Speed-Robust Scheduling for Total Completion Time

Moritz Buchem, Nicole Megow, Morten Weber

cs.DS cs.DM ·submitted 2026-11-16 09:42 UTC · v1

Abstract

We study two-stage speed-robust scheduling for minimizing total completion time. Jobs must be partitioned into $M$ bags before an adversary reveals the speeds of at most $M$ machines. Each bag is then assigned to one available machine, and the jobs on each machine may be processed in any order independent of the bags. We compare with an optimal schedule that knows the speeds in advance and assigns jobs individually. This model has been studied for makespan minimization. We initiate its study for total completion time, as suggested by Stein and Zhong (TALG 2020). For an unknown number of identical machines, we show that the optimal deterministic robustness factor is exactly~$13/12$, both for unit-size jobs and for arbitrary processing times. For infinitesimally small jobs, the factor lies between $31/30\approx1.0333$ and $28/27\approx1.0370$, well below the optimal makespan factor of about $1.2071$. General speeds make the problem strictly harder: no deterministic algorithm is better than $1.2669$-robust, already for infinitesimally small jobs. We give a $25/16$-robust algorithm for arbitrary processing times and improve the guarantee to $1681/1152\approx1.4592$ for infinitesimally small jobs. Our main tools are a layer decomposition that extends guarantees from unit-size jobs to arbitrary processing times when one assignment satisfies them for every prefix in non-increasing processing-time order, and a threshold analysis of the bag counts produced by greedy assignment rules.

Closest papers

Nearest neighbours by meaning across the whole index.

Approximation algorithms for identical parallel machine scheduling with assignment costs

cs.DS ·2026-10-24 ·Wei Li
similarity 0.69
Abstract

We study non-preemptive scheduling on identical parallel machines in which assigning job $j$ to machine $M_i$ incurs the cost $c_{ij}=a_iw_j+b_j$. The processing times $p_j$ and the cost weights $w_j$ are independent, and the number of machines is part of the input. For every fixed $\varepsilon\in(0,1]$ and every deadline $T$ for which a schedule with makespan at most $T$ exists, we give a polynomial-time algorithm that computes a schedule with makespan at most $(1+\varepsilon)T$ whose total assignment cost does not exceed the minimum under the deadline $T$. Using this algorithm as a subroutine, we obtain a polynomial-time approximation scheme for minimizing the makespan under a total cost budget whose schedules always satisfy the budget; this answers an open question for costs $c_{ij}=l_ic_j$ with $c_j$ independent of $p_j$. For the lexicographic problem, in which the total assignment cost is minimized among all schedules of minimum makespan, we obtain in polynomial time a schedule with makespan at most $1+\varepsilon$ times the minimum and total assignment cost at most that of a lexicographically optimal schedule; this improves the makespan guarantees of earlier algorithms for additive and multiplicative costs. For costs $c_{ij}=s_i+a_iw_j$, where $s_i$ is charged for each job processed on $M_i$, the same guarantees are obtained in quasi-polynomial time.

0.24

Minimizing the Makespan Approximately on Two Identical Parallel Machines with a Loading--Unloading Server

cs.DS math.OC ·2026-08-19 ·Keramat Hasani, Frank Werner
theory similarity 0.67
Abstract · 29 pages, 1 appendix

We study makespan minimisation on two identical parallel machines that share a single server for both loading and unloading. Each job must be loaded, processed without interruption on its assigned machine, and unloaded immediately after processing, with a common positive integer duration for all loading and unloading operations. We prove that the decision problem is NP-complete for every fixed server-operation duration and strongly NP-complete when this duration is part of the input. We then analyse ordinary list scheduling and the longest-processing-time rule in the non-unit setting. List scheduling has a tight supremum ratio of two. For the longest-processing-time rule, we obtain the exact worst-case ratio when all processing times are at least the server-operation duration, and derive new parameter-dependent lower and upper bounds for unrestricted instances. The results show that both processing-time granularity and blocking generated by short jobs shape the approximation behaviour of the common-server problem.

0.08

Diverse Schedules for Makespan Minimization on Unrelated Machines

cs.DS ·2026-10-20 ·Sebastian Bruchhold, Matthias Mnich, Karolina Tammemaa, Morten Weber, Michalis Xefteris +1 more
similarity 0.67
Abstract · Updated funding acknowledgment, scientific content unchanged

We study makespan minimization on unrelated machines with the additional goal of constructing diverse schedules: Instead of outputting a single schedule, we seek a collection of schedules with provable makespan guarantees and substantially different job assignments. Committing to a single schedule in advance may be undesirable. Processing times may be uncertain, and constraints or domain knowledge may emerge later, so $k$ schedules of similar quality offer meaningful alternatives. We measure pairwise diversity by the weighted Hamming distance between job assignments and study the two standard objectives in the diverse-solutions literature: max-sum diversity, which maximizes the total pairwise distance between schedules, and max-min diversity, which maximizes the smallest pairwise distance. For the max-sum objective, we show that optimal diversity can be achieved in polynomial time without sacrificing the classic makespan approximation factor. For every feasible makespan target $T$, we can compute $k$ schedules of makespan at most $2T$ whose max-sum diversity is optimal among all $k$ schedules of makespan at most $T$. Therefore, we match the classic factor-$2$ makespan guarantee of Lenstra, Shmoys, and Tardos (Math. Prog., 1990) and preserve optimal diversity. For the max-min objective, we show that the diversity problem is inherently harder. Namely, we show that, even without makespan constraints, deciding whether three schedules of given pairwise diversity exist is NP-hard. We complete this with two complementary bicriteria approximation algorithms for every fixed $k$ and $\varepsilon \in (0,1)$. The first preserves almost all of the optimal max-min diversity with makespan at most $(3\lceil12/\varepsilon\rceil+1)T$. The second keeps the makespan arbitrarily close to the classic $2$ guarantee while achieving a $\frac{1}{2}(1-\varepsilon)$ fraction of the optimal max-min diversity.

0.20

What to Predict for Efficient Scheduling on Parallel Machines

cs.DS ·2026-11-10 ·Evripidis Bampis, Bruno Escoffier, Dimitris Fotakis, Giorgos Mitropoulos, Michalis Xefteris
top venue similarity 0.66
Abstract · Accepted at NeurIPS 2026

We study learning-augmented algorithms for scheduling on multiple parallel machines under the objectives of minimizing the makespan or the total weighted completion time. We assume that the algorithm has access to noisy information (the prediction) about an optimal solution, expressed through a solution encoding that implicitly quantifies both the amount of information provided and the nature of noise (errors in the prediction). Our central question is to determine the maximum level of noise that still allows for efficiently recovering this optimal solution. We observe that information guiding greedy scheduling to optimality or revealing the optimal assignment of tasks to machines is very sensitive to noise, and prove that recovering an optimal solution from solution encodings capturing either is computationally hard, even for a small (non-constant) number of errors. On the positive side, we show that an order-based encoding, which leads to errors that are dispersed locally, is robust to noise. We present a dynamic programming framework that utilizes this encoding and solves optimally several classical scheduling problems, including makespan and total weighted completion time minimization on identical or unrelated machines.

0.36

The Exact Robustness of Smith's Rule with Predicted Processing Times

cs.DS ·2026-10-23 ·Ohad Ayalon, Ilan Reuven Cohen
similarity 0.66
Abstract · 39 pages, 3 figures. Includes full proofs and exact-arithmetic ancillary scripts

Smith's rule orders jobs by their weight-to-processing-time ratios. We study the robustness of its list schedule on identical parallel machines when job $j$ is ordered using a nominal processing time $μ_j$ and its true processing time satisfies $μ_j\leq p_j\leqαμ_j$, where $α\geq1$. We determine the exact worst-case approximation ratio against the clairvoyant optimum, taking the supremum over machine counts. The ratio is an explicit continuous piecewise-algebraic function of $α$. It equals the Kawaguchi--Kyan constant $(1+\sqrt{2})/2$ at $α=1$ and is exactly $\sqrtα$ for $α\geq4$. On one machine the exact ratio is $\sqrtα$. For every fixed machine count, no deterministic nonpreemptive algorithm can improve on this guarantee, even with knowledge of $α$. The proof reduces to a common nominal Smith ratio and endpoint errors. Cutting the list schedule at its minimum final machine load yields a prefix--suffix certificate; two packings of matching lower-bound instances explain the branches below $α=4$. We also prove a nominal-to-robust transfer: any fixed schedule ordered by nominal Smith ratios on each machine, with nominal approximation ratio $1+δ$, has realized ratio at most $\sqrtα+αδ$. A nominal approximation scheme then gives, for every fixed $\varepsilon>0$, a deterministic polynomial-time algorithm independent of $α$ with ratio $(1+\varepsilon)\sqrtα$ simultaneously for $1\leqα\leq4$.

0.32

A QPTAS for Stochastic Scheduling of Bernoulli Jobs

cs.DS cs.CCmath.OC ·2026-10-08 ·Junho Hwang
benchmark similarity 0.65
Abstract · 23 pages, 1 figure

We study the classical problem of scheduling jobs with random processing times on $m$ identical machines to minimize the expected sum of completion times, for Bernoulli jobs: job $j$ takes time $p_j$ with probability $q_j$ and time $0$ otherwise, and its outcome is revealed when it starts. The benchmark is an optimal adaptive policy. We give a quasi-polynomial-time approximation scheme for every number of machines. Previously, quasi-polynomial time was known to give an $O(\log N)$-approximation, and approximation schemes were known only for a constant number of distinct sizes. The scheme rests on a simple observation: it suffices to round the times at which machines become free, rather than the times at which jobs start, to a grid whose width is proportional to the job size, and an optimal policy stretched by a factor close to one already respects such grids. We also show that every policy that fixes the order of the jobs in advance loses a factor $Ω(\log N)$, already on two machines, so a constant factor requires adapting the order to the observed outcomes. Further results include a polynomial-time adaptive rule with ratio $\min\{m,1+\sum_j q_j\}$, a simpler approximation scheme for a constant number of sizes, and #P-hardness of computing the optimal expected cost on two machines.

0.25

Scheduling to Maximize Weighted Throughput with an Active-Time Budget

cs.DS ·2026-08-29 ·Susanne Albers, G. Wessel van der Heijden
publishedtheory similarity 0.65
Abstract · 16 pages, 5 figures, To appear at WAOA 2026

We study the active-time scheduling problem with weighted throughput maximization. In this setting, a set of $n$ jobs $J$ arrive at integer release times, each with an integer processing time and integer deadline. Jobs may be preempted at integer time slot boundaries. A schedule assigns jobs to time slots, with at most $m$ jobs assigned to the same time slot. A slot is called \emph{active} if at least one job is scheduled in it. Instead of scheduling all jobs to minimize the number of active time slots, we consider the more general variant of \emph{weighted throughput} with an active-time budget $K$, where each job $j\in J$ has a weight $w_j$. The objective is to maximize the total weight of \emph{completed} jobs using at most $K$ active time slots. This means that partially scheduled jobs do not count towards the objective. The classical active-time minimization problem is recovered by asking whether all jobs can be completed within a given active-time budget. We give hardness, approximation, and exact algorithmic results. For general intervals with unbounded parallelism, we prove NP-hardness, rule out an FPTAS unless $\mathrm{P}=\mathrm{NP}$, and give a pseudo-polynomial time $Ω(1/\log K)$-approximation. For proper intervals, we prove a canonical structural lemma and obtain an exact $(nK)^{O(m)}$-time algorithm. For laminar intervals, we give an exact $f(K,m)\cdot n^{O(1)}$-time algorithm.

0.25

Single-Machine Scheduling with Interval Predictions and Costly Preemption

cs.DS ·2026-09-14 ·Lachlan Bridges
theory similarity 0.65
Abstract · 8 pages

We study the single-machine total-completion-time problem $1||\sum C_j$ when processing times are unknown but each job comes with a reported interval. Jobs are initially processed in nondecreasing order of reported upper bound. If a job is still unfinished after receiving that much service, the reported upper bound has been violated and the policy switches to a resumable geometric fallback. Each interruption of an unfinished job incurs an additive penalty $κ$. For a residual set of $m$ jobs, known size ratio $D=s_1/s_0$, normalized interruption penalty $λ=κ/s_0$, and geometric depth $K$, we derive an explicit worst-case coefficient $Ψ_{m,D,λ}(K)$. When $λ>0$, a finite minimizing depth exists and can be chosen after the trigger from the observed number of unfinished jobs; the optimal depth decreases with the interruption penalty and increases with the residual set size. We also derive the exact worst-case coefficient $R_{n,D}$ for an arbitrary nonpreemptive list when all processing times lie in a known bounded range. These bounds give guarantees for valid intervals, a single interval failure, arbitrary reports, no-trigger outcomes, and random instances. In the single-failure regime, they also give a precise condition under which the proved fallback guarantee is smaller than the bounded-range continuation guarantee.

0.16