The rapid expansion of hyperscale data centers is significantly increasing electricity demand in Northern Virginia. Dominion Energy, the region's primary electric utility, must reinforce its transmission network to support this growth. These projects require planned outages that must be evaluated months in advance to support construction planning and outage coordination while meeting NERC and PJM N-1 reliability requirements. Long-term outage studies are commonly performed day by day using monthly or seasonal peak-load assumptions. Although this approach simplifies analysis, it can be overly conservative because it does not capture granular load variability. Consequently, short-duration outages that may be feasible under realistic loading conditions are often postponed or denied, delaying critical transmission expansion and grid modernization projects. This paper evaluates the operational value of incorporating realistic multigranular load forecasts into long-term, contingency-based outage assessments and compares the results with conventional peak-based methods. Daily, weekly, and monthly forecasts are developed using statistical and machine-learning models, including SARIMA, Prophet, Gradient Boosting, and Random Forest, followed by bottom-up temporal reconciliation to maintain consistency across forecast horizons. Results show that granular load forecasts reduce unnecessary conservatism and improve outage accommodation, particularly for short-duration requests, without changing existing reliability criteria. The proposed approach can strengthen long-term outage coordination and support timely transmission reinforcement and grid modernization.

Closest papers

Nearest neighbours by meaning across the whole index.

Peak-Aware Short-Term Load Forecasting Across Distribution Grid Aggregation Levels

cs.LG ·2026-09-16 ·Souhardya Chattopadhyay, Julian Oelhaf, Antonia Schoening, Jessica Deuschel, Bitan Bhattacharyya +3 more
published similarity 0.65
Abstract · 5 pages, 2 figures, 3 tables, Accepted at IEEE PES ISGT Europe 2026

For distribution system operators, short-term load forecasting (STLF) supports congestion management, voltage control, and asset protection. Most existing approaches focus on overall accuracy across all time steps and neglect performance during high-demand (HD) periods, where larger forecast errors can increase the risk of congestion and voltage violations. In this paper, we study peak-aware STLF across three operator-relevant distribution grid aggregation levels, area codes (AC), secondary substations (SUB), and low-voltage (LV) feeders, using open datasets from the United Kingdom and Switzerland. We compare statistical baselines, machine learning models (LightGBM and XGBoost), and recent time-series foundation models (Chronos Bolt and Chronos-2) under a peak-aware evaluation framework that reports both overall and HD forecasting performance using NMAE and MAPE. The results show that Chronos-2 achieves the best HD performance across all aggregation levels, with HD-NMAE and HD-MAPE of 0.039 and 4.53% at AC, 0.080 and 9.45% at SUB, and 0.138 and 16.14% at LV, while Chronos-Bolt consistently ranks second best. Compared with the gradient boosted ML models, Chronos-2 reduces mean HD-NMAE by about 20-51% across levels while remaining best or near-best on the overall metrics. A quantile analysis of the probabilistic Chronos outputs further identifies aggregation-specific operating points, and runtime measurements indicate that foundation model inference is fast enough for practical deployment. Overall, the findings highlight peak-aware evaluation and aggregation specific quantile selection as a practical pathway toward more operationally relevant STLF in distribution networks.

0.51

Parameter-Efficient Adaptation of Time Series Foundation Models for Electrical Load Forecasting

cs.LG cs.AI ·2026-10-20 ·Aliullah, Julian Oelhaf, Edouard Fouché, Jessica Deuschel, Christian Bergler +2 more
published similarity 0.64
Abstract · Accepted for presentation at the IEEE Power & Energy Student Summit (PESS 2026), Karlsruhe, Germany. 6 pages, 4 figures, 1 table

Accurate electrical load forecasting supports power-system operation across countries, regions, cities, and buildings, but repeated development of target-specific models is costly. Time series foundation models (TSFMs) provide reusable pretrained backbones, although multi-domain pretraining may not fully capture load-specific characteristics. This paper compares pretrained inference, full fine-tuning, and low-rank adaptation (LoRA) in terms of forecasting accuracy and adaptation efficiency across four electrical load aggregation levels. MOIRAI 1.0 Large serves as the primary backbone, while Chronos-2 assesses whether the findings transfer across model families. The evaluation covers both in-distribution (ID) and out-of-distribution (OOD) settings and examines whether compact adaptation provides consistent gains over strong pretrained checkpoints. Pretrained foundation models outperform the implemented seasonal naive and XGBoost baselines across the evaluated aggregation levels. On MOIRAI Large, rank-16 LoRA reduces normalized mean absolute error (NMAE) by 7.5% on average while updating 3.146 million parameters, about 1% of the model, and retains most of the improvement from full fine-tuning. Chronos-2 achieves lower pretrained NMAE than MOIRAI, while its relative adaptation gains remain smaller overall. OOD results show that adaptation benefits vary by target, with the clearest gains for the local-area series and several buildings. Overall, LoRA provides a favorable accuracy-efficiency trade-off when adaptation yields a meaningful gain over a strong pretrained checkpoint.

0.28

OutageDiT: A Foundation Model for Power Outage Forecasting and Scenario Generation

cs.LG cs.AI ·2026-09-01 ·Yunqin Zhu, Feng Qiu, Yao Xie
published similarity 0.63
Abstract · 11 pages, 3 figures, 3 tables. Accepted at the NeurIPS 2026 Second Workshop on MLxOR

Power-outage planning requires scenarios before an event occurs. These scenarios must represent uncertainty in magnitude, timing, and duration while preserving temporal dependence. However, severe events are rare, and data from any single region contain few examples of extreme outage and restoration patterns. To address this challenge, we introduce OutageDiT, a foundation model for generating seven-day outage trajectories at 15-minute resolution, trained on outage and weather records across the United States. Specifically, a condition encoder processes historical context and known future covariates once per forecast, and a shallow flow-matching decoder reuses the resulting horizon-aligned states to sample complete outage trajectories. This enables point forecasting, uncertainty quantification, and conditional scenario generation within one deep generative model. Across outage forecasting benchmarks, OutageDiT improves forecast accuracy and scenario quality over strong baselines and supports zero-shot transfer to held-out regions. Together, these results position conditional outage scenario generation as a bridge from outage forecasting to operational planning under uncertainty.

0.26

U.S. Data Center Growth Through 2030: A Critical Review of Grid Adequacy and Transmission Expansion Planning

eess.SY ·2026-11-10 ·Babak Porkar, Mona Ghassemi
hot direction similarity 0.63
Abstract

The growth of large data centers raises questions about both supply adequacy and the suitability of load representations used in connection studies. This paper critically reviews the U.S. demand, generation, and transmission outlook through 2030 and examines the implications for transmission expansion planning (TEP). Comparison of public forecasts highlights distinctions among annual average demand, peak demand, and grid connection capacity. National generating-capacity totals cannot establish a dependable surplus because resource availability, regional adequacy, transmission constraints, and project timing determine supply capability. Recent grid events and published dynamic studies demonstrate that faults can trigger substantial data-center transfers to backup supply, followed by delayed or coordinated demand recovery. These behaviors require appropriate representation within the conventional planning framework, alongside assessment of the requested maximum grid import. The selected literature reveals limited integration of validated data-center dynamic models into the technical screening and economic comparison of expansion alternatives. The review identifies the need to establish whether fault response and recovery change feasible connection capacity, required reinforcement, or the preferred transmission investment.

0.28

Medium-Term Multi-Resolution Electric Load Forecasting using Economic Data and Foundation Model

cs.LG ·2026-09-25 ·Lindas Eloi, Goude Yannig, Ciais Philippe
similarity 0.63
Abstract

Accurate medium-term, from a few months to a few years, electricity load forecasts are crucial for informed decision-making in power plant maintenance scheduling, load dispatch and price settlement. Being comprised between Long-Term Load Forecasting (LTLF) which uses mostly economic projections and appliances development scenarios, and Short-Term Load Forecasting (STLF) driven by weather, calendar and autoregressive patterns, Medium-Term Load Forecasting (MTLF) requires both extrapolation capabilities and variability modeling. Yet, it remains unclear if MTLF can benefit from economic indicators, and especially at which forecast horizon and resolution. To address these challenges we investigated the impact of socioeconomic data on predictions issued 1 month and up to 48 months in advance for France at monthly and daily resolution using a tabular Foundation Model (FM). A dataset covering 20 years of observations of electricity load, weather variables and economic features such as consumer price and production indices, electric vehicle counts or employment is created for the study. To avoid noisy data, we used a new feature selection pipeline, creating ensemble of expert models with diverse feature subsets, to demonstrate that selected economic covariates improve forecast skill by 20% over 2015-2025. This enhancement is steady across lead times and resolutions limiting the Mean Absolute Percentage Error to 4% for monthly granularity and 5% for daily granularity. Explainability of the models is investigated through feature and context importance. Results showed that the FM is limited in the context it leverages pointing towards potential computational savings with a reduced context, while feature importance of economic predictors grows with the forecast horizon. This suggests that including economic data in MTLF could bridge the gap with LTLF leading to seamless forecasts.

0.18

Grid-Oriented Probabilistic Load Forecasting for AI Data Centers

eess.SY cs.LG ·2026-11-06 ·Qingyi Yao, Ding Lin, Tianqiao Zhao, Meng Yue, Jianhui Wang
benchmark similarity 0.63
Abstract

Probabilistic load forecasts for AI data centers need to represent both uncertainty under changing workloads and temporal dependence to support grid operations. This paper develops an open, grid-oriented benchmark using measured GPU power from a 448-GPU AI cluster. Forecasts are evaluated through four stages: probabilistic prediction, online uncertainty calibration, temporal scenario generation, and horizon-wide reserve sizing. Following a change in cluster utilization, a quantile LightGBM forecast achieves only 63.4% coverage for a nominal 90% interval, while online regime-conditioned calibration increases coverage to 87.3%. Even with well-calibrated marginal forecasts, independent sampling produces unrealistic ramp distributions and excessive reserve procurement. Reconstructing temporal dependence from historical forecast errors reduces the discrepancy in ramp statistics and lowers realized reserve cost by 7.4-10.6% across three forecasting tasks. These findings show that marginal forecast quality alone is insufficient for operational decisions and motivate joint evaluation of calibration, temporal structure, and decision outcomes.

0.22

Benchmarking Time Series Foundation Models for Load Forecasting Under Covariate Uncertainty

cs.LG eess.SY ·2026-10-05 ·Tomas Kaljevic, Ivan Arzola, Yu Zhang
publishedbenchmark similarity 0.62
Abstract · 5 pages, 1 figure, 5 tables. Accepted to the 2027 IEEE PES Grid Edge Conference & Expo, Salt Lake City, UT, USA, 19-22 April 2027

Accurate short-term load forecasting (STLF) is essential for the reliable and efficient operation of modern power systems. While time series foundation models (TSFMs) have recently demonstrated remarkable performance across a wide range of forecasting tasks, their effectiveness for STLF under realistic operational conditions remains largely unexplored. In this paper, we present a comprehensive benchmark of four trained-from-scratch (TFS) models and four TSFMs across three real-world load forecasting datasets under operational scenarios that differ in the availability and quality of future covariate information. Our results show that Chronos-2 consistently achieves state-of-the-art performance in both zero-shot and fine-tuned settings when future covariates are available or accurately forecast. However, its performance degrades as covariate forecasts become increasingly noisy, whereas TimesNet exhibits greater robustness under severe covariate uncertainty. These findings demonstrate the effectiveness of covariate-informed TSFMs for STLF while highlighting the critical role of robust covariate modeling in real-world forecasting applications.

0.19

Assessing Covariate-Informed Grid Load Forecasting with a Time-Series Foundation Model

cs.LG cs.AIeess.SY ·2026-09-06 ·Varsha Pendyala, Yiwei Fu, Weizhong Yan, Nurali Virani
publishedbenchmark similarity 0.62
Abstract · Presented at the 2026 IEEE International Joint Conference on Neural Networks (IEEE World Congress on Computational Intelligence), Maastricht…

Modern power systems are growing increasingly complex as they integrate diverse generation sources to meet rising demand, making accurate load forecasting challenging. Recent advances in time-series foundation models (TSFMs) resulted in promising performance in zero-shot univariate load forecasting tasks. However, real-world load forecasting often involves multiple target variables and requires the integration of exogenous variables, raising important questions about the utility of TSFMs in realistic settings. In this study, we position Chronos-2, a recently developed model by Amazon, as a representative multi-channel TSFM that supports univariate, multivariate, and covariate-informed forecasting, and conduct a systematic investigation of how such models can be used for real-world load forecasting. While prior work has evaluated Chronos-2 on a limited number of energy-related tasks in a zero-shot setting, its performance relative to established task-specific deep learning models and its behavior when adapted using task-specific historical data remains insufficiently understood. In this work, we evaluate Chronos-2 on two real-world utility datasets, ISO New England and ENTSO-E, and benchmark it against widely used task-specific deep learning models. Our results show that Chronos-2 benefits substantially from task-specific fine-tuning and achieves strong short-horizon forecasting performance, but its zero-shot accuracy lags behind task-specific models and its forecasting error grows more rapidly with increasing forecast steps. Overall, this study provides a detailed characterization of the strengths and limitations of TSFMs such as Chronos-2 in grid load forecasting and offers practical insights into how a pretrained TSFM can be effectively adapted for operational load forecasting applications.

0.26