Optimal Operation Method for Computing Power-Electric Power Coordination Considering End-to-End Completion Latency of Computing Tasks

Yize Liu, Mingyu Yan, Jianfeng Wen, Meng Song, Qing Yang, Mariusz Malinowski

eess.SY ·submitted 2026-09-22 02:37 UTC · v1

Abstract

With the rapid growth of computing demand and the large-scale integration of renewable energy, how to realize the coordinated optimal operation of computing networks and power networks has become an important issue to be addressed. However, existing studies mainly focus on the impacts of spatiotemporal migration of computing loads on power system operation, while the internal task processing procedures of computing networks are largely neglected. To address this issue, this paper proposes an optimal operation method for computing power-electric power coordination considering the end-to-end completion latency of computing tasks. First, a full-process latency model covering the "transmission-buffering-computation" procedure of computing tasks is established, which uniformly characterizes forwarding waiting, network transmission, queueing, and computation processing. Second, a task-level spatiotemporal scheduling mechanism is developed to jointly optimize the task forwarding time, routing path, and destination computing node. Then, a computing power-electric power coordinated optimization model is formulated to minimize the power supply cost of the power network and the total completion latency of computing tasks. Case studies demonstrate that the proposed method can fully exploit the task-level spatiotemporal scheduling flexibility of computing loads and facilitate the spatiotemporal matching between computing loads and renewable energy, thereby reducing the system power supply cost while ensuring the quality of service for computing tasks.

Comment
10 pages, 7 figures, 4 tables. Submitted to Proceedings of the CSEE. This is a bilingual manuscript. The English version appears first, followed by the Chinese version

Closest papers

Nearest neighbours by meaning across the whole index.

Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal Shifting

eess.SY ·2026-09-29 ·Suntao Su, Liang Du, Shengyi Wang
similarity 0.68
Abstract · 5 pages, 5 figures, conference

The rapid growth of artificial intelligence (AI) data centers has introduced new challenges to power system operation. As their power demand becomes larger and more variable, quantitatively characterizing their demand flexibility is increasingly important for effective power system coordination. However, heterogeneous workload characteristics and resource requirements make this flexibility difficult to characterize directly. This paper proposes a framework for assessing the grid-compatible demand flexibility of AI data centers via batch workload temporal shifting. An averaging-based resource usage processing method is developed to map fine-resolution CPU, GPU and memory usage into unified time intervals compatible with power system operation. A workload temporal scheduling model is then formulated to shift batch workloads while preserving execution continuity, delay constraints, and server resource capacities, and is coupled with a utilization-dependent server power model to translate workload scheduling decisions into server power demand. Two complementary flexibility metrics are evaluated: short-term peak demand shaving and the maximum duration of sustained power reduction. Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.

0.13

AI Inference-Aware Optimal Power Flow: Converting Token Requirements into Grid Flexibility

eess.SY ·2026-11-14 ·Qianyi Ma, Dawei Qiu, Xiao Liu
similarity 0.67
Abstract

The rapid growth, temporal variability, and geographic concentration of electricity demand from artificial intelligence (AI) inference can aggravate transmission congestion near data centers (DCs). The spatial and temporal flexibility of inference workloads offers an opportunity to alleviate this congestion: requests can be routed across DCs or deferred within users' quality-of-service (QoS) requirements. However, inference routing primarily considers graphics processing unit (GPU) availability, leaving this flexibility underused in grid operation. Using GPU measurements, this paper models inference latency and DC power consumption to quantify the flexibility available under users' time-to-first-token (TTFT) and inter-token latency (ITL) requirements. These models are then incorporated into an AI inference-aware optimal power flow (OPF) that coordinates inference routing and power system operation among DC operators, the transmission system operator, and inference users. By linking user requests, token generation at DCs, and electricity delivery through the transmission network, the formulation schedules inference workloads subject to both users' QoS requirements and transmission constraints. Simulations on the PJM system show that, compared with computing-based routing and with electricity price-based routing, coordinating inference routing with network operation enables growing DC electricity demand deliverable to be met at lower cost.

0.20

Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation

eess.SY math.OC ·2026-11-06 ·Wei Wang, Himanshu Sharma, Thiagarajan Ramachandran
similarity 0.66
Abstract

Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load fluctuations through reserved active power with zero net state-of-charge change, and (iii) voltage support via reactive power capability at the point of common coupling. Minute-level operational scheduling enforces state-of-charge feasibility and load ramp constraints, and incorporates a controllable queue of delay-insensitive computing tasks to enhance flexibility. A case study using a real data center load profile demonstrates the proposed method and quantifies the BESS power-energy requirements and operational trade-offs needed to satisfy the multi-service constraints, providing practical guidance for interconnection planning and deployment.

0.05

Capturing Electrical Windows Through Reconfigurable Optical Networks: Transfer-aware Scheduling of Multi-Region AI Data Centers

cs.DC ·2026-10-09 ·Xi Tong, Zijian Li, Xiaoyi Fan, Cong Zhang, Ershun Du +1 more
benchmark similarity 0.65
Abstract · 10 pages, 12 figures

Artificial-intelligence data centers (AIDCs) can provide spatiotemporal load flexibility by migrating training workloads in response to regional electricity prices and renewable-energy (RE) availability. However, transfer-blind scheduling may overestimate migration benefits by overlooking transfer time or prevent training from resuming within renewable-rich or low-price windows when considering transfer time. This paper proposes a transfer-aware compute-electricity-network scheduling framework that coordinates training placement, checkpoint transmission, and optical circuit switching (OCS) to improve local RE utilization and reduce grid-purchase cost. A compact compute-electricity master problem generates candidate schedules using estimated transfer delays. The framework then schedules optical circuits, verifies checkpoint delivery under shared-link capacity constraints, and revises infeasible schedules using updated delay estimates. It integrates day-ahead planning, event-triggered intraday updates, and real-time dispatch. In a five-AIDC benchmark with equal completed work and network resources, the proposed method reduces the real-time grid purchase cost by 12.50% and increases the local RE utilization by 2.724 percentage points relative to static optical operation. Sensitivity and ablation analyses indicate that OCS is particularly beneficial when renewable-rich or low-price windows shift across sites and network bottlenecks hinder timely checkpoint delivery.

0.20

Real-Time Operation Strategy of Virtual Power Plants With Optimal Power Disaggregation Among Heterogeneous Resources

eess.SY ·2026-08-27 ·Qixin Chen, Ruike Lyu, Hongye Guo, Xiangbo Su
publishedhot directionhighly cited similarity 0.62
Abstract · Accepted by Applied Energy

The virtual power plant (VPP) can aggregate flexible resources on the demand side to provide frequency regulation for the grid, helping address the supply-demand balance challenges. When deploying regulation, the VPP disaggregates the requested power adjustment in real time among its internal heterogeneous resources. Achieving optimal power disaggregation in this process is challenging due to the temporal coupling characteristics of the resources, the uncertain regulation signals, and the requirement for fast response. Therefore, existing research relies on heuristic methods, such as proportional disaggregation, and fails to leverage the heterogeneity of multiple resources. Here, we propose an optimal operation strategy for VPPs to provide regulation, exploiting the complementary characteristics of heterogeneous resources by prioritizing the use of low-cost resources while considering temporal coupling. To reduce the computational overhead of online deployment, we further propose a fast disaggregation algorithm to eliminate the reliance on optimisation solvers. We conducted case studies on the operation of a VPP composed of resources including thermostatically controlled loads and industrial production processes. The results verified the reduced operation cost and increased profit of the VPP under the proposed strategy, with only milliseconds of online computation time. We believe that our work can help better exploit demand-side flexibility.

0.62

Quantifying the hosting capacity value of workload flexibility for AI data centers: A two-stage electricity-computation co-optimization framework

eess.SY ·2026-11-18 ·Jiakai Wu, Wei Sun, Pengyu Ren, Yifan Wang
hot direction similarity 0.62
Abstract

Grid connection constraints increasingly limit the expansion of AI data centers, yet the additional hosting capacity enabled by computational workload flexibility remains insufficiently quantified. This paper develops a two-stage electricity--computation co-optimization framework to quantify the individual and coordinated hosting capacity values of spatial and temporal workload flexibility. Data center capacities are determined endogenously, with computational task arrivals scaling with admitted capacity. Spatial routing of eligible interactive requests and temporal deferral of batch workloads are linked to server operation and facility power demand, subject to workload completion requirements and transmission constraints. The first stage maximizes aggregate hosting capacity; the second fixes the resulting site capacities and optimizes annual workload scheduling and generation dispatch to minimize generation and carbon costs. An 8760-hour case study with three data centers on a modified IEEE 118-bus system shows that temporal and spatial flexibility individually increase hosting capacity by 21.26\% and 5.37\%, respectively. Their coordinated use raises hosting capacity from 4635.1~MW to 6231.5~MW, a 34.44\% increase without network reinforcement. The coordinated gain exceeds the sum of the individual gains by 361.9~MW, demonstrating complementarity between spatial migration and temporal deferral. By redistributing computational demand across locations and operating hours, these mechanisms enable fuller utilization of existing transmission capacity. The findings establish workload flexibility as a quantifiable planning resource for accommodating additional data center capacity within existing transmission networks.

0.28

Spatial LLM Workload Shifting Needs Foresight: Model Commitment for AI Data Center Operation under Power Grid Constraints

eess.SY ·2026-09-09 ·Bojun Du, Hongyang Jia, Tonghui Li, Qingchun Hou, Ze Wang +2 more
similarity 0.61
Abstract · 3 pages, 2 figures

AI data centers may face power supply shortages during certain periods, requiring operators to shift large language model (LLM) inference workloads spatially to maintain service rates. However, existing workload-shifting methods typically assume that any data center with sufficient computing resources can immediately serve shifted requests, which may lead to infeasible transfers and unserved demand. This letter proposes model commitment (MC), a mixed-integer linear programming framework that jointly schedules model deployment and cross-site request routing under power constraints and electricity-price signals. First, MC formulates the intertemporal coupling introduced by model replica loading. Second, it translates prefill and decode latency requirements into the amount of demand that each replica can serve. Case studies based on real-world data show that MC enables AI data center operators to achieve a 100% service rate under time-varying grid conditions and reduce total operating cost by 29.0%.

0.44

Converter-Aware Coordination of Computing Flexibility in Behind-the-Meter Data Centers

eess.SY ·2026-10-16 ·Ruolan Cui, Ruizhang Yang, Chenxi Hu, Franxis Yunhe Hou
similarity 0.61
Abstract

Data centers are emerging as large electricity consumers whose demand can be reshaped through workload scheduling. However, computing flexibility in behind-the-meter facilities does not automatically translate into electrically realizable power flexibility. Ignoring converter and network operating limits may cause converter overloads, protection trips, and interruptions to power supply and computing services. This paper proposes a converter-aware intraday scheduling methodology. First, a task-level mixed-integer linear formulation preserves synchronous training configurations and completion requirements, while Minkowski-sum aggregation and Shapley--Folkman convexification yield a linear inference-pool representation without unit-level binary variables. The latter admits a conditional relative relaxation-gap bound that decreases inversely with pool size. Second, a four-node electrical model links computing demand, on-site injections, and grid exchange to converter and network limits through lifted voltage variables and second-order cone relaxation. Finally, a mixed-integer model coordinates workloads, photovoltaic generation, energy storage, and grid purchases. Case studies show that electrical limits reshape scheduling and renewable utilization, while on-site resources reduce grid dependence. Under the studied conditions, fixed training cannot support full inference service within voltage limits, whereas coordinated scheduling achieves negligible inference shortage and passes verification against the original alternating-current model. These findings demonstrate the role of computing--electrical coordination in realizing the operational value of workload flexibility.