Abstract

Artificial-intelligence data centers (AIDCs) can provide spatiotemporal load flexibility by migrating training workloads in response to regional electricity prices and renewable-energy (RE) availability. However, transfer-blind scheduling may overestimate migration benefits by overlooking transfer time or prevent training from resuming within renewable-rich or low-price windows when considering transfer time. This paper proposes a transfer-aware compute-electricity-network scheduling framework that coordinates training placement, checkpoint transmission, and optical circuit switching (OCS) to improve local RE utilization and reduce grid-purchase cost. A compact compute-electricity master problem generates candidate schedules using estimated transfer delays. The framework then schedules optical circuits, verifies checkpoint delivery under shared-link capacity constraints, and revises infeasible schedules using updated delay estimates. It integrates day-ahead planning, event-triggered intraday updates, and real-time dispatch. In a five-AIDC benchmark with equal completed work and network resources, the proposed method reduces the real-time grid purchase cost by 12.50% and increases the local RE utilization by 2.724 percentage points relative to static optical operation. Sensitivity and ablation analyses indicate that OCS is particularly beneficial when renewable-rich or low-price windows shift across sites and network bottlenecks hinder timely checkpoint delivery.

Comment
10 pages, 12 figures

Closest papers

Nearest neighbours by meaning across the whole index.

Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal Shifting

eess.SY ·2026-09-29 ·Suntao Su, Liang Du, Shengyi Wang
similarity 0.69
Abstract · 5 pages, 5 figures, conference

The rapid growth of artificial intelligence (AI) data centers has introduced new challenges to power system operation. As their power demand becomes larger and more variable, quantitatively characterizing their demand flexibility is increasingly important for effective power system coordination. However, heterogeneous workload characteristics and resource requirements make this flexibility difficult to characterize directly. This paper proposes a framework for assessing the grid-compatible demand flexibility of AI data centers via batch workload temporal shifting. An averaging-based resource usage processing method is developed to map fine-resolution CPU, GPU and memory usage into unified time intervals compatible with power system operation. A workload temporal scheduling model is then formulated to shift batch workloads while preserving execution continuity, delay constraints, and server resource capacities, and is coupled with a utilization-dependent server power model to translate workload scheduling decisions into server power demand. Two complementary flexibility metrics are evaluated: short-term peak demand shaving and the maximum duration of sustained power reduction. Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.

0.13

Flux: Optimal Scheduling of Optical Circuit Switches for LLM Training

cs.NI cs.DC ·2026-09-22 ·Arno Troch, Seyyidahmed Lahmer, Abubakr Nada, Jeroen Famaey, Michael Peeters
position similarity 0.67
Abstract

Optical Circuit Switching (OCS) offers high bandwidth density and energy efficiency for LLM training, but incurs a non-negligible reconfiguration delay. Prior work typically schedules optical circuit switches independently of compute, using aggregate traffic demand to determine which circuits to provision and when. We argue that this separation creates a fundamental inefficiency: reconfigurations that ignore the compute timeline can stall communication, resulting in low circuit utilization and large buffer requirements. In this paper, we present Flux, a scheduler that optimally schedules optical circuit switches based on the structure of the entire workload. Flux remains effective across a wide range of switching speeds by reusing circuits and amortizing reconfiguration delay behind compute and communication. We show that Flux reduces training iteration time by up to $10\times$ and peak NIC buffer requirements by more than three orders of magnitude compared to traditional periodic schedulers.

0.38

Optimal Operation Method for Computing Power-Electric Power Coordination Considering End-to-End Completion Latency of Computing Tasks

eess.SY ·2026-09-22 ·Yize Liu, Mingyu Yan, Jianfeng Wen, Meng Song, Qing Yang +1 more
similarity 0.65
Abstract · 10 pages, 7 figures, 4 tables. Submitted to Proceedings of the CSEE. This is a bilingual manuscript. The English version appears first, foll…

With the rapid growth of computing demand and the large-scale integration of renewable energy, how to realize the coordinated optimal operation of computing networks and power networks has become an important issue to be addressed. However, existing studies mainly focus on the impacts of spatiotemporal migration of computing loads on power system operation, while the internal task processing procedures of computing networks are largely neglected. To address this issue, this paper proposes an optimal operation method for computing power-electric power coordination considering the end-to-end completion latency of computing tasks. First, a full-process latency model covering the "transmission-buffering-computation" procedure of computing tasks is established, which uniformly characterizes forwarding waiting, network transmission, queueing, and computation processing. Second, a task-level spatiotemporal scheduling mechanism is developed to jointly optimize the task forwarding time, routing path, and destination computing node. Then, a computing power-electric power coordinated optimization model is formulated to minimize the power supply cost of the power network and the total completion latency of computing tasks. Case studies demonstrate that the proposed method can fully exploit the task-level spatiotemporal scheduling flexibility of computing loads and facilitate the spatiotemporal matching between computing loads and renewable energy, thereby reducing the system power supply cost while ensuring the quality of service for computing tasks.

0.22

QPS-ToR: A Parallel Iterative Switching Algorithm for Reconfigurable Optical Datacenter Switching

cs.NI ·2026-09-08 ·Dongzhao Song, Qianru Yu, Jun Xu
similarity 0.64
Abstract

Reconfigurable optical data center networks (RODCNs) have emerged as a promising solution for scaling DCN capacity, yet their scheduling mechanisms remain a performance bottleneck: traffic-oblivious schemes inherently limit throughput, while the state-of-the-art traffic-aware scheme, NegotiaToR, uses single-iteration iSLIP as its scheduling engine, which limits throughput to around 60% and treats all source-destination pairs with equal priority regardless of queue length. We propose QPS-ToR, which replaces NegotiaToR's scheduling logic with SW-QPS, a sliding-window algorithm originally proposed for crossbar scheduling that achieves around 90% throughput with a single low-complexity iteration. QPS-ToR operates within NegotiaToR's existing workflow, requiring only a revision of the scheduling cycle from three-step Request-Grant-Accept (RGA) to two-step Request-Grant (RG) with a sliding window mechanism. In flow-level simulations with 128 ToRs under realistic datacenter workloads, QPS-ToR achieves up to 36% higher throughput and 82% lower flow completion time (FCT) compared to NegotiaToR, and consistently outperforms RotorNet, a representative traffic-oblivious scheme, on the parallel network topology.

0.18

Minimizing Grid Interconnection Capacity Requirements for AI Data Centers: A Developer-Side Planning Framework with Onsite Resources and Workload Flexibility

eess.SY ·2026-08-29 ·Hassan Zahid Butt, Rida Fatima, Xingpeng Li
similarity 0.63
Abstract

Securing grid interconnection capacity has become a bottleneck for AI data center projects and can take longer than constructing the facilities themselves. This mismatch can delay deployment for years, making early interconnection planning essential. This paper develops ICP-AI, an interconnection capacity planning framework from a data center developer's perspective. The framework minimizes grid import capacity under a prescribed onsite investment budget while jointly sizing photovoltaic (PV) and battery energy storage system (BESS) resources and scheduling deadline constrained workload flexibility. A secondary refinement fixes the minimum grid capacity and selects the minimum-investment PV-BESS portfolio among solutions that achieve that capacity. The framework is evaluated using monthly composite stress profiles across varying temporal assumptions, load shapes, flexible load fractions, and deferral windows. Results show that interconnection capacity reduction depends strongly on the planning environment: at a $100M budget, it is about 6% for the high load factor baseline, exceeds 10% under monthly average solar availability, and reaches 13.3% for a more diurnal load. At a $10M budget, 5% flexible load with a 1 h workload deferral window reduces BESS capacity from 15.30 to 4.87 MWh while increasing capacity reduction from 4.43% to 4.84%. To test sensitivity to temporal compression, the model is also solved over the full 8,760 h chronology, which preserves the main capacity and flexibility trends. Overall, ICP-AI quantifies the interconnection capacity and infrastructure substitution value of workload flexibility, providing an investment-interconnection frontier to support capital allocation and early project planning in constrained grid environments.

0.12

Decision-Focused Learning via Neural Optimization Layers for Battery-Assisted Grid-Import Smoothing in AI Data Centers

eess.SY cs.LGmath.OC ·2026-11-10 ·Xinda Zheng, Canchen Jiang, Frits de Nijs, Edward Lam, Markus Wagner
similarity 0.62
Abstract

Rapid AI data-center power fluctuations challenge grid integration. Sustained grid-import smoothing requires allocating limited battery power and energy under uncertain demand. We formulate risk-aware BESS scheduling that coordinates advance reserve commitments and demand-responsive dispatch, accounting for operating costs, grid-ramp penalties, and their conditional value-at-risk. We develop battery scheduling decision-focused learning (BS-DFL) with a constraint-aware neural optimization layer trained directly from this objective without optimal-solution labels. The trained layer is then frozen to guide demand-predictor learning through scheduling costs and ramping risk, enabling solver-free rolling-horizon scheduling. In a 10,000-minute simulation using loads derived from measured AI workloads, BS-DFL reduces mean absolute minute-to-minute grid-import changes by 71.70% and total scheduling cost by 18.01% relative to an MSE-trained predictor coupled with a mixed-integer linear programming solver, with an average decision time of 18.77 ms.

0.26

A Smallest-Need-First Job Scheduling Framework with Adaptive Optimization of Idle Node Counts for Energy-Efficient HPC Systems

cs.DC ·2026-08-30 ·Reza Pulungan, Raka Satya Prasasta, Santana Yuda Pradata, Mursalim, Hiroyuki Takizawa +1 more
similarity 0.62
Abstract · 18 pages, 10 figures

Power-state management in high-performance computing (HPC) clusters must reduce idle energy without excessive wake-up delays for rigid parallel jobs. This paper presents SNF-ICON, an event-driven controller combining smallest-need-first (SNF) gang scheduling, predictive wake timing, and adaptive warm-spare control. At each scheduler invocation, recent interarrival and completed-service samples are screened for sufficiency, exponential-like variability, low lag-one autocorrelation, and acceptable Kolmogorov-Smirnov distance. Rejected or data-sparse windows use SNF+IPM (Intelligent Power Manager), whereas accepted windows activate release prediction and an exponential next-event model. Warm-spare optimization is applied only when queue, event, and arrival-recency conditions permit, balancing estimated waiting and non-compute energy over a timeout-capped horizon. We evaluate four DAS2 trace segments and a generated Markovian workload on AOBA-derived 64-node models, plus SDSC Blue on an AOBA-derived 1152-node model. SNF-ICON is compared with SNF+IPM and First Come First Served (FCFS) + backfilling with IPM. It reduces average waiting time relative to the FCFS-based baseline in all six cases and remains close to at least one heuristic energy baseline in five. The generated workload spends substantial time in ICON mode, whereas DAS2 workloads operate mainly in fallback. Furthermore, cross-platform results show strong dependence on node-transition and power models. Thus, no single policy or parameter set works best in every case.

0.27

Opportunistic Optical Link Scheduling in the Scalable Matching Model

cs.NI ·2026-10-27 ·Marcos T. Henriques, Olga Goussevskaia
similarity 0.62
Abstract

The Scalable Matching Model (SMM) is a useful abstraction for reconfigurable datacenter networks. In SMM, a set of $n$ (Top-of-Rack) electrical packet switches is connected via a set of optical circuit switches (OCS), each realizing a $p \times p$ matching, where $p$ is the number of ports per switch. In the case when $p \ll n$, bounded-degree networks utilize only a small portion of the OCS infrastructure at each point in time, especially when traffic patterns are skewed and bursty. In this work, we propose the Opportunistic Optical Link Scheduling (OOLS), a set of lightweight OCS link scheduling routines, designed to augment bounded-degree reconfigurable network topologies by leveraging idle OCS resources. We evaluate the performance of OOLS in the SMM through simulations, using synthetic and real-world data-center workloads. Our simulation results show that OOLS substantially improves performance, lowering communication costs and boosting throughput.