CS Paper Radar

Capacity Credit of Data-Centre Flexibility: The Role of Workload Scheduling and Usable Battery Energy

Pengyu Ren, Wei Sun, Jiakai Wu, Yifan Wang

eess.SY ·submitted 2026-11-17 14:04 UTC · v1

Abstract

Data centres that offer the same reduction in grid demand can make different contributions to supply adequacy. We estimate the effective load-carrying capability of workload scheduling and on-site batteries by matching expected unserved energy across paired simulations. Longer task deadlines increase capacity credit by giving operators more choice over when to defer and recover work. A fixed evening commitment shifts more work than deadline-based scheduling but delivers a smaller reduction in expected unserved energy. Protected backup reserves leave uninterruptible power supplies with limited capacity credit, while longer discharge durations raise the credit of dedicated batteries at the same response rating. These findings suggest assessing recovery deadlines and dispatchable energy alongside offered demand reductions.

Closest papers

Nearest neighbours by meaning across the whole index.

State-of-Charge Targets for Storage Participation in Two-Settlement Markets: Reliability, Price, and Compensation Impacts

eess.SY ·2026-11-13 ·Yichen Li, Alexandre Moreira, Ruiwei Jiang, Miguel Heleno, Julie Mulvaney-Kemp
hot direction similarity 0.70
Abstract

As energy storage assumes a larger role in electricity systems, market operation must coordinate its use across time to support reliability during periods of system stress. Minimum state-of-charge (SOC) targets provide a means of preserving energy for these periods, but their design shapes reliability, operating efficiency, and storage compensation. This paper evaluates alternative SOC target designs in a California-based day-ahead and real-time electricity market model. The comparison examines targets based on day-ahead schedules or rolling centralized dispatch, enforced at the individual-resource or system level, across seasons, stress conditions, and participant information settings. The results show that retaining more energy does not necessarily reduce load shedding: targets that restrict discharge can limit storage support during shortages. Under critical summer conditions, individual targets derived from rolling centralized dispatch reduce weekly load shedding by approximately 83--84\% relative to operation without targets. Lower RT clearing costs and average prices can coexist with higher storage compensation, reflecting the role of day-ahead positions and real-time deviations in determining settlement outcomes. These findings highlight the importance of coordinating energy retention with timely discharge and network deliverability when designing SOC requirements for storage participation in electricity markets.

0.20

Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation

eess.SY math.OC ·2026-11-06 ·Wei Wang, Himanshu Sharma, Thiagarajan Ramachandran
similarity 0.69
Abstract

Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load fluctuations through reserved active power with zero net state-of-charge change, and (iii) voltage support via reactive power capability at the point of common coupling. Minute-level operational scheduling enforces state-of-charge feasibility and load ramp constraints, and incorporates a controllable queue of delay-insensitive computing tasks to enhance flexibility. A case study using a real data center load profile demonstrates the proposed method and quantifies the BESS power-energy requirements and operational trade-offs needed to satisfy the multi-service constraints, providing practical guidance for interconnection planning and deployment.

0.05

Mitigating the Grid Impact of Gigawatt-Scale AI Data Centers via High-Fidelity Model Flexibility

eess.SY math.OC ·2026-11-18 ·Eihab E. E. Ahmed, Saeed Manshadi
hot direction similarity 0.68
Abstract

Gigawatt-scale artificial intelligence data centers (AIDCs) are being connected at a single point of interconnection (POI) faster than transmission can be reinforced, yet studies of their flexibility rely on DC power flow and simplified load envelopes that omit voltage, cooling dynamics, and workload deadlines. This paper addresses this gap by embedding a high-fidelity AIDC model, with separate inference and training pools, hall thermal mass, PV, a battery energy storage system (BESS) with reactive capability, and a STATCOM, in a five-minute multi-period AC optimal power flow. Simulations on the RTS-GMLC test system show that active-power flexibility mitigates local price spikes and relieves congestion, whereas reactive support from the BESS inverter or a STATCOM is needed to keep the POI voltage away from sagging around its 0.95~pu limit. Sensitivity analyses show that cost-driven charging of large batteries can induce new morning congestion and that storage largely substitutes for wider workload deferral.

0.30

Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal Shifting

eess.SY ·2026-09-29 ·Suntao Su, Liang Du, Shengyi Wang
similarity 0.67
Abstract · 5 pages, 5 figures, conference

The rapid growth of artificial intelligence (AI) data centers has introduced new challenges to power system operation. As their power demand becomes larger and more variable, quantitatively characterizing their demand flexibility is increasingly important for effective power system coordination. However, heterogeneous workload characteristics and resource requirements make this flexibility difficult to characterize directly. This paper proposes a framework for assessing the grid-compatible demand flexibility of AI data centers via batch workload temporal shifting. An averaging-based resource usage processing method is developed to map fine-resolution CPU, GPU and memory usage into unified time intervals compatible with power system operation. A workload temporal scheduling model is then formulated to shift batch workloads while preserving execution continuity, delay constraints, and server resource capacities, and is coupled with a utilization-dependent server power model to translate workload scheduling decisions into server power demand. Two complementary flexibility metrics are evaluated: short-term peak demand shaving and the maximum duration of sustained power reduction. Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.

0.13

Impact of Grid-Interactive Data Center Microgrids on Grid Reliability

eess.SY ·2026-11-11 ·Kiran Kumar Challa, Kumarsinh Jhala
hot direction similarity 0.66
Abstract · 5 Pages, 9 Figurs, Conference

Traditional data centers, operating as passive loads with standby backup resources, present significant challenges for grid integration due to their scale, rapid load fluctuations, and limited operational flexibility. This article investigates the transformative potential of grid-interactive data center microgrids, which integrate battery energy storage, on-site generation, and intelligent microgrid controllers to actively support both facility and grid operations. The proposed simulation framework enables the study comparing conventional and grid-interactive architectures under a range of steady-state and contingency scenarios. Results reveal that grid-interactive microgrids can substantially reduce peak grid demand, improve voltage stability, and improve system reliability especially when data center and system load peaks coincide. The findings highlight the critical role of coordinated resource management in enabling the reliable and efficient integration of large data center loads, and provide a practical methodology for assessing their system-level impacts.

0.26

A Theory of Probabilistic Power Provisioning for Data Centers with Distributed Energy Storage

cs.IT cs.DCcs.PFeess.SY ·2026-08-13 ·Can Emre Koksal, Richard A. Barry, Artun Sel
similarity 0.66
Abstract · 26 pages, 7 figures, 5 tables

The growing power demands and variability of AI workloads make electrical power delivery a critical constraint in data-center operation. Distributed energy storage can reduce the power capacity required to support stochastic loads, but its benefits depend fundamentally on the statistics and time scales of demand. This paper develops a probabilistic framework that jointly characterizes provisioned power, energy-storage capacity, and the probability of overdraw. We show that storage-assisted provisioning separates into two operating regimes. In the Small Battery Region, overdraw is dominated by short-lived demand excursions and storage provides nearly linear reductions in the required power margin. In the Large Battery Region, overdraw results from sustained demand fluctuations over longer spans of time, and the required margin exhibits diminishing returns with storage. For this regime we introduce effective power, an analogue of effective bandwidth that captures the temporal statistics of the demand and gives an asymptotically tight characterization of the required power. We further quantify how temporal correlation and spatial aggregation affect storage requirements and statistical multiplexing gains, and extend the analysis to loads with multiple demand time scales. Finally, we evaluate the framework using power-demand traces from three production data centers spanning HPC, GPU-training, and cloud-service workloads. Despite their heterogeneous, cyclo-stationary and multi-modal behavior, the measured workloads exhibit the predicted regimes, and a simple four-parameter two-state model captures the dynamics governing their storage-power tradeoffs. The resulting framework provides both a probabilistic foundation and practical dimensioning principles for storage-assisted power provisioning in next-generation AI data centers.

0.38

Feeder-Aware Service-Conditioned Flexibility of Grid-Interactive Buildings

eess.SY ·2026-10-22 ·Dafang Zhao, Ittetsu Taniguchi, Takao Onoye
similarity 0.66
Abstract

Grid-interactive buildings can adjust demand, but building-feasible power budgets may differ from accepted feeder-head offers. This study addresses a practical question: to what extent can the adjustable electricity consumption of buildings be translated into deliverable flexibility services while satisfying feeder-head operating requirements? To enable a fair comparison, we adopt the same baseline operating schedule, equipment conditions, and post-service recovery requirements for indoor temperature and battery state of charge (SOC). Flexibility is then evaluated under two settings: one considering only building-level constraints, and the other additionally accounting for feeder-head constraints. We first use a simplified network model with explicit security margins to determine a preliminary amount of flexibility that can be committed. The resulting schedule is then validated using a more detailed network simulation via Modelica. If network losses cause the actual response to deviate from the committed response, the electricity consumption of individual buildings is rescheduled. If the required response still cannot be achieved, the committed flexibility level is reduced. The experiments cover multiple service activation times, regulation directions, and service durations. For comparative purposes, we retain the initial optimization result as the reference estimate of the maximum potentially available flexibility, rather than interpreting the failure of a particular subsequent realization attempt as evidence that a larger flexibility level is inherently infeasible. The results demonstrated that 24.51\% of nonzero flexibility contracts were rejected due to feeder-head constraints, 67.04\% of contracts were accepted with some rescheduling and building redispatch, and only 8.09\% of contracts were accepted without any changes.

0.16

Beyond Scalar Flexibility: From Eligible AI Workloads to Dependable Load Relief

eess.SY cs.DC ·2026-09-04 ·Meiyi Li
similarity 0.65
Abstract · 20 pages, 18 figures, 5 tables. Code and derived data: https://doi.org/10.5281/zenodo.22308423

Grid studies often represent data-center flexibility as a fixed percentage of load, although no public production trace has shown how much eligible load persists across event durations or co-moves across clusters. We reconstruct 4,439 hourly power observations from a 185-day trace of 155,410 GPUs and derive a workload-semantic flexibility envelope. The fleet's time-averaged Monte Carlo median facility demand is 55.8 MW, while immediate eligible curtailment averages 3.55 MW after retaining allocated-GPU idle power: 12.1% of workload power and 6.35% of median facility power. Under full realization of that eligibility, 95%-available relief falls from 2.51 MW for one hour to 2.32 MW for four hours and 1.95 MW for 24 hours; a common realizable fraction q scales every value exactly by q. A mean-calibrated scalar overstates these quantities by 17%, 25%, and 47%, while a scalar tail-calibrated at four hours understates the one-hour product by 6% and overstates the 24-hour product by 17%; the share that reproduces the surface varies by a factor of 1.6 across durations and reliability levels. Aggregating 13 clusters raises four-hour firmness from 0.38 to 0.66, but cross-cluster covariance limits the gain. The production scheduler exposes almost no additional delay-based capacity: newly deferrable arrivals average 0.008 MW and have zero 95%-available capacity. These results replace an assumed flexibility percentage with duration, reliability, portfolio, and realizability terms that can be written into interconnection and demand-response contracts.

0.43