The Exact Robustness of Smith's Rule with Predicted Processing Times

Ohad Ayalon, Ilan Reuven Cohen

cs.DS ·submitted 2026-10-23 05:49 UTC · v1

Abstract

Smith's rule orders jobs by their weight-to-processing-time ratios. We study the robustness of its list schedule on identical parallel machines when job $j$ is ordered using a nominal processing time $μ_j$ and its true processing time satisfies $μ_j\leq p_j\leqαμ_j$, where $α\geq1$. We determine the exact worst-case approximation ratio against the clairvoyant optimum, taking the supremum over machine counts. The ratio is an explicit continuous piecewise-algebraic function of $α$. It equals the Kawaguchi--Kyan constant $(1+\sqrt{2})/2$ at $α=1$ and is exactly $\sqrtα$ for $α\geq4$. On one machine the exact ratio is $\sqrtα$. For every fixed machine count, no deterministic nonpreemptive algorithm can improve on this guarantee, even with knowledge of $α$. The proof reduces to a common nominal Smith ratio and endpoint errors. Cutting the list schedule at its minimum final machine load yields a prefix--suffix certificate; two packings of matching lower-bound instances explain the branches below $α=4$. We also prove a nominal-to-robust transfer: any fixed schedule ordered by nominal Smith ratios on each machine, with nominal approximation ratio $1+δ$, has realized ratio at most $\sqrtα+αδ$. A nominal approximation scheme then gives, for every fixed $\varepsilon>0$, a deterministic polynomial-time algorithm independent of $α$ with ratio $(1+\varepsilon)\sqrtα$ simultaneously for $1\leqα\leq4$.

Comment
39 pages, 3 figures. Includes full proofs and exact-arithmetic ancillary scripts

Closest papers

Nearest neighbours by meaning across the whole index.

Near-Optimal Consistency-Robustness Bounds for Non-Clairvoyant Scheduling

cs.DS ·2026-10-21 ·Sizhe Li, Nicolas Christianson, Tongxin Li
theory similarity 0.68
Abstract

We study the problem of characterizing the optimal consistency--robustness tradeoff for single-machine non-clairvoyant scheduling with predicted processing times. For a fixed number of jobs $n$, Wei and Zhang (2020) established a lower bound on the achievable consistency--robustness tradeoff which is known to be tight only in a few restrictive cases, leaving the optimal tradeoff for general $n$ unresolved. A different worst-case-$n$ regime was introduced by Benomar et al. (2025), who applied the former work's construction to show that for $λ\in (0, 1)$, any $(1+λ)$-consistent algorithm must be $1 + Ω(\sqrt{1/λ})$-robust. On the other hand, the best known upper bound gives $(1+λ)$-consistency and $1+O(1/λ)$-robustness, leaving a polynomial gap. In this work, we develop a new lower bound using a multi-stage adversarial construction and a new algorithm that together give a near-optimal characterization of the consistency--robustness tradeoff: for every $n$, our upper bound is within a multiplicative factor $3/2$ of our lower bound, and thus our algorithm is within a multiplicative factor $3/2$ of the online optimal. In particular, our lower bound shows that any $(1+λ)$-consistent algorithm must have robustness at least $1/\sqrtλ$ as $n \to \infty$, while our algorithm achieves robustness at most $\frac{1}{2}+\sqrt{\frac{5}{4}+1/λ}$ for any $n$, matching the lower bound in the leading term as $λ\downarrow 0$; our upper bound also closes the polynomial gap in the worst-case-$n$ regime. We additionally show how our algorithm can be made error-tolerant, preserving the near-optimal consistency-robustness tradeoff while incurring only slightly degraded performance under bounded prediction errors.

0.45

Speed-Robust Scheduling for Total Completion Time

cs.DS cs.DM ·2026-11-16 ·Moritz Buchem, Nicole Megow, Morten Weber
similarity 0.66
Abstract

We study two-stage speed-robust scheduling for minimizing total completion time. Jobs must be partitioned into $M$ bags before an adversary reveals the speeds of at most $M$ machines. Each bag is then assigned to one available machine, and the jobs on each machine may be processed in any order independent of the bags. We compare with an optimal schedule that knows the speeds in advance and assigns jobs individually. This model has been studied for makespan minimization. We initiate its study for total completion time, as suggested by Stein and Zhong (TALG 2020). For an unknown number of identical machines, we show that the optimal deterministic robustness factor is exactly~$13/12$, both for unit-size jobs and for arbitrary processing times. For infinitesimally small jobs, the factor lies between $31/30\approx1.0333$ and $28/27\approx1.0370$, well below the optimal makespan factor of about $1.2071$. General speeds make the problem strictly harder: no deterministic algorithm is better than $1.2669$-robust, already for infinitesimally small jobs. We give a $25/16$-robust algorithm for arbitrary processing times and improve the guarantee to $1681/1152\approx1.4592$ for infinitesimally small jobs. Our main tools are a layer decomposition that extends guarantees from unit-size jobs to arbitrary processing times when one assignment satisfies them for every prefix in non-increasing processing-time order, and a threshold analysis of the bag counts produced by greedy assignment rules.

0.18

Tight Analysis of Randomized Truthful Scheduling: An $(m+1)/2$ Lower Bound

cs.GT ·2026-11-03 ·Wenqian Wang, Chenyang Xu, Yuhao Zhang
theory similarity 0.60
Abstract · 42 pages, 2 figures

The Nisan-Ronen conjecture, a central problem in algorithmic game theory, asserts that no deterministic truthful mechanism for makespan minimization on $m$ unrelated machines can achieve an approximation ratio better than $m$. Christodoulou, Koutsoupias, and Kovács resolved it in 2023, but the optimal approximation ratio achievable by randomized truthful mechanisms remained open. Recently, Anastasiadis, Christodoulou, Koutsoupias, Kovács, and Schecker extended techniques from the deterministic proof to establish a $(3/2-\sqrt{2})(m-1)$ lower bound for universally truthful mechanisms with discrete support and gave a universally truthful mechanism with approximation ratio $m/2+o(m)$. For the broader class of truthful-in-expectation (TIE) mechanisms, however, the gap remained large: the best known upper bound was $(m+5)/2$, while the lower bound was only $2-1/m$. We prove a lower bound of $(m+1)/2$, determining the optimal TIE approximation ratio up to an additive constant as $m/2+Θ(1)$. Our result also improves the leading constant in the lower bound for universally truthful mechanisms from $3/2-\sqrt{2} \approx 0.0858$ to $1/2$. Together with their $m/2+o(m)$ upper bound, our result determines the optimal approximation ratio for universally truthful mechanisms up to lower-order terms.

0.20

Sharp Bounds for Truthful-in-Expectation Scheduling

cs.GT ·2026-11-03 ·Yunpeng Li
theory similarity 0.59
Abstract

We study randomized mechanisms for scheduling indivisible jobs on $n$ unrelated machines. Each machine is controlled by a selfish agent who privately knows its processing time for each job. A mechanism assigns every job to a machine and makes payments. We require truthfulness in expectation: no agent can increase its expected payment minus its expected processing cost by misreporting, regardless of the other agents' reports. The makespan is the maximum total processing time assigned to a machine; the objective is to minimize its expectation. We prove that the optimal approximation ratio is $(n+1)/2$ for every $n\ge7$, relative to the minimum makespan of an integral assignment. The lower bound holds for every $n$ and allows unrestricted computation and arbitrary correlations among assignments, assuming finite expected payments and a guarantee uniform over all finite job counts. The matching mechanism uses correlated rounding and runs in expected polynomial bit time on rational inputs. These guarantees hold for all finite nonnegative processing times. For two machines, we characterize the optimal approximation ratio exactly as an analytic constant, approximately $1.505995705434$, and give a mechanism attaining it. For three machines the optimal ratio is $2$. For four, five, and six machines we obtain upper bounds of $3$, $105/32$, and $29/8$, respectively, compared with the general lower bound $(n+1)/2$. The proofs for $n\ge7$ do not rely on computer-assisted certificates; the two- and three-machine results use exact rational computer-assisted certificates.

0.18

Coordinating Boundaries: Improved Approximation Algorithms for Unweighted Non-Preemptive Throughput Maximization

cs.DS ·2026-10-26 ·Weitian Tong, Yao Xu
similarity 0.59
Abstract · 34 pages, 8 figures

We study unweighted nonpreemptive throughput maximization: given jobs with processing times, release times, and deadlines, schedule a maximum-cardinality subset on identical machines. For every fixed $\varepsilon>0$, we give randomized algorithms with expected approximation ratios $17/13+\varepsilon$ in polynomial time and $21/17+\varepsilon$ in pseudopolynomial time. These improve the respective $4/3+\varepsilon$ and $5/4+\varepsilon$ guarantees of Armbruster, Grandoni, Tinguely, and Wiese [STOC'26]. Both results hold for an arbitrary number of identical machines. Our algorithms build on their configuration-LP and matching framework, which partitions time into blocks. For a job whose window meets multiple blocks, its boundary blocks are the first and last such blocks. Crossing boundary pairs, whose endpoints strictly interleave, permit additional assignments to sampled execution slots, while a noncrossing family can be coordinated using consistent joint distributions on at most three blocks. The exchange analysis accounts for fractional job assignments that must be erased before inserting an additional job. For the pseudopolynomial implementation, we project configurations onto selected job identities and use separate configuration distributions with common placement marginals. This retains efficient pricing while enforcing the correlations needed for coordination.

0.15

Speedup-Aware Rounding for Scheduling Malleable Tasks with Precedence Constraints

cs.DS ·2026-11-11 ·Chi-Yeh Chen
similarity 0.59
Abstract · 31 pages; ancillary files contain the numerical verification programs

We study the scheduling of malleable tasks with precedence constraints on $m$ identical processors to minimize the makespan, assuming that the processing time of a task does not increase and its work does not decrease with the number of processors, and that the work is a convex function of the processing time. The standard two-phase method solves a linear program, rounds the fractional processing times to allotments, caps the allotments at a threshold $μ$, and runs list scheduling. We propose \emph{speedup-aware rounding}, which rounds a task to its slower allotment exactly when this allotment is at most a factor $a$ slower than the fractional processing time. We determine the worst-case increase of the work under this rule exactly and show that no per-task rounding rule with time factor $a$ does better. With $μ=\lceilβ(a)m\rceil$ the algorithm achieves the approximation ratio $13(30+\sqrt{493})/225\approx3.0162$ for every $m$, which improves the previous bound $2+\sqrt2\approx3.4142$; a single task with linear speedup shows that its ratio is at least $\approx2.9558$. For concave speedup functions, which include the roofline, communication, Amdahl and power-law models, the ratio becomes $\approx2.9739$, which improves the ratio $\approx3.2919$ of Jansen and Zhang. We also revisit the strictly decreasing case of our earlier work (Chen and Chu, 2013): the reported ratio $2.9549$ relies on an elimination step that is not valid. In this case the algorithm coincides with that of Jansen and Zhang up to its parameters, and with parameters chosen by the corrected analysis it guarantees their ratio $\approx3.2919$. Finally, without convexity no per-task rounding improves the known time--work trade-off, and the analysis cannot go below $(3+\sqrt5)/2$.

0.23

Pareto-optimal Non-Clairvoyant Scheduling with Predictions

cs.DS cs.GT ·2026-10-23 ·Ziyad Benomar, Vianney Perchet
theory similarity 0.58
Abstract

We study preemptive single-machine non-clairvoyant scheduling with predictions, where a prediction of the order of the jobs (or of their sizes) is available, and the objective is to minimize the total completion time. An algorithm is $c$-consistent if it is $c$-competitive when the prediction is correct, and $R$-robust if it is $R$-competitive whatever the prediction. Since the introduction of this problem as one of the first examples of learning-augmented algorithms, the best possible trade-off between consistency and robustness has remained open. We determine it exactly for deterministic algorithms. For every $R>2$, we give an $R$-robust algorithm whose consistency is \[ c(R)=R\Big(1-\Big(1-\frac{R+2}{R^2}\Big)^{\frac R{R+2}}\Big), \] and we prove that no deterministic $R$-robust algorithm, with either predicted order or predicted job sizes, has better consistency. In particular, consistency $1+\varepsilon$ is achievable with robustness $\varepsilon^{-1/2}+\frac16+O(\sqrt\varepsilon)$, whereas all previous algorithms required robustness $Θ(1/\varepsilon)$. Our algorithm is greedy: it follows the predicted order as fast as possible, subject to the invariant that the cost paid so far is at most $R$ times the optimum of the instance in which every unfinished job would end immediately. The matching lower bound rests on the observation that every robust deterministic algorithm must satisfy the same invariant along its run on correct predictions. Furthermore, we give a simple randomized algorithm, using predicted sizes, with consistency $1+\varepsilon$ and robustness $(3\varepsilon)^{-1/2}+O(1)$, strictly below the deterministic frontier. The question of determining the Pareto-optimal frontier among randomized algorithms remains open.

0.19

Approximation algorithms for identical parallel machine scheduling with assignment costs

cs.DS ·2026-10-24 ·Wei Li
similarity 0.58
Abstract

We study non-preemptive scheduling on identical parallel machines in which assigning job $j$ to machine $M_i$ incurs the cost $c_{ij}=a_iw_j+b_j$. The processing times $p_j$ and the cost weights $w_j$ are independent, and the number of machines is part of the input. For every fixed $\varepsilon\in(0,1]$ and every deadline $T$ for which a schedule with makespan at most $T$ exists, we give a polynomial-time algorithm that computes a schedule with makespan at most $(1+\varepsilon)T$ whose total assignment cost does not exceed the minimum under the deadline $T$. Using this algorithm as a subroutine, we obtain a polynomial-time approximation scheme for minimizing the makespan under a total cost budget whose schedules always satisfy the budget; this answers an open question for costs $c_{ij}=l_ic_j$ with $c_j$ independent of $p_j$. For the lexicographic problem, in which the total assignment cost is minimized among all schedules of minimum makespan, we obtain in polynomial time a schedule with makespan at most $1+\varepsilon$ times the minimum and total assignment cost at most that of a lexicographically optimal schedule; this improves the makespan guarantees of earlier algorithms for additive and multiplicative costs. For costs $c_{ij}=s_i+a_iw_j$, where $s_i$ is charged for each job processed on $M_i$, the same guarantees are obtained in quasi-polynomial time.

0.24