Diverse Schedules for Makespan Minimization on Unrelated Machines

Sebastian Bruchhold, Matthias Mnich, Karolina Tammemaa, Morten Weber, Michalis Xefteris, Bart Zondervan

cs.DS ·submitted 2026-10-20 16:53 UTC · v2

Abstract

We study makespan minimization on unrelated machines with the additional goal of constructing diverse schedules: Instead of outputting a single schedule, we seek a collection of schedules with provable makespan guarantees and substantially different job assignments. Committing to a single schedule in advance may be undesirable. Processing times may be uncertain, and constraints or domain knowledge may emerge later, so $k$ schedules of similar quality offer meaningful alternatives. We measure pairwise diversity by the weighted Hamming distance between job assignments and study the two standard objectives in the diverse-solutions literature: max-sum diversity, which maximizes the total pairwise distance between schedules, and max-min diversity, which maximizes the smallest pairwise distance. For the max-sum objective, we show that optimal diversity can be achieved in polynomial time without sacrificing the classic makespan approximation factor. For every feasible makespan target $T$, we can compute $k$ schedules of makespan at most $2T$ whose max-sum diversity is optimal among all $k$ schedules of makespan at most $T$. Therefore, we match the classic factor-$2$ makespan guarantee of Lenstra, Shmoys, and Tardos (Math. Prog., 1990) and preserve optimal diversity. For the max-min objective, we show that the diversity problem is inherently harder. Namely, we show that, even without makespan constraints, deciding whether three schedules of given pairwise diversity exist is NP-hard. We complete this with two complementary bicriteria approximation algorithms for every fixed $k$ and $\varepsilon \in (0,1)$. The first preserves almost all of the optimal max-min diversity with makespan at most $(3\lceil12/\varepsilon\rceil+1)T$. The second keeps the makespan arbitrarily close to the classic $2$ guarantee while achieving a $\frac{1}{2}(1-\varepsilon)$ fraction of the optimal max-min diversity.

Comment
Updated funding acknowledgment, scientific content unchanged

Closest papers

Nearest neighbours by meaning across the whole index.

On Diverse Solutions to Max-k-CSP and Bounded Degree k-SAT

cs.DS ·2026-09-27 ·Mayank Goswami, Adarsh Srinivasan
similarity 0.69
Abstract

We study the problem of generating diverse solutions to Max-$k$-CSP and bounded-degree $k$-SAT, focusing on two distinct metrics: constraint diversity and variable diversity. For constraint diversity, the goal is to output $s \geq 2$ assignments to the CSP such that each assignment satisfies a $c$-fraction of the constraints, while maximizing the diversity among the $0$-$1$ indicator vectors of satisfied constraints in the Hamming metric. By reducing this to a multi-criteria optimization problem, we design $poly(n,s)$ time approximation algorithms that return s assignments achieving provable bi-criteria guarantees on both the fraction of satisfied constraints and diversity of the constraint vectors. For variable diversity, the objective is to maximize the Hamming distance between the assignments, while also maximizing the number of constraints satisfied. For Max-$k$-CSP instances when the desired number of solutions is $s=2^{O(n)}$, we implicitly represent these diverse approximate solutions by constructing linear codes within the solution space. Finally, we investigate variable diversity for $k$-SAT in the Lovász Local Lemma regime. In this setting, we establish NP-hardness for the exact diversity problem (computing the diameter of the solution space) and provide a polynomial-time approximation algorithm to efficiently generate diverse satisfying assignments.

0.35

Speed-Robust Scheduling for Total Completion Time

cs.DS cs.DM ·2026-11-16 ·Moritz Buchem, Nicole Megow, Morten Weber
similarity 0.67
Abstract

We study two-stage speed-robust scheduling for minimizing total completion time. Jobs must be partitioned into $M$ bags before an adversary reveals the speeds of at most $M$ machines. Each bag is then assigned to one available machine, and the jobs on each machine may be processed in any order independent of the bags. We compare with an optimal schedule that knows the speeds in advance and assigns jobs individually. This model has been studied for makespan minimization. We initiate its study for total completion time, as suggested by Stein and Zhong (TALG 2020). For an unknown number of identical machines, we show that the optimal deterministic robustness factor is exactly~$13/12$, both for unit-size jobs and for arbitrary processing times. For infinitesimally small jobs, the factor lies between $31/30\approx1.0333$ and $28/27\approx1.0370$, well below the optimal makespan factor of about $1.2071$. General speeds make the problem strictly harder: no deterministic algorithm is better than $1.2669$-robust, already for infinitesimally small jobs. We give a $25/16$-robust algorithm for arbitrary processing times and improve the guarantee to $1681/1152\approx1.4592$ for infinitesimally small jobs. Our main tools are a layer decomposition that extends guarantees from unit-size jobs to arbitrary processing times when one assignment satisfies them for every prefix in non-increasing processing-time order, and a threshold analysis of the bag counts produced by greedy assignment rules.

0.17

Approximation algorithms for identical parallel machine scheduling with assignment costs

cs.DS ·2026-10-24 ·Wei Li
similarity 0.66
Abstract

We study non-preemptive scheduling on identical parallel machines in which assigning job $j$ to machine $M_i$ incurs the cost $c_{ij}=a_iw_j+b_j$. The processing times $p_j$ and the cost weights $w_j$ are independent, and the number of machines is part of the input. For every fixed $\varepsilon\in(0,1]$ and every deadline $T$ for which a schedule with makespan at most $T$ exists, we give a polynomial-time algorithm that computes a schedule with makespan at most $(1+\varepsilon)T$ whose total assignment cost does not exceed the minimum under the deadline $T$. Using this algorithm as a subroutine, we obtain a polynomial-time approximation scheme for minimizing the makespan under a total cost budget whose schedules always satisfy the budget; this answers an open question for costs $c_{ij}=l_ic_j$ with $c_j$ independent of $p_j$. For the lexicographic problem, in which the total assignment cost is minimized among all schedules of minimum makespan, we obtain in polynomial time a schedule with makespan at most $1+\varepsilon$ times the minimum and total assignment cost at most that of a lexicographically optimal schedule; this improves the makespan guarantees of earlier algorithms for additive and multiplicative costs. For costs $c_{ij}=s_i+a_iw_j$, where $s_i$ is charged for each job processed on $M_i$, the same guarantees are obtained in quasi-polynomial time.

0.24

Minimizing the makespan in job shop scheduling under conflict graph constraints

cs.DM math.OC ·2026-09-03 ·Nour Elhouda Tellache, Abdenour Azerine
similarity 0.62
Abstract

We study the job shop scheduling problem with a conflict graph, in which adjacent jobs cannot be processed simultaneously on different machines, with the objective of minimizing the makespan. We establish a polynomial equivalence with a resource-constrained job shop problem having unit-capacity resources and binary resource requirements The problem is strongly NP-hard even on two machines with unit-time operations. For this setting, we derive an optimal-makespan formula and a linear-time algorithm when the conflict graph is a cluster graph, given the clique partition. We also develop a polynomial-time $4/3$-approximation algorithm for arbitrary conflict graphs on two machines when each job has exactly two unit-time operations. For the general problem, we propose four mixed-integer linear formulations, lower bounds, and a genetic algorithm with active, non-delay, and hybrid decoding procedures. Computational experiments on instances derived from the Lawrence and Taillard benchmarks and on randomly generated generalized job shop instances evaluate the proposed methods and show that the genetic algorithm generally improves on constructive heuristics.

0.34

Scheduling with Mandatory Breaks: NP-Hardness and an Additive-One Approximation

cs.DS ·2026-09-28 ·Shreyas Ghildiyal, Muralidhara V N
similarity 0.62
Abstract

In classical fixed-interval scheduling, each job of a given set must be processed during a prescribed time interval. The goal is to assign each job to exactly one machine such that no two jobs assigned to the same machine overlap in their interiors, and the number of machines used is minimized. Without further constraints this is interval graph coloring and is solvable in polynomial time through greedy approaches. We study a variant in which every used machine must remain idle during a contiguous \emph{break} of prescribed length $x$ somewhere in the scheduling horizon. We show that this additional constraint makes the problem hard, except when $x\le1$. First, for every fixed $x\ge2$, deciding whether $k$ machines suffice for the assignment of a given set of jobs is NP-complete, even when all coordinates are bounded linearly in the number of jobs, so machine minimization is strongly NP-hard. Second, for $x=1$, we give a polynomial-time algorithm that solves the problem exactly. Finally, we give a deterministic polynomial-time algorithm that, on every feasible instance, outputs a schedule using at most $\OPT+1$ machines, where $\OPT$ is the true minimum. Unless $\mathrm{P}=\mathrm{NP}$, no polynomial-time algorithm guarantees $\OPT$ machines for any fixed $x\ge2$, so the additive guarantee of one is best possible.

0.07

Coordinating Boundaries: Improved Approximation Algorithms for Unweighted Non-Preemptive Throughput Maximization

cs.DS ·2026-10-26 ·Weitian Tong, Yao Xu
similarity 0.62
Abstract · 34 pages, 8 figures

We study unweighted nonpreemptive throughput maximization: given jobs with processing times, release times, and deadlines, schedule a maximum-cardinality subset on identical machines. For every fixed $\varepsilon>0$, we give randomized algorithms with expected approximation ratios $17/13+\varepsilon$ in polynomial time and $21/17+\varepsilon$ in pseudopolynomial time. These improve the respective $4/3+\varepsilon$ and $5/4+\varepsilon$ guarantees of Armbruster, Grandoni, Tinguely, and Wiese [STOC'26]. Both results hold for an arbitrary number of identical machines. Our algorithms build on their configuration-LP and matching framework, which partitions time into blocks. For a job whose window meets multiple blocks, its boundary blocks are the first and last such blocks. Crossing boundary pairs, whose endpoints strictly interleave, permit additional assignments to sampled execution slots, while a noncrossing family can be coordinated using consistent joint distributions on at most three blocks. The exchange analysis accounts for fractional job assignments that must be erased before inserting an additional job. For the pseudopolynomial implementation, we project configurations onto selected job identities and use separate configuration distributions with common placement marginals. This retains efficient pricing while enforcing the correlations needed for coordination.

0.15

Universally truthful mechanisms for scheduling

cs.GT ·2026-09-11 ·Georgios Anastasiadis, George Christodoulou, Elias Koutsoupias, Annamaria Kovacs, Conrad Schecker
theory similarity 0.62
Abstract

We consider universally truthful randomized mechanisms for the problem of scheduling $m$ jobs on $n$ unrelated machines. We prove a lower bound on the expected approximation ratio of every such mechanism whose probability distribution has discrete support. We show that no universally truthful randomized mechanism in this class can achieve approximation ratio smaller than $n/12 - o(n)$ with respect to the optimal makespan. We match this, up to a constant factor, by a mechanism with approximation ratio $n/2 + o(n)$.

0.49

Sharp Bounds for Truthful-in-Expectation Scheduling

cs.GT ·2026-11-03 ·Yunpeng Li
theory similarity 0.61
Abstract

We study randomized mechanisms for scheduling indivisible jobs on $n$ unrelated machines. Each machine is controlled by a selfish agent who privately knows its processing time for each job. A mechanism assigns every job to a machine and makes payments. We require truthfulness in expectation: no agent can increase its expected payment minus its expected processing cost by misreporting, regardless of the other agents' reports. The makespan is the maximum total processing time assigned to a machine; the objective is to minimize its expectation. We prove that the optimal approximation ratio is $(n+1)/2$ for every $n\ge7$, relative to the minimum makespan of an integral assignment. The lower bound holds for every $n$ and allows unrestricted computation and arbitrary correlations among assignments, assuming finite expected payments and a guarantee uniform over all finite job counts. The matching mechanism uses correlated rounding and runs in expected polynomial bit time on rational inputs. These guarantees hold for all finite nonnegative processing times. For two machines, we characterize the optimal approximation ratio exactly as an analytic constant, approximately $1.505995705434$, and give a mechanism attaining it. For three machines the optimal ratio is $2$. For four, five, and six machines we obtain upper bounds of $3$, $105/32$, and $29/8$, respectively, compared with the general lower bound $(n+1)/2$. The proofs for $n\ge7$ do not rely on computer-assisted certificates; the two- and three-machine results use exact rational computer-assisted certificates.

0.18