Faster Exponential Algorithms for Multi-Machine Scheduling Problems

Anubhav Dhar, Anita Dürr, Ahmed Ghazy, Jakob Greilhuber, Karol Węgrzycki

cs.DS ·submitted 2026-08-12 16:22 UTC · v1
published

Abstract

Minimizing the weighted completion times ($P \mid \mid Σw_j C_j$) and weighted number of tardy jobs ($P \mid \mid Σw_j U_j$) on multiple identical machines are two classical NP-hard scheduling problems. As shown by Lenté et al. (2014), both problems can be solved in time ${O}^{\star}(3^n)$. In this paper, we improve these bounds to ${O}(2.755^n)$ and ${O}^{\star}(2^n)$, respectively. Our algorithm for $P \mid \mid Σw_j C_j$ exploits the meet-in-the-middle paradigm and an efficient data structure answering linear programming queries. Additionally, when the number of machines is at most $6$, we show that the running time for $P \mid \mid Σw_j C_j$ can further be improved. Both scheduling problems are generalizations of the classical Bin Packing problem, which can be solved in ${O}^{\star}(2^n)$ time. Improving this running time is an important open question. We show that, when assuming the Asymptotic Rank Conjecture (ARC), Bin Packing can be solved in time ${O}((2-\varepsilon)^n)$ for some $\varepsilon >0$. Our algorithm makes use of two main ingredients: the recent ${O}((2-\varepsilon)^n)$-time algorithm of Nederlof et al. [SICOMP'23] for Bin Packing when the number of bins is a fixed constant, and the ${O}((2-\varepsilon)^n)$-time algorithm of Björklund et al. [SODA'25] for special instances of the $3$-way Partitioning problem when assuming ARC.

DOI
10.4230/LIPIcs.ESA.2026.53

Closest papers

Nearest neighbours by meaning across the whole index.

Parallel Machine Scheduling with a Singler Server and Loading-Unloading Operations

cs.DS math.OC ·2026-08-12 ·Keramat Hasani, Frank Werner
theory similarity 0.68
Abstract · 20 pages, 3 figures

This paper investigates a parallel machine scheduling problem featuring a single common server responsible for both loading and unloading operations. Each job consists of a unit-time loading operation, non-preemptive processing on one of \(m\) identical machines, and a unit-time unloading operation executed by the same server. The objective is to minimize the makespan. Unlike classical loading-only common-server models, our setting requires the server to handle an unloading operation immediately after a job's processing phase concludes. We prove that the corresponding decision problem is strongly NP-complete when the number of machines is given as part of the input. Furthermore, we analyse the worst-case performance of the List Scheduling (LS) and Longest Processing Time (LPT) heuristics. For three machines, we establish that Algorithm LS achieves an approximation ratio of at most \(5/2\). For an arbitrary fixed \(m \ge 3\), we show that the general LS bound approaches \(4-3/m\) as the number of jobs grows, whereas for Algorithm LPT, we prove the finite-instance ratio $3-\frac{2}{m}+\frac{(m-1)(m-2)}{mn}.$ Thus, for each fixed \(m\), the LPT bound approaches \(3-2/m\) as the number of jobs grows.

0.38

An EPTAS for Vector Scheduling with Time Intervals

cs.DS cs.CC ·2026-09-27 ·Junho Hwang
theory similarity 0.67
Abstract · 18 pages, 4 figures. v2: extended to several resources and unrelated machines, with a new title and simplified proofs

We study vector scheduling in which each job is active during a fixed time interval. A job uses several resources and stays on one machine for its entire interval; its resource requirements may depend on the machine. The objective is to minimize the largest resource load over all machines and times. For $r$ machines and $d$ resources, we give a deterministic $(1+\varepsilon)$-approximation in $f(r,d,1/\varepsilon)N^{O(1)}$ time, where $N$ is the binary input length. This gives an efficient polynomial-time approximation scheme for fixed $r$ and $d$, extending approximation schemes for scalar temporary tasks assignment. The algorithm merges jobs into blocks whose time intervals are fixed before any machine is chosen, and assigns the blocks by dynamic programming over a balanced recursive split of the time line. We also prove strong NP-hardness and an exponential lower bound in $1/\varepsilon$ under the Exponential Time Hypothesis, already for two identical machines and one resource.

0.13

Scheduling with Mandatory Breaks: NP-Hardness and an Additive-One Approximation

cs.DS ·2026-09-28 ·Shreyas Ghildiyal, Muralidhara V N
similarity 0.64
Abstract

In classical fixed-interval scheduling, each job of a given set must be processed during a prescribed time interval. The goal is to assign each job to exactly one machine such that no two jobs assigned to the same machine overlap in their interiors, and the number of machines used is minimized. Without further constraints this is interval graph coloring and is solvable in polynomial time through greedy approaches. We study a variant in which every used machine must remain idle during a contiguous \emph{break} of prescribed length $x$ somewhere in the scheduling horizon. We show that this additional constraint makes the problem hard, except when $x\le1$. First, for every fixed $x\ge2$, deciding whether $k$ machines suffice for the assignment of a given set of jobs is NP-complete, even when all coordinates are bounded linearly in the number of jobs, so machine minimization is strongly NP-hard. Second, for $x=1$, we give a polynomial-time algorithm that solves the problem exactly. Finally, we give a deterministic polynomial-time algorithm that, on every feasible instance, outputs a schedule using at most $\OPT+1$ machines, where $\OPT$ is the true minimum. Unless $\mathrm{P}=\mathrm{NP}$, no polynomial-time algorithm guarantees $\OPT$ machines for any fixed $x\ge2$, so the additive guarantee of one is best possible.

0.07

Approximation algorithms for identical parallel machine scheduling with assignment costs

cs.DS ·2026-10-24 ·Wei Li
similarity 0.64
Abstract

We study non-preemptive scheduling on identical parallel machines in which assigning job $j$ to machine $M_i$ incurs the cost $c_{ij}=a_iw_j+b_j$. The processing times $p_j$ and the cost weights $w_j$ are independent, and the number of machines is part of the input. For every fixed $\varepsilon\in(0,1]$ and every deadline $T$ for which a schedule with makespan at most $T$ exists, we give a polynomial-time algorithm that computes a schedule with makespan at most $(1+\varepsilon)T$ whose total assignment cost does not exceed the minimum under the deadline $T$. Using this algorithm as a subroutine, we obtain a polynomial-time approximation scheme for minimizing the makespan under a total cost budget whose schedules always satisfy the budget; this answers an open question for costs $c_{ij}=l_ic_j$ with $c_j$ independent of $p_j$. For the lexicographic problem, in which the total assignment cost is minimized among all schedules of minimum makespan, we obtain in polynomial time a schedule with makespan at most $1+\varepsilon$ times the minimum and total assignment cost at most that of a lexicographically optimal schedule; this improves the makespan guarantees of earlier algorithms for additive and multiplicative costs. For costs $c_{ij}=s_i+a_iw_j$, where $s_i$ is charged for each job processed on $M_i$, the same guarantees are obtained in quasi-polynomial time.

0.24

Strong NP-Hardness and Approximation Algorithm for Weighted Tardiness with Release Dates and Identical Processing Times

cs.CC cs.DMmath.CO ·2026-09-23 ·Zhi-Long Chen, Nicholas G. Hall
theory similarity 0.64
Abstract · 38 pages, 2 figures, 5 tables

We study nonpreemptive scheduling on a single machine with release dates, due dates, positive job weights, and a common processing time. The objective is to minimize total weighted tardiness. Although closely related equal-processing-time problems admit polynomial-time algorithms, the complexity of this problem has remained open in the literature since 2010. We prove that its decision version is strongly NP-complete, even when every job can meet its due date if processed immediately upon release. The reduction is from unweighted MAX-CUT and uses a quadratic number of jobs with polynomially bounded numerical data. Its main ingredient is a constructive normalization theorem that converts every sufficiently inexpensive feasible schedule into a binary choice for each graph vertex; after normalization, total weighted tardiness equals a constant minus a scaled cut value. We also give a deterministic polynomial-time phase-grid assignment algorithm for the shifted objective $Φ=F+p\sum_jw_j$, where $F$ is total weighted tardiness. The algorithm enumerates at most $N$ release-date residues modulo $p$, solves one minimum-cost assignment problem for each residue, and returns the best phase-grid schedule. It runs in $O(N^5)$ arithmetic operations and achieves the tight ratio $3/2-1/(2N)$ for this algorithm. Because the added term $p\sum_jw_j$ is independent of how the jobs are scheduled, the shifted and original objectives have exactly the same optimal schedules. However, the approximation guarantee applies to the shifted objective; for the original objective, the analysis provides an additive bound. Thus, the paper both resolves the long-standing complexity question and provides a complementary worst-case guarantee for the phase-grid assignment algorithm.

0.21

Minimizing the Makespan Approximately on Two Identical Parallel Machines with a Loading--Unloading Server

cs.DS math.OC ·2026-08-19 ·Keramat Hasani, Frank Werner
theory similarity 0.64
Abstract · 29 pages, 1 appendix

We study makespan minimisation on two identical parallel machines that share a single server for both loading and unloading. Each job must be loaded, processed without interruption on its assigned machine, and unloaded immediately after processing, with a common positive integer duration for all loading and unloading operations. We prove that the decision problem is NP-complete for every fixed server-operation duration and strongly NP-complete when this duration is part of the input. We then analyse ordinary list scheduling and the longest-processing-time rule in the non-unit setting. List scheduling has a tight supremum ratio of two. For the longest-processing-time rule, we obtain the exact worst-case ratio when all processing times are at least the server-operation duration, and derive new parameter-dependent lower and upper bounds for unrestricted instances. The results show that both processing-time granularity and blocking generated by short jobs shape the approximation behaviour of the common-server problem.

0.08

Busy Time Minimization with Preemption, Migration, and One Resource Requirement

cs.DS ·2026-09-19 ·Gruia Calinescu, Mozhengfu Liu
similarity 0.63
Abstract

We study the Busy Machine Time with Preemption and Migration and One Resource Requirement problem, motivated by energy minimization in cloud data centers. Given unlimited identical-capacity machines and jobs with release times, deadlines, processing times, and resource requirements, we allow free preemption and migration at integer times and seek to minimize total machine busy time. The problem is NP-hard, and previous results consist of a 2-approximation, 2-competitive algorithm for the case of uniform heights. We obtain a 22/9 < 2.445-approximation algorithm and a 2.5-competitive online algorithm, both running in O(n^2 log n) time. Our methods are based on new non-asymptotic performance bounds for the First Fit Decreasing algorithm for Bin Packing, and a new generalization of Span Minimization, the Huge-Tiny Busy Time problem, for which we present an exact offline algorithm and an optimal (3/2)-competitive deterministic online algorithm.

0.10

Speed-Robust Scheduling for Total Completion Time

cs.DS cs.DM ·2026-11-16 ·Moritz Buchem, Nicole Megow, Morten Weber
similarity 0.63
Abstract

We study two-stage speed-robust scheduling for minimizing total completion time. Jobs must be partitioned into $M$ bags before an adversary reveals the speeds of at most $M$ machines. Each bag is then assigned to one available machine, and the jobs on each machine may be processed in any order independent of the bags. We compare with an optimal schedule that knows the speeds in advance and assigns jobs individually. This model has been studied for makespan minimization. We initiate its study for total completion time, as suggested by Stein and Zhong (TALG 2020). For an unknown number of identical machines, we show that the optimal deterministic robustness factor is exactly~$13/12$, both for unit-size jobs and for arbitrary processing times. For infinitesimally small jobs, the factor lies between $31/30\approx1.0333$ and $28/27\approx1.0370$, well below the optimal makespan factor of about $1.2071$. General speeds make the problem strictly harder: no deterministic algorithm is better than $1.2669$-robust, already for infinitesimally small jobs. We give a $25/16$-robust algorithm for arbitrary processing times and improve the guarantee to $1681/1152\approx1.4592$ for infinitesimally small jobs. Our main tools are a layer decomposition that extends guarantees from unit-size jobs to arbitrary processing times when one assignment satisfies them for every prefix in non-increasing processing-time order, and a threshold analysis of the bag counts produced by greedy assignment rules.

0.31