Feeder-Aware Service-Conditioned Flexibility of Grid-Interactive Buildings

Dafang Zhao, Ittetsu Taniguchi, Takao Onoye

eess.SY ·submitted 2026-10-22 12:51 UTC · v1

Abstract

Grid-interactive buildings can adjust demand, but building-feasible power budgets may differ from accepted feeder-head offers. This study addresses a practical question: to what extent can the adjustable electricity consumption of buildings be translated into deliverable flexibility services while satisfying feeder-head operating requirements? To enable a fair comparison, we adopt the same baseline operating schedule, equipment conditions, and post-service recovery requirements for indoor temperature and battery state of charge (SOC). Flexibility is then evaluated under two settings: one considering only building-level constraints, and the other additionally accounting for feeder-head constraints. We first use a simplified network model with explicit security margins to determine a preliminary amount of flexibility that can be committed. The resulting schedule is then validated using a more detailed network simulation via Modelica. If network losses cause the actual response to deviate from the committed response, the electricity consumption of individual buildings is rescheduled. If the required response still cannot be achieved, the committed flexibility level is reduced. The experiments cover multiple service activation times, regulation directions, and service durations. For comparative purposes, we retain the initial optimization result as the reference estimate of the maximum potentially available flexibility, rather than interpreting the failure of a particular subsequent realization attempt as evidence that a larger flexibility level is inherently infeasible. The results demonstrated that 24.51\% of nonzero flexibility contracts were rejected due to feeder-head constraints, 67.04\% of contracts were accepted with some rescheduling and building redispatch, and only 8.09\% of contracts were accepted without any changes.

Closest papers

Nearest neighbours by meaning across the whole index.

Capacity Credit of Data-Centre Flexibility: The Role of Workload Scheduling and Usable Battery Energy

eess.SY ·2026-11-17 ·Pengyu Ren, Wei Sun, Jiakai Wu, Yifan Wang
similarity 0.66
Abstract

Data centres that offer the same reduction in grid demand can make different contributions to supply adequacy. We estimate the effective load-carrying capability of workload scheduling and on-site batteries by matching expected unserved energy across paired simulations. Longer task deadlines increase capacity credit by giving operators more choice over when to defer and recover work. A fixed evening commitment shifts more work than deadline-based scheduling but delivers a smaller reduction in expected unserved energy. Protected backup reserves leave uninterruptible power supplies with limited capacity credit, while longer discharge durations raise the credit of dedicated batteries at the same response rating. These findings suggest assessing recovery deadlines and dispatchable energy alongside offered demand reductions.

0.14

State-of-Charge Targets for Storage Participation in Two-Settlement Markets: Reliability, Price, and Compensation Impacts

eess.SY ·2026-11-13 ·Yichen Li, Alexandre Moreira, Ruiwei Jiang, Miguel Heleno, Julie Mulvaney-Kemp
hot direction similarity 0.66
Abstract

As energy storage assumes a larger role in electricity systems, market operation must coordinate its use across time to support reliability during periods of system stress. Minimum state-of-charge (SOC) targets provide a means of preserving energy for these periods, but their design shapes reliability, operating efficiency, and storage compensation. This paper evaluates alternative SOC target designs in a California-based day-ahead and real-time electricity market model. The comparison examines targets based on day-ahead schedules or rolling centralized dispatch, enforced at the individual-resource or system level, across seasons, stress conditions, and participant information settings. The results show that retaining more energy does not necessarily reduce load shedding: targets that restrict discharge can limit storage support during shortages. Under critical summer conditions, individual targets derived from rolling centralized dispatch reduce weekly load shedding by approximately 83--84\% relative to operation without targets. Lower RT clearing costs and average prices can coexist with higher storage compensation, reflecting the role of day-ahead positions and real-time deviations in determining settlement outcomes. These findings highlight the importance of coordinating energy retention with timely discharge and network deliverability when designing SOC requirements for storage participation in electricity markets.

0.25

Optimal Demand Response-Based Energy Management for Campus Buildings with Battery Energy Storage Systems: A Case Study of the ELB Building

eess.SY ·2026-10-14 ·Ali Beidoun, Quang Manh Hoang, Guilherme Vieira Hollweg, Van-Hai Bui
similarity 0.65
Abstract · 1-12

Buildings account for a significant portion of global electricity consumption, making demand response (DR) an effective strategy for reducing energy costs and improving grid flexibility. This paper presents an optimal energy management framework for a campus building that integrates demand response and battery energy storage systems (BESS) to minimize electricity costs while satisfying operational constraints and occupant comfort requirements. The proposed optimization model schedules building loads and battery charging/discharging based on time-varying electricity prices and building demand profiles. The framework is validated using the Engineering Laboratory Building (ELB) at the University of Michigan-Dearborn as a real-world case study. Four operating scenarios are investigated: (i) baseline operation, (ii) demand response without battery energy storage, (iii) battery energy storage, and (iv) demand response with battery energy storage. Simulation results demonstrate that demand alone reduces the building's electricity cost by approximately 12% compared with conventional operation. When battery energy storage is incorporated, the total electricity cost reduction increases to approximately 26%, highlighting the significant economic benefits of coordinated demand response and energy storage scheduling. The results demonstrate that integrating battery energy storage with demand response substantially enhances the operational flexibility of campus buildings and provides an effective solution for cost-effective and sustainable building energy management.

0.17

Converter-Aware Coordination of Computing Flexibility in Behind-the-Meter Data Centers

eess.SY ·2026-10-16 ·Ruolan Cui, Ruizhang Yang, Chenxi Hu, Franxis Yunhe Hou
similarity 0.63
Abstract

Data centers are emerging as large electricity consumers whose demand can be reshaped through workload scheduling. However, computing flexibility in behind-the-meter facilities does not automatically translate into electrically realizable power flexibility. Ignoring converter and network operating limits may cause converter overloads, protection trips, and interruptions to power supply and computing services. This paper proposes a converter-aware intraday scheduling methodology. First, a task-level mixed-integer linear formulation preserves synchronous training configurations and completion requirements, while Minkowski-sum aggregation and Shapley--Folkman convexification yield a linear inference-pool representation without unit-level binary variables. The latter admits a conditional relative relaxation-gap bound that decreases inversely with pool size. Second, a four-node electrical model links computing demand, on-site injections, and grid exchange to converter and network limits through lifted voltage variables and second-order cone relaxation. Finally, a mixed-integer model coordinates workloads, photovoltaic generation, energy storage, and grid purchases. Case studies show that electrical limits reshape scheduling and renewable utilization, while on-site resources reduce grid dependence. Under the studied conditions, fixed training cannot support full inference service within voltage limits, whereas coordinated scheduling achieves negligible inference shortage and passes verification against the original alternating-current model. These findings demonstrate the role of computing--electrical coordination in realizing the operational value of workload flexibility.

0.14

Impact of Wind-Solar-Battery Growth on Electricity Prices: Reserve Scarcity and Transmission Congestion

eess.SY ·2026-11-14 ·Haoxiang Wan, Ivan Castillo, Xingpeng Li
similarity 0.61
Abstract · 7 pages, 3 figures, 2 tables. Submitted to IEEE GECA 2027

This paper asks whether sequential wind, solar, and battery storage additions that eliminate unserved energy also remove modeled reserve scarcity and transmission congestion. Thirty-one cumulative portfolio states are evaluated on a modified IEEE 24-bus system for a constructed stressed day using a 24-hour day-ahead unit commitment model with network constraints, co-optimized energy and upward reserve, chronological battery storage, and an approximation of the Electric Reliability Council of Texas operating reserve demand curve. The thermal baseline has 106 MWh of unserved energy, whereas 450 MW of wind is sufficient to serve all demand. However, with 1,500 MW of wind, the hourly modeled reserve scarcity price still reaches \$5,000/MWh because wind output declines after the system peak. Adding 1,800 MW of solar reduces the load weighted daily average modeled reserve scarcity price from \$1,136.2/MWh to \$101.2/MWh and confines modeled reserve scarcity to three evening hours. Adding 250 MW/1,000 MWh of battery storage further lowers the average to \$4.3/MWh and reduces wind curtailment from 631 MWh to 306 MWh. Transmission congestion nevertheless remains: all residual wind curtailment occurs at bus 21, wind capture prices at buses 21 and 23 differ by \$31.8/MWh, and identical battery storage plants yield normalized net energy market revenues of \$201/(MW$\cdot$day) and \$121/(MW$\cdot$day) at buses 19 and 21, respectively. These results show that unserved energy, modeled reserve scarcity, and locational congestion effects measure distinct operating conditions and should be evaluated separately but interpreted together.

0.35

Optimal Coordination of Multiple Ancillary Service Provisions in Active Distribution Networks

eess.SY ·2026-11-14 ·Xinbao Jia, Yi Guo, Ognjen Stanojev, Zhen Chen, Yuning Jiang +1 more
similarity 0.61
Abstract · 16 pages

We propose a multi-rate model predictive control (MPC) framework for coordinating primary frequency control (PFC), automatic generation control (AGC), and voltage control (VC) in active distribution networks. The framework allocates distributed energy resource (DER) flexibility among these three ancillary services while retaining their different update rates. To account for the intertemporal flexibility of electric vehicle aggregations and aggregations of buildings with thermostatically controlled loads (TCLs), we incorporate time-varying power-energy envelopes into our multi-rate MPC formulation. These constraints couple the combined PFC and AGC response to the demand-side flexibility available later in the prediction horizon. Furthermore, the input-multirate structure enables coordinated ancillary service provision by DERs with different response dynamics. The controller optimizes the three services together, allowing fast regulation to be coordinated with the developing slow response within the available DER flexibility. We demonstrate the coordinated provision of the three ancillary services through closed-loop simulations on a modified IEEE 33-bus system using a nonlinear differential-algebraic model.

0.32

Minimizing Grid Interconnection Capacity Requirements for AI Data Centers: A Developer-Side Planning Framework with Onsite Resources and Workload Flexibility

eess.SY ·2026-08-29 ·Hassan Zahid Butt, Rida Fatima, Xingpeng Li
similarity 0.61
Abstract

Securing grid interconnection capacity has become a bottleneck for AI data center projects and can take longer than constructing the facilities themselves. This mismatch can delay deployment for years, making early interconnection planning essential. This paper develops ICP-AI, an interconnection capacity planning framework from a data center developer's perspective. The framework minimizes grid import capacity under a prescribed onsite investment budget while jointly sizing photovoltaic (PV) and battery energy storage system (BESS) resources and scheduling deadline constrained workload flexibility. A secondary refinement fixes the minimum grid capacity and selects the minimum-investment PV-BESS portfolio among solutions that achieve that capacity. The framework is evaluated using monthly composite stress profiles across varying temporal assumptions, load shapes, flexible load fractions, and deferral windows. Results show that interconnection capacity reduction depends strongly on the planning environment: at a $100M budget, it is about 6% for the high load factor baseline, exceeds 10% under monthly average solar availability, and reaches 13.3% for a more diurnal load. At a $10M budget, 5% flexible load with a 1 h workload deferral window reduces BESS capacity from 15.30 to 4.87 MWh while increasing capacity reduction from 4.43% to 4.84%. To test sensitivity to temporal compression, the model is also solved over the full 8,760 h chronology, which preserves the main capacity and flexibility trends. Overall, ICP-AI quantifies the interconnection capacity and infrastructure substitution value of workload flexibility, providing an investment-interconnection frontier to support capital allocation and early project planning in constrained grid environments.

0.12

Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility

eess.SY ·2026-10-04 ·Rida Fatima, Xingpeng Li
similarity 0.61
Abstract

The rapid growth of AI data centers is creating concentrated electricity demands that can exceed available distribution network headroom and delay interconnection. This paper investigates whether capacity can be used effectively by coordinating flexibility on both sides of the interconnection. A day-ahead mixed integer second order cone programming framework maximizes feasible AI data center IT capacity using utility side conservation voltage reduction and network topology reconfiguration, together with data center workload shifting and reserve constrained uninterruptible power supply storage. Background feeder demand uses voltage dependent ZIP models, while the data center is modeled as constant power demand using Training, Inference, and Mixed workload profiles. A two-stage solution first maximizes interconnection capacity and then minimizes feeder losses for the retained capacity, with numerical relaxation screening. Studies on a 116-bus model derived from the IEEE 123-node feeder show that, at the constrained bus-60 connection point, grid side flexibility, driven almost entirely by network reconfiguration, increases feasible IT capacity by approximately 42.5-45.0%, while data center flexibility alone provides approximately 2.1-5.4% gains. Coordinated operation increases feasible IT capacity from approximately 10.5-10.6 MW under BASE operation to 15.3-16.0 MW, corresponding to gains of approximately 45.9-50.8%; the 16.0 MW Inference result is limited by the adopted UPS reserve requirement. Benefits are strongly location dependent and influenced by workload flexibility, deferral duration, PUE, UPS energy and reserve requirements, and feeder loading. Under a combined adverse operating condition, FULL capacity decreases by only 3.4% relative to the nominal Mixed case while retaining substantial additional capacity over BASE.

0.08