CS Paper Radar

Optimal Dispatch of a Hydrogen-Colocated Renewable-Powered Desalination Plant

Guochen Zhao, Ahmed S. Alahmed

eess.SY ·submitted 2026-09-09 08:21 UTC · v1

Abstract

This paper develops an analytical framework for profit-maximizing dispatch of water, electricity, and green hydrogen in a renewable-powered water desalination plant (WDP) combining thermal and reverse osmosis (RO) desalination. The optimal dispatch reveals that the schedules of the desalination units, electrolyzer, and grid interaction can all be characterized in closed form as functions of renewable generation. At low renewable output, the plant relies on thermal desalination and grid power while maintaining RO desalination and hydrogen production at their minimum setpoints. At high output, it reduces thermal desalination, increases RO desalination, and allocates surplus power and water to hydrogen production. For renewable output within a precomputed intermediate range, the WDP balances energy internally, allocating resources based on the relative marginal values of hydrogen and RO water. Simulations using real solar and plant data show that integrating RO and thermal desalination with renewable generation and hydrogen production achieves the highest daily profit of 75.945 k$, exceeding the best configuration without hydrogen by 15.1%.

Closest papers

Nearest neighbours by meaning across the whole index.

Plant-Wide Hierarchical Electricity-Heat Coordination for Large-Scale Cold-Region ReP2H Plants via Bidirectional Thermal Coupling

eess.SY math.OC ·2026-08-10 ·Yiwei Qiu, Baiping Zhu, Tao Wu, Shi Chen, Buxiang Zhou +1 more
similarity 0.60
Abstract

Large-scale renewable power-to-hydrogen (ReP2H) plants in cold regions suffer from prolonged startup and repeated thermal stress during frequent startup-shutdown operation. The situation becomes worse due to the lack of coordinated heat management among the alkaline electrolysis stacks, balance of plant (BoP), plant thermal utility system (PTUS), and plant building. This paper presents a plant-wide thermal topology and a hierarchical electricity-heat management framework to address the issues. Bidirectional thermal coupling between the stack cluster and PTUS enables preheating, thermal standby, and waste heat recovery, while minute-scale production scheduling is coordinated with second-scale thermal regulation. Case studies based on an 80 MW plant in Northern China show that the proposed framework eliminates cold startups in year round, increases hydrogen yield by 1.50, improves energy and exergy efficiencies by 0.99 and 4.33 percentage points, respectively, and reduces the levelized cost of hydrogen by 3.22%. It also reduces thermal fatigue damage and startup-shutdown-induced voltage degradation.

0.04

Beyond Higher-Pulse Rectification: Operational Harmonic Coordination in Renewable P2H Systems

eess.SY math.OC ·2026-09-03 ·Yangjun Zeng, Yiwei Qiu, Jie Zhu, Yi Zhou, Tao Wu +4 more
similarity 0.57
Abstract

Thyristor rectifiers (TRs) are cost-effective electrolysis power supplies for renewable power-to-hydrogen (ReP2H) systems, but their harmonics may violate grid-code limits. In contrast to conventional solutions that rely on higher-pulse (such as 24-pulse) rectifiers, this paper proposes an operational harmonic coordination scheme that enables low-cost 12-pulse TRs to meet harmonic requirements through coordinated operation. First, a harmonic model quantifies the effects of rectifier transformer (RCT) tap positions and electrolytic currents, enabling harmonic cancellation among multiple electrolyzers (ELZs). A two-layer framework then coordinates hydrogen production and harmonic mitigation. Hourly scheduling determines ELZ commitment within the harmonic feasible region under renewable uncertainty using stochastic programming and a modified progressive hedging algorithm, while minute-level dispatch tracks renewable power and mitigates harmonics. A decomposition algorithm separates production dispatch from harmonic mitigation to improve computational efficiency. Case studies based on real-life projects show that the proposed method increases profit by 31% over current-only regulation. Annual simulations further show that coordinated 12-pulse TRs can replace 24-pulse rectifiers for harmonic compliance by exchanging additional RCT tap actions for lower transformer investment, reducing rectification-stage cost by 37.5%.

0.21

Approximating Energy-Regulation Feasible Region of Virtual Power Plants: A Data-driven Inverse Optimization Approach

eess.SY math.OC ·2026-08-26 ·Ruike Lyu, Hongye Guo, Qixin Chen
publishedhighly cited similarity 0.54
Abstract · Published in: 2024 IEEE Power & Energy Society General Meeting (PESGM)

System operators will probably allow virtual power plants (VPPs) to submit their feasible region (FR) for market clearing and dispatch. A VPP needs to determine its FR to submit as a whole based on the individual operation model of its internal distributed energy resources (DERs), which is an FR aggregation problem. Existing FR aggregation approaches rely on analytical methods, which have issues with generality and adaptability. In this paper, we propose a data-driven approach to approximate the energy-regulation FR of VPPs. It adopts the virtual battery model to approximate the aggregate FR of a VPP and determines the model parameters through inverse optimization based on generated multi-scenario operation data using the original operation model. Numerical tests verified the accuracy of the proposed method. We believe that our work helps to better leverage the flexibility of DERs.

0.63

Water as a Battery: Using Hydropower Flexibility to Support the Grid

eess.SY ·2026-10-25 ·Chinmay Morankar, Abdullah Al Mehadi
published similarity 0.53
Abstract

This study presents a two-layer optimization framework to determine the optimal sizing of PV, wind, and battery storage co-located with existing hydroelectric plants to support rapidly increasing data center loads while minimizing cost, grid reliance, and transmission upgrades. The outer layer uses Particle Swarm Optimization (PSO) to select capacity combinations, while the inner layer performs rolling-horizon dispatch simulations to model hourly energy balance among PV, wind, hydro, and BESS, considering operational constraints. Two case studies were analyzed. At The Dalles Dam (Oregon), favorable wind resources and land availability enabled deployment of 111.2 MW PV and 117.9 MW wind, with no BESS required. Hydro flexibility allowed the system to meet the load with minimal grid support. In contrast, Conowingo Dam (Maryland) faced land constraints and limited renewables to 130 MW PV, leading to higher grid dependence. Co-locating hydro with renewables significantly enhances reliability and cost effectiveness by leveraging hydro's dispatchability to balance daily and seasonal variable generation from PV + Wind, reducing the need for storage or costly grid imports. This analysis provides a framework to meet the 99.9% availability targets of this new load type on the grid with sustainable energy resources.

0.32

Data center cooling choices shift water impacts across the grid: An integrated water-energy model for sustainable data center development

eess.SY cs.CYcs.DC ·2026-09-21 ·Garrett Alston, Nancy Love, Rabab Haider
code/data similarity 0.53
Abstract · 12 pages; 8 figures; 6 tables; appendix

Data centers are being developed at an unprecedented pace, yet their energy and water impacts, and the spatial and temporal distribution of these impacts, remain poorly characterized. Data centers consume water for cooling (direct) and through electricity generation (indirect). Decisions on siting and cooling technology result in water-energy trade-offs that extend impacts beyond the facility's location. Existing assessment frameworks rely on facility efficiency metrics and average grid water intensity factors, suppressing the temporal impacts of data center load and generation availability. They also attribute indirect consumption to the facility's location rather than to the generators (and corresponding hydrologic regions) that respond to the added load, misattributing spatial impacts. To close this gap, we develop a computational model of the data center-energy-water nexus that links facility cooling and electricity demand with hourly economic dispatch, generator-level water consumption, and monthly subbasin depletion. Built on open-source data, the model resolves where and when water is consumed, and where this consumption compounds existing water risk or creates new risk. Using the model, we study different cooling configurations and proposed developments in the state of Michigan. Air-cooled data centers halve total water consumption relative to evaporative cooling, but increase electricity demand and raise indirect water consumption by one-third, shifting the water footprint from the facility to generators. Mapping these changes to subbasins reveals depletion increases beyond the data center sites, in regions that facility-level reporting may overlook. These results show that data center water and energy impacts cannot be assessed in isolation, motivating the need for integrated modeling to inform siting, design, and reporting practices.

0.22

A Closed-Loop Model of an Anion Exchange Membrane Electrolyser Based on Operational Data

eess.SY ·2026-09-16 ·Maiken Borud Omtveit, Lisa Marie Dannappel, Shi You, Kjetil Uhlen
similarity 0.52
Abstract · 5 pages, IEEE ISGT 2026

The main contribution of this work is to identify model parameters for an Anion Exchange Membrane (AEM) system directly from measured operational data, enabling their use in power system studies. Due to the relatively low technology readiness level (TRL) of AEM electrolysers, only limited literature reports operational parameters supported by openly available experimental data. By capturing the realistic dynamic behaviour and power consumption of the AEM electrolyser, this model allows for more accurate evaluation of system topologies and control strategies for green hydrogen production. This paper presents a model of an AEM electrolyser based on experimental data from Enapter modules installed in the Power-to-X (PtX) Laboratory at the Technical University of Denmark [1]. The model comprises a polarisation curve and a model of current dynamics during operation. It is validated against operational data and can be applied in grid-balancing studies as well as in assessments of how electrolyser dynamics influence the power system. The results suggest that the AEM technology is suitable for services such as smoothing wind farm power output and provide system services to support frequency balancing. The findings highlight the importance of considering the constraints of the process when designing for flexible load operation, and consideration of the interaction between the power control and process control systems.

0.18

Unit-to-Plant Stability Shaping of Multi-Electrolyzer ReP2H Plants via Interface Design and Dispatch

eess.SY math.OC ·2026-08-24 ·Miao Zhang, Yiwei Qiu, Xiaoyu Wang, Linlin Wu, Yi Zhou +3 more
similarity 0.52
Abstract

Alkaline water electrolysis (AWE) units supplied by insulated gate bipolar transistor rectifiers (IGBT-Rs) may experience oscil-lations caused by coupling between rectifier control and electro-lyzer (ELZ) dynamics. Because this risk varies with unit loading and power allocation, production-oriented dispatch may place a multi-ELZ renewable power-to-hydrogen (ReP2H) plant near or exceed its stability boundary. This paper proposes a stability-oriented framework for control design and plant production dis-patch. A three-port admittance model links the ac port, dc link, and electrolysis stack. Unit-level dc-port analysis quantifies the effects of loading, temperature, Buck bandwidth, and dc-link capacitance, while plant-level aggregation evaluates how unit commitment and power allocation affect stability. Results show that higher loading reduces stability, whereas larger dc-link ca-pacitance and higher Buck bandwidth improve it. Under the same plant loading, different power allocations result in different plant-level stability margins, with balanced allocation generally providing a larger margin than concentrated allocation. The plant-level model thus distinguishes the stability margins of ad-missible schedules. Hardware-in-the-loop (HIL) tests validate these trends and the proposed redistribution rule. The resulting operating regions and dispatch rules can be used to screen unit commitment and power allocation decisions in plant production scheduling.

0.23

Co-Optimized Generation, Transmission, and Storage Expansion: System Value and Optimal Duration of Pumped-Storage Hydropower

eess.SY math.OC ·2026-08-27 ·Rafael Benchimol Klausner, Rafael Kelman
similarity 0.52
Abstract

Expansion planning models usually fix storage duration before optimization, setting how much storage power to build but not for how long it can discharge. We present a generation-transmission-storage expansion framework in which candidates of many durations compete on annualized cost, making the duration mix an optimization outcome. It is a rolling-horizon, two-stage stochastic linear program, each five-year stage is a full year at hourly resolution under ten coherent inflow, wind, and solar scenarios. We apply it to the Brazilian Interconnected System over 2030-2050, where demand roughly doubles to 1,716 TWh/year and variable renewable energy (VRE) supplies most new capacity. Two cases are compared: 36 pumped-storage hydropower (PSH) candidates over four subsystems and nine durations (4-144 h) alongside 4-h battery energy storage systems (BESS), and BESS alone. With PSH available, the model builds 31.2 GW / 755 GWh of PSH and no BESS, dominated by 12-h capacity with 4.9 GW of 72-h units. Without PSH it builds 38 GW / 152 GWh of BESS and 7.8 GW more gas-fired capacity, mostly open-cycle peakers. PSH lowers 2050 annualized system cost by US$ 5.0 billion/year (6.8%), operating cost by 23.5%, thermal generation by 34 TWh/year, and long-run marginal cost by 20%; 2035 VRE curtailment falls from 8.4% to 3.2%. The magnitudes are specific to Brazil, but the underlying mechanism is general: limiting storage candidates to a single duration understates the system's optimal energy-storage requirement and overstates its residual need for thermal capacity.

0.30