A QPTAS for Stochastic Scheduling of Bernoulli Jobs

Junho Hwang

cs.DS cs.CCmath.OC ·submitted 2026-10-08 08:25 UTC · v1
benchmark

Abstract

We study the classical problem of scheduling jobs with random processing times on $m$ identical machines to minimize the expected sum of completion times, for Bernoulli jobs: job $j$ takes time $p_j$ with probability $q_j$ and time $0$ otherwise, and its outcome is revealed when it starts. The benchmark is an optimal adaptive policy. We give a quasi-polynomial-time approximation scheme for every number of machines. Previously, quasi-polynomial time was known to give an $O(\log N)$-approximation, and approximation schemes were known only for a constant number of distinct sizes. The scheme rests on a simple observation: it suffices to round the times at which machines become free, rather than the times at which jobs start, to a grid whose width is proportional to the job size, and an optimal policy stretched by a factor close to one already respects such grids. We also show that every policy that fixes the order of the jobs in advance loses a factor $Ω(\log N)$, already on two machines, so a constant factor requires adapting the order to the observed outcomes. Further results include a polynomial-time adaptive rule with ratio $\min\{m,1+\sum_j q_j\}$, a simpler approximation scheme for a constant number of sizes, and #P-hardness of computing the optimal expected cost on two machines.

Comment
23 pages, 1 figure

Closest papers

Nearest neighbours by meaning across the whole index.

Coordinating Boundaries: Improved Approximation Algorithms for Unweighted Non-Preemptive Throughput Maximization

cs.DS ·2026-10-26 ·Weitian Tong, Yao Xu
similarity 0.69
Abstract · 34 pages, 8 figures

We study unweighted nonpreemptive throughput maximization: given jobs with processing times, release times, and deadlines, schedule a maximum-cardinality subset on identical machines. For every fixed $\varepsilon>0$, we give randomized algorithms with expected approximation ratios $17/13+\varepsilon$ in polynomial time and $21/17+\varepsilon$ in pseudopolynomial time. These improve the respective $4/3+\varepsilon$ and $5/4+\varepsilon$ guarantees of Armbruster, Grandoni, Tinguely, and Wiese [STOC'26]. Both results hold for an arbitrary number of identical machines. Our algorithms build on their configuration-LP and matching framework, which partitions time into blocks. For a job whose window meets multiple blocks, its boundary blocks are the first and last such blocks. Crossing boundary pairs, whose endpoints strictly interleave, permit additional assignments to sampled execution slots, while a noncrossing family can be coordinated using consistent joint distributions on at most three blocks. The exchange analysis accounts for fractional job assignments that must be erased before inserting an additional job. For the pseudopolynomial implementation, we project configurations onto selected job identities and use separate configuration distributions with common placement marginals. This retains efficient pricing while enforcing the correlations needed for coordination.

0.15

Sharp Bounds for Truthful-in-Expectation Scheduling

cs.GT ·2026-11-03 ·Yunpeng Li
theory similarity 0.68
Abstract

We study randomized mechanisms for scheduling indivisible jobs on $n$ unrelated machines. Each machine is controlled by a selfish agent who privately knows its processing time for each job. A mechanism assigns every job to a machine and makes payments. We require truthfulness in expectation: no agent can increase its expected payment minus its expected processing cost by misreporting, regardless of the other agents' reports. The makespan is the maximum total processing time assigned to a machine; the objective is to minimize its expectation. We prove that the optimal approximation ratio is $(n+1)/2$ for every $n\ge7$, relative to the minimum makespan of an integral assignment. The lower bound holds for every $n$ and allows unrestricted computation and arbitrary correlations among assignments, assuming finite expected payments and a guarantee uniform over all finite job counts. The matching mechanism uses correlated rounding and runs in expected polynomial bit time on rational inputs. These guarantees hold for all finite nonnegative processing times. For two machines, we characterize the optimal approximation ratio exactly as an analytic constant, approximately $1.505995705434$, and give a mechanism attaining it. For three machines the optimal ratio is $2$. For four, five, and six machines we obtain upper bounds of $3$, $105/32$, and $29/8$, respectively, compared with the general lower bound $(n+1)/2$. The proofs for $n\ge7$ do not rely on computer-assisted certificates; the two- and three-machine results use exact rational computer-assisted certificates.

0.18

Approximation algorithms for identical parallel machine scheduling with assignment costs

cs.DS ·2026-10-24 ·Wei Li
similarity 0.68
Abstract

We study non-preemptive scheduling on identical parallel machines in which assigning job $j$ to machine $M_i$ incurs the cost $c_{ij}=a_iw_j+b_j$. The processing times $p_j$ and the cost weights $w_j$ are independent, and the number of machines is part of the input. For every fixed $\varepsilon\in(0,1]$ and every deadline $T$ for which a schedule with makespan at most $T$ exists, we give a polynomial-time algorithm that computes a schedule with makespan at most $(1+\varepsilon)T$ whose total assignment cost does not exceed the minimum under the deadline $T$. Using this algorithm as a subroutine, we obtain a polynomial-time approximation scheme for minimizing the makespan under a total cost budget whose schedules always satisfy the budget; this answers an open question for costs $c_{ij}=l_ic_j$ with $c_j$ independent of $p_j$. For the lexicographic problem, in which the total assignment cost is minimized among all schedules of minimum makespan, we obtain in polynomial time a schedule with makespan at most $1+\varepsilon$ times the minimum and total assignment cost at most that of a lexicographically optimal schedule; this improves the makespan guarantees of earlier algorithms for additive and multiplicative costs. For costs $c_{ij}=s_i+a_iw_j$, where $s_i$ is charged for each job processed on $M_i$, the same guarantees are obtained in quasi-polynomial time.

0.24

An EPTAS for Vector Scheduling with Time Intervals

cs.DS cs.CC ·2026-09-27 ·Junho Hwang
theory similarity 0.67
Abstract · 18 pages, 4 figures. v2: extended to several resources and unrelated machines, with a new title and simplified proofs

We study vector scheduling in which each job is active during a fixed time interval. A job uses several resources and stays on one machine for its entire interval; its resource requirements may depend on the machine. The objective is to minimize the largest resource load over all machines and times. For $r$ machines and $d$ resources, we give a deterministic $(1+\varepsilon)$-approximation in $f(r,d,1/\varepsilon)N^{O(1)}$ time, where $N$ is the binary input length. This gives an efficient polynomial-time approximation scheme for fixed $r$ and $d$, extending approximation schemes for scalar temporary tasks assignment. The algorithm merges jobs into blocks whose time intervals are fixed before any machine is chosen, and assigns the blocks by dynamic programming over a balanced recursive split of the time line. We also prove strong NP-hardness and an exponential lower bound in $1/\varepsilon$ under the Exponential Time Hypothesis, already for two identical machines and one resource.

0.13

Universally truthful mechanisms for scheduling

cs.GT ·2026-09-11 ·Georgios Anastasiadis, George Christodoulou, Elias Koutsoupias, Annamaria Kovacs, Conrad Schecker
theory similarity 0.66
Abstract

We consider universally truthful randomized mechanisms for the problem of scheduling $m$ jobs on $n$ unrelated machines. We prove a lower bound on the expected approximation ratio of every such mechanism whose probability distribution has discrete support. We show that no universally truthful randomized mechanism in this class can achieve approximation ratio smaller than $n/12 - o(n)$ with respect to the optimal makespan. We match this, up to a constant factor, by a mechanism with approximation ratio $n/2 + o(n)$.

0.49

Speed-Robust Scheduling for Total Completion Time

cs.DS cs.DM ·2026-11-16 ·Moritz Buchem, Nicole Megow, Morten Weber
similarity 0.65
Abstract

We study two-stage speed-robust scheduling for minimizing total completion time. Jobs must be partitioned into $M$ bags before an adversary reveals the speeds of at most $M$ machines. Each bag is then assigned to one available machine, and the jobs on each machine may be processed in any order independent of the bags. We compare with an optimal schedule that knows the speeds in advance and assigns jobs individually. This model has been studied for makespan minimization. We initiate its study for total completion time, as suggested by Stein and Zhong (TALG 2020). For an unknown number of identical machines, we show that the optimal deterministic robustness factor is exactly~$13/12$, both for unit-size jobs and for arbitrary processing times. For infinitesimally small jobs, the factor lies between $31/30\approx1.0333$ and $28/27\approx1.0370$, well below the optimal makespan factor of about $1.2071$. General speeds make the problem strictly harder: no deterministic algorithm is better than $1.2669$-robust, already for infinitesimally small jobs. We give a $25/16$-robust algorithm for arbitrary processing times and improve the guarantee to $1681/1152\approx1.4592$ for infinitesimally small jobs. Our main tools are a layer decomposition that extends guarantees from unit-size jobs to arbitrary processing times when one assignment satisfies them for every prefix in non-increasing processing-time order, and a threshold analysis of the bag counts produced by greedy assignment rules.

0.18

Combinatorial Bernoulli Factories with Polynomially Many Coins

cs.DS cs.GTcs.LGmath.PR+1 ·2026-11-12 ·Renato Paes Leme, Rad Niazadeh
similarity 0.65
Abstract

We provide an efficient implementation of combinatorial Bernoulli factories. Such a factory turns coins of unknown biases $x$ into a random vertex of a polytope $P$ whose mean is exactly $x$. For every affine slice of the cube (the class of polytopes that admit a factory), we give a single algorithm whose expected number of coin flips and running time at every interior $x$ are polynomial in the dimension and in $1/{δ_*}$, where ${δ_*}=\min_i\{x_i,1-x_i\}$ is never supplied to the algorithm. For perfect matchings this gives $O(n^{8}{δ_*}^{-2}\log(n/{δ_*}))$ flips, while the factory of Niazadeh, Paes Leme, and Schneider [STOC 2021] spends at least $n^{2n-1}$ flips in expectation at the uniform doubly stochastic matrix. For other polytopes, our method rounds exactly given a point deep inside $P$ and the promise that $x$ is far from the boundary of $P$.

0.14

Scheduling with Mandatory Breaks: NP-Hardness and an Additive-One Approximation

cs.DS ·2026-09-28 ·Shreyas Ghildiyal, Muralidhara V N
similarity 0.64
Abstract

In classical fixed-interval scheduling, each job of a given set must be processed during a prescribed time interval. The goal is to assign each job to exactly one machine such that no two jobs assigned to the same machine overlap in their interiors, and the number of machines used is minimized. Without further constraints this is interval graph coloring and is solvable in polynomial time through greedy approaches. We study a variant in which every used machine must remain idle during a contiguous \emph{break} of prescribed length $x$ somewhere in the scheduling horizon. We show that this additional constraint makes the problem hard, except when $x\le1$. First, for every fixed $x\ge2$, deciding whether $k$ machines suffice for the assignment of a given set of jobs is NP-complete, even when all coordinates are bounded linearly in the number of jobs, so machine minimization is strongly NP-hard. Second, for $x=1$, we give a polynomial-time algorithm that solves the problem exactly. Finally, we give a deterministic polynomial-time algorithm that, on every feasible instance, outputs a schedule using at most $\OPT+1$ machines, where $\OPT$ is the true minimum. Unless $\mathrm{P}=\mathrm{NP}$, no polynomial-time algorithm guarantees $\OPT$ machines for any fixed $x\ge2$, so the additive guarantee of one is best possible.

0.07