Beyond Scalar Flexibility: From Eligible AI Workloads to Dependable Load Relief

Meiyi Li

eess.SY cs.DC ·submitted 2026-09-04 17:52 UTC · v1

Abstract

Grid studies often represent data-center flexibility as a fixed percentage of load, although no public production trace has shown how much eligible load persists across event durations or co-moves across clusters. We reconstruct 4,439 hourly power observations from a 185-day trace of 155,410 GPUs and derive a workload-semantic flexibility envelope. The fleet's time-averaged Monte Carlo median facility demand is 55.8 MW, while immediate eligible curtailment averages 3.55 MW after retaining allocated-GPU idle power: 12.1% of workload power and 6.35% of median facility power. Under full realization of that eligibility, 95%-available relief falls from 2.51 MW for one hour to 2.32 MW for four hours and 1.95 MW for 24 hours; a common realizable fraction q scales every value exactly by q. A mean-calibrated scalar overstates these quantities by 17%, 25%, and 47%, while a scalar tail-calibrated at four hours understates the one-hour product by 6% and overstates the 24-hour product by 17%; the share that reproduces the surface varies by a factor of 1.6 across durations and reliability levels. Aggregating 13 clusters raises four-hour firmness from 0.38 to 0.66, but cross-cluster covariance limits the gain. The production scheduler exposes almost no additional delay-based capacity: newly deferrable arrivals average 0.008 MW and have zero 95%-available capacity. These results replace an assumed flexibility percentage with duration, reliability, portfolio, and realizability terms that can be written into interconnection and demand-response contracts.

Comment
20 pages, 18 figures, 5 tables. Code and derived data: https://doi.org/10.5281/zenodo.22308423

Closest papers

Nearest neighbours by meaning across the whole index.

Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal Shifting

eess.SY ·2026-09-29 ·Suntao Su, Liang Du, Shengyi Wang
similarity 0.71
Abstract · 5 pages, 5 figures, conference

The rapid growth of artificial intelligence (AI) data centers has introduced new challenges to power system operation. As their power demand becomes larger and more variable, quantitatively characterizing their demand flexibility is increasingly important for effective power system coordination. However, heterogeneous workload characteristics and resource requirements make this flexibility difficult to characterize directly. This paper proposes a framework for assessing the grid-compatible demand flexibility of AI data centers via batch workload temporal shifting. An averaging-based resource usage processing method is developed to map fine-resolution CPU, GPU and memory usage into unified time intervals compatible with power system operation. A workload temporal scheduling model is then formulated to shift batch workloads while preserving execution continuity, delay constraints, and server resource capacities, and is coupled with a utilization-dependent server power model to translate workload scheduling decisions into server power demand. Two complementary flexibility metrics are evaluated: short-term peak demand shaving and the maximum duration of sustained power reduction. Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.

0.13

Characterizing Job Power Elasticity for Power-Flexible AI Training

cs.AI ·2026-09-10 ·Philip Colangelo, Charles Dawson, Shayan Sengupta, Ayse Coskun, Varun Sivaram
similarity 0.70
Abstract

Large language model (LLM) training is among the fastest-growing sources of electricity demand in modern data centers, and power availability is a primary bottleneck to continued AI infrastructure growth. Making the power consumption of these workloads flexible could unlock additional power for AI growth, limit increases in electricity prices, and improve the utilization of existing grid infrastructure. However, to realize this flexibility, we must first understand how the performance of training workloads changes when GPU power is reduced. This paper presents the first systematic characterization of \emph{job power elasticity} (the sensitivity of throughput to power reductions) in LLM training. To quantify elasticity, we introduce the \emph{Power Flexibility Index (PFI)}, a normalized metric that quantifies the performance cost of power reductions and provides a control primitive for SLA-aware power flexibility. We collect data from 131 LLM training runs on H200 (plus 24 H200 validation runs and 34 matched H100 runs), including both dense and mixture-of-experts models, pretraining and fine-tuning tasks, and up to 32 GPUs. We find that LLM training jobs exhibit substantial but variable power elasticity, and we identify telemetry signals that predict PFI at runtime. Finally, we demonstrate that PFI-aware power allocation maximizes total tokens/second throughput under power constraints. Under a 30\% power reduction, PFI-aware power allocation recovers ~1.5k tokens/s per job, 63\% of the performance gap between an equal-weight allocation and an oracle with perfect information. Our results establish power elasticity as a measurable property of training jobs and provide a foundation for power-aware, grid-responsive AI infrastructure.

0.43

Mitigating the Grid Impact of Gigawatt-Scale AI Data Centers via High-Fidelity Model Flexibility

eess.SY math.OC ·2026-11-18 ·Eihab E. E. Ahmed, Saeed Manshadi
hot direction similarity 0.68
Abstract

Gigawatt-scale artificial intelligence data centers (AIDCs) are being connected at a single point of interconnection (POI) faster than transmission can be reinforced, yet studies of their flexibility rely on DC power flow and simplified load envelopes that omit voltage, cooling dynamics, and workload deadlines. This paper addresses this gap by embedding a high-fidelity AIDC model, with separate inference and training pools, hall thermal mass, PV, a battery energy storage system (BESS) with reactive capability, and a STATCOM, in a five-minute multi-period AC optimal power flow. Simulations on the RTS-GMLC test system show that active-power flexibility mitigates local price spikes and relieves congestion, whereas reactive support from the BESS inverter or a STATCOM is needed to keep the POI voltage away from sagging around its 0.95~pu limit. Sensitivity analyses show that cost-driven charging of large batteries can induce new morning congestion and that storage largely substitutes for wider workload deferral.

0.30

The Joule Point: an Energy-Optimal Operating Point for AI Inference

cs.PF ·2026-08-23 ·Alexander Apartsin, Yehudit Aperstein
similarity 0.67
Abstract · 18 pages, 6 pages

Data centers serving AI inference strive to maximize GPU utilization, running their cards at full power by default: this maximizes throughput and holds latencies down, but it is energy-inefficient, spending more energy per inference than the same work needs at a better operating point. That inefficiency is a scheduling choice, not a hardware limit. The cause is physical: for a given workload, a GPU's board power rises superlinearly along its power-performance curve, on top of a fixed power floor that is paid for as long as the job runs, so energy per inference is U-shaped in the operating point (GPU, power cap). The minimum, which we name the Joule Point, is a cap at 43 to 46 per cent of a large GPU's rated power; capping to it cuts energy per inference by roughly a quarter to a third at a modest cost in capital and latency: each request runs about 1.2 times slower, and holding aggregate throughput takes that same factor more cards. Under load, the Joule Point is nearly a per-card-type constant, so a single static cap per card type captures nearly all the saving (mean penalty under one per cent), turning the online per-job search that prior systems run into a one-time characterization. We ground this in ELF, a dense power-cap dataset that sweeps 20 inference models across four GPUs; replaying it in a fleet simulation under a power budget, capping each job to the least power meeting its deadline spends 18 to 45 per cent less energy per served job. These results recast data-center energy as a schedulable resource an operator can adapt to a budget, an electricity price, or a carbon signal while meeting its service targets.

0.41

Creating Power Flexibility in Datacenters via Query Routing

cs.AI ·2026-11-03 ·Shivam Patel, Bingqing Chen, Jared Fernandez, Guannan Qu, Gauri Joshi
similarity 0.65
Abstract

The growing energy requirements of large language model inference highlight the need for datacenters to support safe grid operation by providing power demand flexibility, while maintaining service for interactive workloads. This work investigates query routing as a mechanism to enable such capability by dynamically allocating queries across different language model instances without deferring requests. We develop a general analytical framework that connects query arrival rates and sequence length distributions to token iteration time, request residence time, serving capacity, and power consumption of model instances. Leveraging this framework, we characterize the feasible query routing allocations and the corresponding power demand flexibilities, enabling the selection of routing strategies to achieve desired power consumption behavior. We validate our framework across four GPU platforms on language models ranging from 1B to 70B parameters, obtaining 2.8% mean absolute percentage error in estimating achievable power flexibility. We evaluate our approach on a real trace-driven simulation of a 10,000 H100 GPUs datacenter, exhibiting flexibility up to 16% of total power consumption, with 90% of the desired power reduction achieved within approximately 10 seconds. These results establish query routing as an effective mechanism for datacenter power demand flexibility and demonstrate the broader applicability of our proposed framework to datacenter level planning and orchestration.

0.12

Capacity Credit of Data-Centre Flexibility: The Role of Workload Scheduling and Usable Battery Energy

eess.SY ·2026-11-17 ·Pengyu Ren, Wei Sun, Jiakai Wu, Yifan Wang
similarity 0.65
Abstract

Data centres that offer the same reduction in grid demand can make different contributions to supply adequacy. We estimate the effective load-carrying capability of workload scheduling and on-site batteries by matching expected unserved energy across paired simulations. Longer task deadlines increase capacity credit by giving operators more choice over when to defer and recover work. A fixed evening commitment shifts more work than deadline-based scheduling but delivers a smaller reduction in expected unserved energy. Protected backup reserves leave uninterruptible power supplies with limited capacity credit, while longer discharge durations raise the credit of dedicated batteries at the same response rating. These findings suggest assessing recovery deadlines and dispatchable energy alongside offered demand reductions.

0.20

Large-Scale Data Center Integration in Power Systems: Uncertainty and Multi-Scale Variation

eess.SY ·2026-10-09 ·Le Xie, Dongjoo Kim, Qian Zhang, Grant Ruan, Paul L. Joskow
published similarity 0.64
Abstract · Accepted for publication in Proceedings of the IEEE. Copyright 2026 IEEE. Personal use of this material is permitted. Permission from IEEE m…

Hyperscale artificial intelligence (AI) data centers are emerging as a structurally new class of electricity demand. Unlike conventional loads, they materialize as spatially concentrated, transmission-level point loads with rapid deployment timelines and converter-dominated dynamics. Their integration is governed by two defining properties: forecast uncertainty in load realization and multi-scale temporal variation spanning sub-seconds to planning horizons. We develop a unified framework that links reliability and affordability to these dimensions through a four-quadrant structure: (reliability, affordability) $\times$ (uncertainty, variation), which integrates probabilistic resource adequacy, generation and transmission expansion, operational security, and market design. Measured traces from a public generative-AI workload dataset show strongly tonal GPU power spectra rather than smooth broadband behavior: harmonic combs at the training-step cadence, and a distinct sub-second periodicity in inference. Across these traces the dominant variance band shifts with workload type (seconds for training and offline inference; tens of seconds and longer for online inference). We report this as a characterization of the measured workloads rather than a universal signature, and take it to indicate that such loads warrant a spectral description rather than a peak-demand one. These signatures directly affect reserve requirements, ramping products, voltage stability, ride-through performance, and harmonic interactions in converter-rich grids. Taken together, the analytical framework and empirical results establish a system-level basis for assessing the reliability and cost implications of large AI data center integration across planning and operational horizons.

0.27

Grid-Oriented Probabilistic Load Forecasting for AI Data Centers

eess.SY cs.LG ·2026-11-06 ·Qingyi Yao, Ding Lin, Tianqiao Zhao, Meng Yue, Jianhui Wang
benchmark similarity 0.63
Abstract

Probabilistic load forecasts for AI data centers need to represent both uncertainty under changing workloads and temporal dependence to support grid operations. This paper develops an open, grid-oriented benchmark using measured GPU power from a 448-GPU AI cluster. Forecasts are evaluated through four stages: probabilistic prediction, online uncertainty calibration, temporal scenario generation, and horizon-wide reserve sizing. Following a change in cluster utilization, a quantile LightGBM forecast achieves only 63.4% coverage for a nominal 90% interval, while online regime-conditioned calibration increases coverage to 87.3%. Even with well-calibrated marginal forecasts, independent sampling produces unrealistic ramp distributions and excessive reserve procurement. Reconstructing temporal dependence from historical forecast errors reduces the discrepancy in ramp statistics and lowers realized reserve cost by 7.4-10.6% across three forecasting tasks. These findings show that marginal forecast quality alone is insufficient for operational decisions and motivate joint evaluation of calibration, temporal structure, and decision outcomes.

0.22