronization date when early and late completion incur unrelated job-dependent penalties. At the boundary nonrestrictive date $d=\sum_jp_j$, a compact V-shaped schedule reduces the continuous-time problem to a quadratic choice of a nonempty early set. We establish four complementary results for this model. First, the positive-integer problem is strongly NP-complete by a unary-polynomial reduction from Restricted Exact Cover by 3-Sets. Second, unrestricted AWET admits a polynomial-time $(3+2\sqrt2+\varepsilon)$-approximation based on an anchored semidefinite relaxation and deterministic marginal thresholding. Third, when the earliness and tardiness ratio orders are strict reversals, the problem is weakly NP-complete but has an exact two-resource pseudopolynomial dynamic program. Fourth, for fixed total refinements whose ratio permutation is separable, an exact separating-tree recurrence and coordinated geometric trimming yield an FPTAS. The proofs use different manifestations of the same canonical objective: scale-separated prefix penalties, positive-semidefinite minimum-kernel covariance, a dominant completed load square, and a bounded four-coordinate decomposition interface. Together, the results show that the decisive issue is not merely whether the two ratio orders agree, but whether their interaction can be controlled by a global certificate or compressed into a bounded constructive interface.

0.21

Speedup-Aware Rounding for Scheduling Malleable Tasks with Precedence Constraints

cs.DS ·2026-11-11 ·Chi-Yeh Chen
similarity 0.59
Abstract · 31 pages; ancillary files contain the numerical verification programs

We study the scheduling of malleable tasks with precedence constraints on $m$ identical processors to minimize the makespan, assuming that the processing time of a task does not increase and its work does not decrease with the number of processors, and that the work is a convex function of the processing time. The standard two-phase method solves a linear program, rounds the fractional processing times to allotments, caps the allotments at a threshold $μ$, and runs list scheduling. We propose \emph{speedup-aware rounding}, which rounds a task to its slower allotment exactly when this allotment is at most a factor $a$ slower than the fractional processing time. We determine the worst-case increase of the work under this rule exactly and show that no per-task rounding rule with time factor $a$ does better. With $μ=\lceilβ(a)m\rceil$ the algorithm achieves the approximation ratio $13(30+\sqrt{493})/225\approx3.0162$ for every $m$, which improves the previous bound $2+\sqrt2\approx3.4142$; a single task with linear speedup shows that its ratio is at least $\approx2.9558$. For concave speedup functions, which include the roofline, communication, Amdahl and power-law models, the ratio becomes $\approx2.9739$, which improves the ratio $\approx3.2919$ of Jansen and Zhang. We also revisit the strictly decreasing case of our earlier work (Chen and Chu, 2013): the reported ratio $2.9549$ relies on an elimination step that is not valid. In this case the algorithm coincides with that of Jansen and Zhang up to its parameters, and with parameters chosen by the corrected analysis it guarantees their ratio $\approx3.2919$. Finally, without convexity no per-task rounding improves the known time--work trade-off, and the analysis cannot go below $(3+\sqrt5)/2$.

0.23

Quality-Aware Cross-Model Computation Reuse

cs.IR ·2026-10-04 ·Jin Cheng, Xiangxiang Dai, Maoli Liu, Ziyi Han, Zhuohua Li +1 more
similarity 0.58
Abstract

An intermediate result computed by one model can be reused by other models to perform their tasks. Existing work mainly focuses on practical execution, leaving a theoretical gap in optimizing reuse decisions. This optimization faces two challenges: quality uncertainty, because the effect of reuse on task quality is uncertain across models, and coupled scheduling, because tasks need to share the cost of preparing reusable results. These challenges compound each other: quality must be learned online, but the shared preparation structure makes scheduling NP-hard even with known quality, breaking the key assumption in existing methods. We formulate cross-model computation reuse as an online decision problem and develop the Quality-Aware Reuse Scheduling (QARS) algorithm to address it. For quality uncertainty, QARS learns task-dependent reuse quality from selected, possibly delayed feedback and uses optimistic estimates to guide decisions. For coupled scheduling, it jointly chooses which results to prepare and which tasks should use them, adapting scheduling accuracy to the remaining quality uncertainty. For the considered problem, our analysis separates learning and optimization error in regret and quantifies the tradeoff between scheduling accuracy and computation. Completing the quality-aware stopping rule yields $\widetilde O(\sqrt{T})$ regret while preserving feasibility. Experiments demonstrate the effectiveness of QARS in optimizing cross-model reuse, reducing the combined cost of computation and quality loss by up to 18.0%, and mean regret by 63.9% over the strongest scheduling baseline.

0.19