We study the single-machine total-completion-time problem $1||\sum C_j$ when processing times are unknown but each job comes with a reported interval. Jobs are initially processed in nondecreasing order of reported upper bound. If a job is still unfinished after receiving that much service, the reported upper bound has been violated and the policy switches to a resumable geometric fallback. Each interruption of an unfinished job incurs an additive penalty $κ$. For a residual set of $m$ jobs, known size ratio $D=s_1/s_0$, normalized interruption penalty $λ=κ/s_0$, and geometric depth $K$, we derive an explicit worst-case coefficient $Ψ_{m,D,λ}(K)$. When $λ>0$, a finite minimizing depth exists and can be chosen after the trigger from the observed number of unfinished jobs; the optimal depth decreases with the interruption penalty and increases with the residual set size. We also derive the exact worst-case coefficient $R_{n,D}$ for an arbitrary nonpreemptive list when all processing times lie in a known bounded range. These bounds give guarantees for valid intervals, a single interval failure, arbitrary reports, no-trigger outcomes, and random instances. In the single-failure regime, they also give a precise condition under which the proved fallback guarantee is smaller than the bounded-range continuation guarantee.

Comment
8 pages

Closest papers

Nearest neighbours by meaning across the whole index.

Speed-Robust Scheduling for Total Completion Time

cs.DS cs.DM ·2026-11-16 ·Moritz Buchem, Nicole Megow, Morten Weber
similarity 0.65
Abstract

We study two-stage speed-robust scheduling for minimizing total completion time. Jobs must be partitioned into $M$ bags before an adversary reveals the speeds of at most $M$ machines. Each bag is then assigned to one available machine, and the jobs on each machine may be processed in any order independent of the bags. We compare with an optimal schedule that knows the speeds in advance and assigns jobs individually. This model has been studied for makespan minimization. We initiate its study for total completion time, as suggested by Stein and Zhong (TALG 2020). For an unknown number of identical machines, we show that the optimal deterministic robustness factor is exactly~$13/12$, both for unit-size jobs and for arbitrary processing times. For infinitesimally small jobs, the factor lies between $31/30\approx1.0333$ and $28/27\approx1.0370$, well below the optimal makespan factor of about $1.2071$. General speeds make the problem strictly harder: no deterministic algorithm is better than $1.2669$-robust, already for infinitesimally small jobs. We give a $25/16$-robust algorithm for arbitrary processing times and improve the guarantee to $1681/1152\approx1.4592$ for infinitesimally small jobs. Our main tools are a layer decomposition that extends guarantees from unit-size jobs to arbitrary processing times when one assignment satisfies them for every prefix in non-increasing processing-time order, and a threshold analysis of the bag counts produced by greedy assignment rules.

0.31

Learning While Scheduling Jobs under Context-Dependent Service Rates: An Anytime Rate-Optimal Algorithm

cs.LG ·2026-10-05 ·Seoungbin Bae, Dabeen Lee
theory similarity 0.65
Abstract

We study contextual queueing bandits, where a learner schedules jobs while learning unknown service rates modeled by logistic functions of job-server features. Performance is measured by queue length regret, the expected excess queue length at round $t$ relative to an oracle that knows the service rates. Existing decaying-regret guarantees either have a suboptimal decay rate or require a known fixed horizon. They also assume context-wise slack and a strictly positive minimum eigenvalue of the feature covariance. In this paper, we propose WISE (Widest Interval Selection with Elimination), achieving rate-optimal $\widetilde{\mathcal O}(t^{-1/2})$ queue length regret at every sufficiently large time without knowing the horizon. We assume capacity slack, meaning that expected incoming workload under best-server service is below service capacity, and impose no covariance lower bound. Our analysis uses a workload potential measuring the expected service attempts needed by waiting jobs on their best servers. Its drift on nonempty rounds combines a negative term ensured by capacity slack with errors from suboptimal service choices. Then an elliptical potential count bounds how often WISE selects wide confidence intervals, thereby limiting the number of rounds with large service errors. We also sharpen the arrival-rate dependence of an existing lower bound and make its dependence on feature dimension and server count explicit. We prove another lower bound that quantifies the increase in regret as the normalized capacity slack decreases; to our knowledge, this is the first such lower bound for CQB. Simulations show small regret even when context-wise slack fails.

0.20

Scheduling with Mandatory Breaks: NP-Hardness and an Additive-One Approximation

cs.DS ·2026-09-28 ·Shreyas Ghildiyal, Muralidhara V N
similarity 0.65
Abstract

In classical fixed-interval scheduling, each job of a given set must be processed during a prescribed time interval. The goal is to assign each job to exactly one machine such that no two jobs assigned to the same machine overlap in their interiors, and the number of machines used is minimized. Without further constraints this is interval graph coloring and is solvable in polynomial time through greedy approaches. We study a variant in which every used machine must remain idle during a contiguous \emph{break} of prescribed length $x$ somewhere in the scheduling horizon. We show that this additional constraint makes the problem hard, except when $x\le1$. First, for every fixed $x\ge2$, deciding whether $k$ machines suffice for the assignment of a given set of jobs is NP-complete, even when all coordinates are bounded linearly in the number of jobs, so machine minimization is strongly NP-hard. Second, for $x=1$, we give a polynomial-time algorithm that solves the problem exactly. Finally, we give a deterministic polynomial-time algorithm that, on every feasible instance, outputs a schedule using at most $\OPT+1$ machines, where $\OPT$ is the true minimum. Unless $\mathrm{P}=\mathrm{NP}$, no polynomial-time algorithm guarantees $\OPT$ machines for any fixed $x\ge2$, so the additive guarantee of one is best possible.

0.07

Asymmetric Weighted Earliness-Tardiness: Scheduling with a Nonrestrictive Common Due Date

cs.CC math.OCcs.DMmath.CO ·2026-09-12 ·Nicholas G. Hall, Hans Kellerer, Miao Song
similarity 0.65
Abstract · 268 pages, 12 figures, 29 tables

Single-machine asymmetric weighted earliness--tardiness (AWET) scheduling asks how to sequence jobs around a common synchronization date when early and late completion incur unrelated job-dependent penalties. At the boundary nonrestrictive date $d=\sum_jp_j$, a compact V-shaped schedule reduces the continuous-time problem to a quadratic choice of a nonempty early set. We establish four complementary results for this model. First, the positive-integer problem is strongly NP-complete by a unary-polynomial reduction from Restricted Exact Cover by 3-Sets. Second, unrestricted AWET admits a polynomial-time $(3+2\sqrt2+\varepsilon)$-approximation based on an anchored semidefinite relaxation and deterministic marginal thresholding. Third, when the earliness and tardiness ratio orders are strict reversals, the problem is weakly NP-complete but has an exact two-resource pseudopolynomial dynamic program. Fourth, for fixed total refinements whose ratio permutation is separable, an exact separating-tree recurrence and coordinated geometric trimming yield an FPTAS. The proofs use different manifestations of the same canonical objective: scale-separated prefix penalties, positive-semidefinite minimum-kernel covariance, a dominant completed load square, and a bounded four-coordinate decomposition interface. Together, the results show that the decisive issue is not merely whether the two ratio orders agree, but whether their interaction can be controlled by a global certificate or compressed into a bounded constructive interface.

0.21

Below Three: A 2.8027-Approximation for Moldable Precedence Scheduling

cs.DS ·2026-11-19 ·Klaus Jansen, Felix Ohnesorge
similarity 0.64
Abstract

We study makespan minimisation for nonpreemptive moldable jobs with arbitrary precedence constraints on identical processors. Each job runs on a chosen number of processors that remains fixed throughout its execution. Allocating more processors to a job can shorten its execution, but may increase total work and delay other jobs. We assume nonincreasing processing times, nondecreasing work, and a convex duration--work relation after dominated allocations are removed. This model includes jobs with concave speedup, for which Jansen and Zhang obtained a $3.291919\ldots$-approximation. Independently and concurrently with our work, Chen obtained a $3.016208\ldots$-approximation for the full convex model and a $2.973912\ldots$-approximation for concave speedup. We give a deterministic polynomial-time $2.8027$-approximation for the full convex model and every number of processors. Our result breaks the factor-three barrier for this model and also improves the approximation guarantee for concave speedup.

0.34

Fair Division Meets Scheduling: Approximately Envy-Free Interval Scheduling

cs.DS cs.GT ·2026-08-15 ·Sander Borst, Golnoosh Shahkarami, Rohit Vaish
benchmarktheory similarity 0.63
Abstract

We study interval scheduling from the perspective of fair allocation. There are $m$ identical machines and a set of intervals, each specified by a start time, an end time, and a nonnegative weight. A schedule assigns a subset of the intervals to the machines so that no two intervals on the same machine overlap, and the goal is to maximize the total weight of scheduled intervals. Viewing machines as agents and intervals as goods, we require the schedule to be envy-free up to one item (EF1), and we measure efficiency against the offline optimum without fairness. In the offline setting, we give an algorithm that computes an EF1 schedule whose loss is at most a factor of $3/2$ in the unweighted regime, and we prove lower bounds of $\frac{3m-2}{2m-1}$, approaching $3/2$, in both the unweighted and the unit-length weighted regimes, so the price of fairness is $3/2$ in the limit. In the online setting, intervals arrive in nondecreasing order of start times; an arriving interval must be accepted or rejected, rejections are irrevocable, and an accepted interval may be revoked, and lost, at any time before it ends. For the unweighted regime we present Greedy-Balanced, a simple algorithm that maintains EF1 at every point in time and is $(2-\tfrac{1}{m})$-competitive against the offline optimum without fairness, and we prove a matching lower bound for every deterministic algorithm; the optimal deterministic fair competitive ratio is thus exactly $2-\tfrac{1}{m}$. Experiments on real-world benchmark instances show that Greedy-Balanced performs well beyond its worst-case guarantee, with an observed ratio never exceeding $1.306$.

0.38

A QPTAS for Stochastic Scheduling of Bernoulli Jobs

cs.DS cs.CCmath.OC ·2026-10-08 ·Junho Hwang
benchmark similarity 0.62
Abstract · 23 pages, 1 figure

We study the classical problem of scheduling jobs with random processing times on $m$ identical machines to minimize the expected sum of completion times, for Bernoulli jobs: job $j$ takes time $p_j$ with probability $q_j$ and time $0$ otherwise, and its outcome is revealed when it starts. The benchmark is an optimal adaptive policy. We give a quasi-polynomial-time approximation scheme for every number of machines. Previously, quasi-polynomial time was known to give an $O(\log N)$-approximation, and approximation schemes were known only for a constant number of distinct sizes. The scheme rests on a simple observation: it suffices to round the times at which machines become free, rather than the times at which jobs start, to a grid whose width is proportional to the job size, and an optimal policy stretched by a factor close to one already respects such grids. We also show that every policy that fixes the order of the jobs in advance loses a factor $Ω(\log N)$, already on two machines, so a constant factor requires adapting the order to the observed outcomes. Further results include a polynomial-time adaptive rule with ratio $\min\{m,1+\sum_j q_j\}$, a simpler approximation scheme for a constant number of sizes, and #P-hardness of computing the optimal expected cost on two machines.

0.25

Scheduling to Maximize Weighted Throughput with an Active-Time Budget

cs.DS ·2026-08-29 ·Susanne Albers, G. Wessel van der Heijden
publishedtheory similarity 0.61
Abstract · 16 pages, 5 figures, To appear at WAOA 2026

We study the active-time scheduling problem with weighted throughput maximization. In this setting, a set of $n$ jobs $J$ arrive at integer release times, each with an integer processing time and integer deadline. Jobs may be preempted at integer time slot boundaries. A schedule assigns jobs to time slots, with at most $m$ jobs assigned to the same time slot. A slot is called \emph{active} if at least one job is scheduled in it. Instead of scheduling all jobs to minimize the number of active time slots, we consider the more general variant of \emph{weighted throughput} with an active-time budget $K$, where each job $j\in J$ has a weight $w_j$. The objective is to maximize the total weight of \emph{completed} jobs using at most $K$ active time slots. This means that partially scheduled jobs do not count towards the objective. The classical active-time minimization problem is recovered by asking whether all jobs can be completed within a given active-time budget. We give hardness, approximation, and exact algorithmic results. For general intervals with unbounded parallelism, we prove NP-hardness, rule out an FPTAS unless $\mathrm{P}=\mathrm{NP}$, and give a pseudo-polynomial time $Ω(1/\log K)$-approximation. For proper intervals, we prove a canonical structural lemma and obtain an exact $(nK)^{O(m)}$-time algorithm. For laminar intervals, we give an exact $f(K,m)\cdot n^{O(1)}$-time algorithm.