CS Paper Radar

Job Scheduling with Battery Recharging Constraints

Rudransh Kumar, Nima Nasiri, Jared Paul, Sathish Gopalakrishnan

cs.DS ·submitted 2026-10-01 20:15 UTC · v1

Abstract

A battery-powered device, such as a delivery drone that works from a depot, must stop to recharge between jobs, and the time spent recharging delays every job that follows. Scheduling models that fix the duration of a recharge do not describe a device whose recharge takes longer when it acquires more energy. We study a single device that executes a batch of non-preemptive jobs with known execution times, energy demands, and optional deadlines. Under \emph{partial recharging} the device may acquire any amount of energy between jobs; under \emph{complete recharging} every recharge fills the battery. Four objectives and four relationships between execution time and energy demand give 32 variants. When acquiring $q$ units of energy takes $q$ time units, we show that 14 of the 16 partial-recharging variants are polynomial, and we give a tight 2-approximation for the average completion time, one of the two NP-hard variants. Under complete recharging, the four variants with equal energy demands are polynomial and the other 12 are NP-hard; for makespan we give a $5/4$-approximation. When each recharge also incurs a fixed \emph{setup time} $h$, the equal-energy variants remain polynomial and the other 24 are strongly NP-hard if $h$ is part of the input. For these we give exact algorithms that are exponential only in the number of jobs, and approximation algorithms for makespan and, when the battery starts empty, for the weighted average completion time. Experiments on synthetic and trace-derived job sets compare the algorithms with exact optima. The model is offline and deterministic, and we have not validated the schedules on hardware.

Closest papers

Nearest neighbours by meaning across the whole index.

Pre-emptive Carbon Aware Scheduling for Edge Workloads

cs.DS ·2026-10-21 ·Cecilia Chen, Rajni Dabas, Samir Khuller, Emilie Rivkin
similarity 0.63
Abstract

Power grids use a constantly changing mix of fossil fuels and clean renewables like solar and wind. Because of this, the {\em carbon footprint} fluctuates drastically based on time and geographic location. Time-varying carbon intensity creates opportunities to reduce carbon emissions by shifting workloads to cleaner periods, but deadlines, task dependencies, and limited edge capacity constrain this flexibility. We study carbon-aware scheduling of jobs with release times, deadlines, and arbitrary precedence constraints under piecewise-constant carbon costs. Jobs execute preemptively on a single edge server or are outsourced at job-dependent costs to an unlimited-capacity cloud, modeled as providing instantaneous execution. The objective is to minimize the sum of edge carbon costs and cloud outsourcing costs while satisfying all timing and precedence constraints. For edge-only execution, we give an exact polynomial-time algorithm. Allowing cloud outsourcing makes the problem NP-hard, but we obtain a fully polynomial-time approximation scheme through a reduction to preemptive scheduling with rejection penalties (weighted tardiness). In contrast, even two edge servers without job migration admit no polynomially bounded approximation when carbon-cost variation is unrestricted, unless \(P=NP\). We complement these theoretical results with experiments on controlled synthetic workloads and production-derived Alibaba traces. On synthetic instances, our incremental max-flow implementation is $4.96\times$ faster on average than a direct min-cost flow, while experiements on production-derived workloads evaluate its performance under realistic job structures.

0.22

Asymmetric Weighted Earliness-Tardiness: Scheduling with a Nonrestrictive Common Due Date

cs.CC math.OCcs.DMmath.CO ·2026-09-12 ·Nicholas G. Hall, Hans Kellerer, Miao Song
similarity 0.61
Abstract · 268 pages, 12 figures, 29 tables

Single-machine asymmetric weighted earliness--tardiness (AWET) scheduling asks how to sequence jobs around a common synchronization date when early and late completion incur unrelated job-dependent penalties. At the boundary nonrestrictive date $d=\sum_jp_j$, a compact V-shaped schedule reduces the continuous-time problem to a quadratic choice of a nonempty early set. We establish four complementary results for this model. First, the positive-integer problem is strongly NP-complete by a unary-polynomial reduction from Restricted Exact Cover by 3-Sets. Second, unrestricted AWET admits a polynomial-time $(3+2\sqrt2+\varepsilon)$-approximation based on an anchored semidefinite relaxation and deterministic marginal thresholding. Third, when the earliness and tardiness ratio orders are strict reversals, the problem is weakly NP-complete but has an exact two-resource pseudopolynomial dynamic program. Fourth, for fixed total refinements whose ratio permutation is separable, an exact separating-tree recurrence and coordinated geometric trimming yield an FPTAS. The proofs use different manifestations of the same canonical objective: scale-separated prefix penalties, positive-semidefinite minimum-kernel covariance, a dominant completed load square, and a bounded four-coordinate decomposition interface. Together, the results show that the decisive issue is not merely whether the two ratio orders agree, but whether their interaction can be controlled by a global certificate or compressed into a bounded constructive interface.

0.21

An EPTAS for Vector Scheduling with Time Intervals

cs.DS cs.CC ·2026-09-27 ·Junho Hwang
theory similarity 0.61
Abstract · 18 pages, 4 figures. v2: extended to several resources and unrelated machines, with a new title and simplified proofs

We study vector scheduling in which each job is active during a fixed time interval. A job uses several resources and stays on one machine for its entire interval; its resource requirements may depend on the machine. The objective is to minimize the largest resource load over all machines and times. For $r$ machines and $d$ resources, we give a deterministic $(1+\varepsilon)$-approximation in $f(r,d,1/\varepsilon)N^{O(1)}$ time, where $N$ is the binary input length. This gives an efficient polynomial-time approximation scheme for fixed $r$ and $d$, extending approximation schemes for scalar temporary tasks assignment. The algorithm merges jobs into blocks whose time intervals are fixed before any machine is chosen, and assigns the blocks by dynamic programming over a balanced recursive split of the time line. We also prove strong NP-hardness and an exponential lower bound in $1/\varepsilon$ under the Exponential Time Hypothesis, already for two identical machines and one resource.

0.13

Robust and Scalable UAV-UGV Planning for Aerial Monitoring under Energy and Precedence Constraints

cs.RO cs.MAeess.SY ·2026-10-08 ·Cahit Ikbal Er, Yasin Yazicioglu
similarity 0.61
Abstract

We consider planning for unmanned aerial vehicle (UAV) and unmanned ground vehicle (UGV) teams in aerial monitoring missions with ordering requirements on the monitoring points to be visited by the UAV. The system consists of multiple UAV-UGV teams, each comprising one UAV and one UGV. UAV energy limitations are modeled through endurance, defined as the maximum flight time on a full battery. The UGVs serve as mobile charging stations and transport the UAVs between consecutive aerial tours. Given a set of monitoring points subject to ordering constraints and the teams' initial and terminal positions, the objective is to minimize mission completion time while satisfying UAV energy limits and the required visit order under bounded travel-time disturbances that may arise during execution. Unlike prior work, the plan jointly determines vehicle routes and their timing, allowing teams to slow down as needed to satisfy the ordering constraints. We develop a polynomial-time algorithm that generates efficient solutions to the underlying NP-hard planning problem. We establish feasibility guarantees, characterize the algorithm's computational complexity, and evaluate its performance via numerical comparisons.

0.19

Capacity Credit of Data-Centre Flexibility: The Role of Workload Scheduling and Usable Battery Energy

eess.SY ·2026-11-17 ·Pengyu Ren, Wei Sun, Jiakai Wu, Yifan Wang
similarity 0.60
Abstract

Data centres that offer the same reduction in grid demand can make different contributions to supply adequacy. We estimate the effective load-carrying capability of workload scheduling and on-site batteries by matching expected unserved energy across paired simulations. Longer task deadlines increase capacity credit by giving operators more choice over when to defer and recover work. A fixed evening commitment shifts more work than deadline-based scheduling but delivers a smaller reduction in expected unserved energy. Protected backup reserves leave uninterruptible power supplies with limited capacity credit, while longer discharge durations raise the credit of dedicated batteries at the same response rating. These findings suggest assessing recovery deadlines and dispatchable energy alongside offered demand reductions.

0.18

Scheduling to Maximize Weighted Throughput with an Active-Time Budget

cs.DS ·2026-08-29 ·Susanne Albers, G. Wessel van der Heijden
publishedtheory similarity 0.60
Abstract · 16 pages, 5 figures, To appear at WAOA 2026

We study the active-time scheduling problem with weighted throughput maximization. In this setting, a set of $n$ jobs $J$ arrive at integer release times, each with an integer processing time and integer deadline. Jobs may be preempted at integer time slot boundaries. A schedule assigns jobs to time slots, with at most $m$ jobs assigned to the same time slot. A slot is called \emph{active} if at least one job is scheduled in it. Instead of scheduling all jobs to minimize the number of active time slots, we consider the more general variant of \emph{weighted throughput} with an active-time budget $K$, where each job $j\in J$ has a weight $w_j$. The objective is to maximize the total weight of \emph{completed} jobs using at most $K$ active time slots. This means that partially scheduled jobs do not count towards the objective. The classical active-time minimization problem is recovered by asking whether all jobs can be completed within a given active-time budget. We give hardness, approximation, and exact algorithmic results. For general intervals with unbounded parallelism, we prove NP-hardness, rule out an FPTAS unless $\mathrm{P}=\mathrm{NP}$, and give a pseudo-polynomial time $Ω(1/\log K)$-approximation. For proper intervals, we prove a canonical structural lemma and obtain an exact $(nK)^{O(m)}$-time algorithm. For laminar intervals, we give an exact $f(K,m)\cdot n^{O(1)}$-time algorithm.

0.25

Approximation algorithms for identical parallel machine scheduling with assignment costs

cs.DS ·2026-10-24 ·Wei Li
similarity 0.59
Abstract

We study non-preemptive scheduling on identical parallel machines in which assigning job $j$ to machine $M_i$ incurs the cost $c_{ij}=a_iw_j+b_j$. The processing times $p_j$ and the cost weights $w_j$ are independent, and the number of machines is part of the input. For every fixed $\varepsilon\in(0,1]$ and every deadline $T$ for which a schedule with makespan at most $T$ exists, we give a polynomial-time algorithm that computes a schedule with makespan at most $(1+\varepsilon)T$ whose total assignment cost does not exceed the minimum under the deadline $T$. Using this algorithm as a subroutine, we obtain a polynomial-time approximation scheme for minimizing the makespan under a total cost budget whose schedules always satisfy the budget; this answers an open question for costs $c_{ij}=l_ic_j$ with $c_j$ independent of $p_j$. For the lexicographic problem, in which the total assignment cost is minimized among all schedules of minimum makespan, we obtain in polynomial time a schedule with makespan at most $1+\varepsilon$ times the minimum and total assignment cost at most that of a lexicographically optimal schedule; this improves the makespan guarantees of earlier algorithms for additive and multiplicative costs. For costs $c_{ij}=s_i+a_iw_j$, where $s_i$ is charged for each job processed on $M_i$, the same guarantees are obtained in quasi-polynomial time.

0.24

Energy Aware Optimization of Non-Deterministic Task-Based Intermittent Computing Nodes with Thimble

cs.NI ·2026-11-11 ·John Madden, Morgan Masters, Alec Levy, Steve McGuire, Colleen Josephson
similarity 0.59
Abstract

Intermittent computing nodes run on harvested energy, which they store in capacitors and spend in short bursts of computation. Choosing those capacitors is a trade-off: large capacitors can power large tasks but leak more current, wasting harvested energy, while small capacitors leak less but cannot power large tasks. Recent work, LEACS, showed that selecting capacitors and mapping tasks to them at compile time improves inference throughput. However, LEACS optimizes the mapping for a predetermined workload, whereas sensor nodes often run data-dependent workloads in which the next task depends on the outcome of earlier ones. We present Thimble, an energy storage system that maps a node's tasks to capacitors at runtime. Thimble models the workload as a Markov chain over tasks and assigns each task to a capacitor by weighing capacitor leakage, the task's energy demand and, when it replans, the likelihood of each future task. We compare Thimble against a reimplementation of LEACS, which ranks every static plan by simulation. When the training trace resembles deployment, Thimble's single design-time solve comes within 0.3--4% of LEACS's throughput. When the deployment conditions drift from the characteristics of the training set, LEACS's throughput-focused static plans can fail sharply. On the lowest-power source we consider, LEACS's plan stalls on deployment traces that harvest less than its training trace, and on some never wakes; Thimble avoids this, with 22--29% higher throughput at the reference workload. A sensitivity sweep over 25 workload profiles on that source shows that Thimble with depth replanning leads LEACS by 22--42% throughout, and what run-time remapping adds: replanning at a fixed interval matches or improves on the static map at 21 of 25 points, by up to 7%.

0.31