Moving bits instead of watts: Accelerating global AI data-centre deployment at the energy-digital-water-land nexus

Jiawei Qu, Xiaoying Shi, Kai Hou, Hongjie Jia, Jinyue Yan

eess.SY ·submitted 2026-10-26 09:30 UTC · v1

Abstract

Artificial intelligence is driving an unprecedented expansion of data centres. However, this growth is increasingly stalled by grid transmission constraints that trap new data centres in years-long connection queues. Unlike electricity, computation can be moved across the globe through fibre-optic networks, but whether this spatial transfer can bypass constrained grids and accelerate global AI data-centre deployment remains unknown. Here we develop a global framework that places future data-centre capacity in energy-abundant regions and routes computational workloads through fibre-optic networks rather than transmitting electricity. We evaluate the framework through more than 11 million hourly operation simulations at subnational resolution, integrating constraints on energy systems, water, digital connectivity, land and financing risk. Results show that across multiple data-centre development and climate-policy scenarios, leveraging global data transfer allows new data centres to be sited where these conditions are favourable, lowering construction costs by 44-47% and carbon emissions by 38%. By treating the global fibre-optic network as an energy-system asset, it avoids 34-67 GW of high-voltage transmission capacity, comparable in magnitude to Italy's national peak electricity demand. Crucially, this methodology could bring more than 95% of connection-delayed data centres online in 2030, with Canada, the Nordic countries and the Arabian Peninsula emerging as preferred locations for data-centre development. Our findings establish computational mobility as an alternative to energy-system expansion, informing the coordinated global development of energy and artificial-intelligence infrastructure.

Closest papers

Nearest neighbours by meaning across the whole index.

Computing at Sea: Floating and Offshore Data Centres as a Pathway to Sustainable AI Infrastructure

eess.SY cs.AI ·2026-09-11 ·Cheng Siong Chin, Jianhua Zhang, M. Venkateshkumar
similarity 0.74
Abstract · 7 pages, 2 figures, 2 tables

The rapid expansion of artificial intelligence is transforming data centres into one of the world's fastest-growing sources of electricity demand. As AI systems scale in size and capability, the physical infrastructure supporting computation is approaching critical limits in energy availability, cooling capacity, land use, freshwater consumption, and carbon management. Conventional land-based data centres are increasingly constrained by urban land competition, grid congestion, environmental pressures, and lengthy permitting processes, raising fundamental questions about where future computing infrastructure can sustainably exist. This article examines floating and offshore data centres as an emerging alternative model for digital infrastructure. By relocating computation to marine environments, offshore systems can exploit the ocean's natural cooling capacity, reduce freshwater dependence, and enable direct integration with offshore renewable energy resources such as wind, wave, and tidal power. Early deployments have demonstrated the potential for significantly improved energy efficiency and operational reliability compared with conventional facilities, while also opening new possibilities for distributed and resilient computing architectures. The article explores how offshore computing may reshape the future relationship between electrification, renewable energy, and large-scale AI infrastructure. It analyses the opportunities and trade-offs associated with marine deployment, including environmental impacts, engineering design challenges, economic feasibility, and regulatory governance. Rather than treating offshore data centres as experimental novelties, the article presents them as part of a broader systems-level transition in how society may power, cool, and sustain the next generation of computational growth.

0.29

Speed-to-Power Dominates Energy Costs for AI Data Centers: Technoeconomic Analysis of Powering AI in the Continental United States

cs.AI eess.SY ·2026-11-12 ·Alex C. Newkirk, Daniel L. Gerber, Erica R. H. Fuchs, Alex Hubbard, M. Granger Morgan +3 more
code/datahot direction similarity 0.72
Abstract · 80 pages incl. SI

The rapid growth of artificial intelligence is driving demand for new data centers at large scale and on short deployment timelines. To power them, firms connect to the commercial grid or contract generation directly, but interconnection and gas-turbine delays now incentivize on-site generation. We compare grid-connected and off-grid data center energy infrastructure (AC- and DC-coupled solar-plus-storage, islanded natural gas, and grid interconnection) across the continental U.S. Using an open-source technoeconomic framework built on empirically calibrated AI training loads, climate-driven cooling, stage-by-stage power conversion, and physics-based battery degradation, we model designs providing equivalent energy services. Our central contribution is a speed-adjusted cost of energy that values the compute unlocked by faster construction, making options with different deployment timelines directly comparable on one physically consistent basis. We find DC coupling reduces lifetime energy costs by 18% ($0.09/ kWh) on average versus AC counterparts by eliminating inverters and improving efficiency. Though rarely cheapest on unadjusted energy cost, DC-coupled microgrids' faster deployment makes them the lowest-cost modeled option in 85% of U.S. locations once foregone compute is valued, or 55% under accelerated natural gas timelines. For AI infrastructure, deployment speed rather than unit energy cost determines the economically preferred path to power.

0.31

Quantifying the hosting capacity value of workload flexibility for AI data centers: A two-stage electricity-computation co-optimization framework

eess.SY ·2026-11-18 ·Jiakai Wu, Wei Sun, Pengyu Ren, Yifan Wang
hot direction similarity 0.68
Abstract

Grid connection constraints increasingly limit the expansion of AI data centers, yet the additional hosting capacity enabled by computational workload flexibility remains insufficiently quantified. This paper develops a two-stage electricity--computation co-optimization framework to quantify the individual and coordinated hosting capacity values of spatial and temporal workload flexibility. Data center capacities are determined endogenously, with computational task arrivals scaling with admitted capacity. Spatial routing of eligible interactive requests and temporal deferral of batch workloads are linked to server operation and facility power demand, subject to workload completion requirements and transmission constraints. The first stage maximizes aggregate hosting capacity; the second fixes the resulting site capacities and optimizes annual workload scheduling and generation dispatch to minimize generation and carbon costs. An 8760-hour case study with three data centers on a modified IEEE 118-bus system shows that temporal and spatial flexibility individually increase hosting capacity by 21.26\% and 5.37\%, respectively. Their coordinated use raises hosting capacity from 4635.1~MW to 6231.5~MW, a 34.44\% increase without network reinforcement. The coordinated gain exceeds the sum of the individual gains by 361.9~MW, demonstrating complementarity between spatial migration and temporal deferral. By redistributing computational demand across locations and operating hours, these mechanisms enable fuller utilization of existing transmission capacity. The findings establish workload flexibility as a quantifiable planning resource for accommodating additional data center capacity within existing transmission networks.

0.28

CATS: A Carbon-Aware Task Simulator for Reducing AI Data Center Emissions

cs.DC ·2026-09-13 ·Dayuan Chen, Ziliang Zong
similarity 0.68
Abstract · 14 pages, 12 figures, 8 tables

The rapid rise of generative AI is accelerating cloud data center expansion, with electricity demand projected to double by 2026. Because carbon-intensity varies by more than 5.5x across grids and times of day, where and when inference tasks execute significantly affects operational emissions. We address this issue with three aspects in this paper. First, we compile a global alignment dataset unifying 140 operational and planned cloud regions across 8 major providers with five-minute carbon-intensity traces for 145 grid regions from 2022 to 2024, revealing that 50% of current sites lie in medium-to-high carbon-intensity grids, indicating a siting-carbon mismatch and unrealized carbon reduction potential. Second, we develop CATS (Carbon-Aware Task Simulator), a flexible trace-driven framework that profiles six AI inference tasks across multiple GPU types, synthesizes realistic diurnal curve, geographical and task mixes, and SLA constraints, and evaluates spatial and temporal schedulers against two baselines while reporting comprehensive metrics including carbon emissions, energy consumption, runtime, queue delay, and hardware utilization. Third, we quantify achievable CO2 savings under realistic constraints: in a 24-hour trace with 600,000 tasks at fleet utilization of 0.37, spatial shifting reduces CO2 by 38.4% versus speed-first baseline, while temporal shifting yields 16% savings with bounded SLA violations at 3.27%. These results advocate locating future data centers in low carbon-intensity grids and demonstrate that carbon-aware scheduling on today's fleets can achieve substantial operational emissions reduction.

0.18

Spatial LLM Workload Shifting Needs Foresight: Model Commitment for AI Data Center Operation under Power Grid Constraints

eess.SY ·2026-09-09 ·Bojun Du, Hongyang Jia, Tonghui Li, Qingchun Hou, Ze Wang +2 more
similarity 0.68
Abstract · 3 pages, 2 figures

AI data centers may face power supply shortages during certain periods, requiring operators to shift large language model (LLM) inference workloads spatially to maintain service rates. However, existing workload-shifting methods typically assume that any data center with sufficient computing resources can immediately serve shifted requests, which may lead to infeasible transfers and unserved demand. This letter proposes model commitment (MC), a mixed-integer linear programming framework that jointly schedules model deployment and cross-site request routing under power constraints and electricity-price signals. First, MC formulates the intertemporal coupling introduced by model replica loading. Second, it translates prefill and decode latency requirements into the amount of demand that each replica can serve. Case studies based on real-world data show that MC enables AI data center operators to achieve a 100% service rate under time-varying grid conditions and reduce total operating cost by 29.0%.

0.24

Investigating the Impact of CI-Source Sensitivity in Carbon-Aware Resource Management Systems

cs.DC ·2026-11-16 ·Gonçalo Ferreira, Jaime Iglesias Blanco, María Castrillo, Álvaro López García, Li Wu +1 more
similarity 0.66
Abstract · 9 pages, 6 figures, 6 tables

The sustainable growth of data centres increasingly depends on Resource-Management Systems (RMSs) that aim to reduce carbon emissions of computing workloads without degrading performance. This need is intensified by the rise of Artificial Intelligence (AI) workloads, which demand exponentially growing amounts of compute and energy across geographically distributed infrastructure. Recent carbon-aware RMSs exploit temporal and spatial variation in grid Carbon Intensity (CI) to shift workloads towards lower-carbon periods or locations. In practice, CI estimates and forecasts can be inaccurate and uncertain, and CI providers' methods differ substantially. Such discrepancies may have a significant impact on RMS placement decision-making, raising concerns about the fragility of existing solutions. Thus, in this work, we ask how discrepancies between plausible CI estimates propagate into resource-management decisions and operational outcomes. To answer this question, we harmonise and characterise CI traces from Wattnet and ElectricityMaps across five Central European zones. We then propose our evaluation framework: External CI Signal Characterisation And Perturbation Evaluation (ESCAPE), which assesses provider switching and controlled CI perturbations in a reproduced placement setting. We implement our framework using CarbonEdge as a use case, and measure changes in placement decisions and operational outcomes, such as carbon proxy, energy use, and latency. Our results show that switching CI-source changes the dominant placement site in 43.50% cases, and alters reported operational outcomes. These changes occur despite high rank correlation and structured disagreement between CI-sources. This observed sensitivity to CI-source choice motivates robustness-aware carbon-aware placement, in which CI uncertainty should be explicitly accounted for in resource-allocation decisions.

0.20

Water-Energy-Data nexus reveals sustainability gaps and priorities for AI infrastructure

cs.CY ·2026-10-16 ·Jincheng Huang, Guoan Xiao, Xin Lan, Caichun Yin, Zhimeng Jiang +2 more
similarity 0.66
Abstract

The rapid growth of artificial intelligence (AI) depends on interconnected water, energy, and data systems spanning infrastructure life cycles and diverse geographies, with the potential to intensify water and energy insecurity, exacerbate social inequities and lead to cascading sustainability issues globally. Yet assessments commonly examine them separately, limiting our understanding of where resource pressures arise, how they are transferred across space, and who bears their consequences. To address these challenges, we established a water-energy-data (WED) nexus framework that captures the spatial and life-cycle dependencies of AI infrastructure, and use large language models to synthesize 12,825 water- or energy-related studies across four resource-intensive AI infrastructure activities: mineral extraction, semiconductor manufacturing, data center operation and electronic-waste processing. The evidence map identifies a mismatch between the interconnected activities supporting AI infrastructure and boundaries used to assess them. Researchers assess operational energy more than water use and other indirect demands, while interactions across locations and life-cycle activities remain understudied. These gaps obscure how resource demands shift among infrastructure nodes and regions, and how data-enabled benefits compare with their underlying costs. The WED nexus provides a foundation for integrated assessment of spatially metacoupled systems, while the evidence map can inform priorities for managing the sustainability implications of the AI boom.

0.10

Data center cooling choices shift water impacts across the grid: An integrated water-energy model for sustainable data center development

eess.SY cs.CYcs.DC ·2026-09-21 ·Garrett Alston, Nancy Love, Rabab Haider
code/data similarity 0.65
Abstract · 12 pages; 8 figures; 6 tables; appendix

Data centers are being developed at an unprecedented pace, yet their energy and water impacts, and the spatial and temporal distribution of these impacts, remain poorly characterized. Data centers consume water for cooling (direct) and through electricity generation (indirect). Decisions on siting and cooling technology result in water-energy trade-offs that extend impacts beyond the facility's location. Existing assessment frameworks rely on facility efficiency metrics and average grid water intensity factors, suppressing the temporal impacts of data center load and generation availability. They also attribute indirect consumption to the facility's location rather than to the generators (and corresponding hydrologic regions) that respond to the added load, misattributing spatial impacts. To close this gap, we develop a computational model of the data center-energy-water nexus that links facility cooling and electricity demand with hourly economic dispatch, generator-level water consumption, and monthly subbasin depletion. Built on open-source data, the model resolves where and when water is consumed, and where this consumption compounds existing water risk or creates new risk. Using the model, we study different cooling configurations and proposed developments in the state of Michigan. Air-cooled data centers halve total water consumption relative to evaporative cooling, but increase electricity demand and raise indirect water consumption by one-third, shifting the water footprint from the facility to generators. Mapping these changes to subbasins reveals depletion increases beyond the data center sites, in regions that facility-level reporting may overlook. These results show that data center water and energy impacts cannot be assessed in isolation, motivating the need for integrated modeling to inform siting, design, and reporting practices.

0.22