CS Paper Radar

Real-Time Operation Strategy of Virtual Power Plants With Optimal Power Disaggregation Among Heterogeneous Resources

Qixin Chen, Ruike Lyu, Hongye Guo, Xiangbo Su

eess.SY ·submitted 2026-08-27 00:20 UTC · v1
publishedhot directionhighly cited

Abstract

The virtual power plant (VPP) can aggregate flexible resources on the demand side to provide frequency regulation for the grid, helping address the supply-demand balance challenges. When deploying regulation, the VPP disaggregates the requested power adjustment in real time among its internal heterogeneous resources. Achieving optimal power disaggregation in this process is challenging due to the temporal coupling characteristics of the resources, the uncertain regulation signals, and the requirement for fast response. Therefore, existing research relies on heuristic methods, such as proportional disaggregation, and fails to leverage the heterogeneity of multiple resources. Here, we propose an optimal operation strategy for VPPs to provide regulation, exploiting the complementary characteristics of heterogeneous resources by prioritizing the use of low-cost resources while considering temporal coupling. To reduce the computational overhead of online deployment, we further propose a fast disaggregation algorithm to eliminate the reliance on optimisation solvers. We conducted case studies on the operation of a VPP composed of resources including thermostatically controlled loads and industrial production processes. The results verified the reduced operation cost and increased profit of the VPP under the proposed strategy, with only milliseconds of online computation time. We believe that our work can help better exploit demand-side flexibility.

Comment
Accepted by Applied Energy
DOI
10.1016/j.apenergy.2024.122876

Closest papers

Nearest neighbours by meaning across the whole index.

Approximating Energy-Regulation Feasible Region of Virtual Power Plants: A Data-driven Inverse Optimization Approach

eess.SY math.OC ·2026-08-26 ·Ruike Lyu, Hongye Guo, Qixin Chen
publishedhighly cited similarity 0.68
Abstract · Published in: 2024 IEEE Power & Energy Society General Meeting (PESGM)

System operators will probably allow virtual power plants (VPPs) to submit their feasible region (FR) for market clearing and dispatch. A VPP needs to determine its FR to submit as a whole based on the individual operation model of its internal distributed energy resources (DERs), which is an FR aggregation problem. Existing FR aggregation approaches rely on analytical methods, which have issues with generality and adaptability. In this paper, we propose a data-driven approach to approximate the energy-regulation FR of VPPs. It adopts the virtual battery model to approximate the aggregate FR of a VPP and determines the model parameters through inverse optimization based on generated multi-scenario operation data using the original operation model. Numerical tests verified the accuracy of the proposed method. We believe that our work helps to better leverage the flexibility of DERs.

0.63

Resource-Aware Rolling-Horizon Controller for Renewable-Based Virtual Power Plants Providing Automatic Frequency Restoration Reserves

eess.SY ·2026-09-25 ·Marco Vinicio Avendaño-Caiza, Juan Diego Rios-Peñaloza, Javier Roldán-Pérez, José Luis Rodríguez-Amenedo, Milan Prodanovic
similarity 0.67
Abstract · Submitted to a scientific journal for possible publication. 10 pages, 11 figures

Virtual power plants (VPPs) are an effective solution for increasing the penetration of renewable energy sources (RES) in power systems. Moreover, VPPs can provide ancillary services if generators and loads are closely connected and properly coordinated. This aspect has been addressed in several studies, yet they mostly focus on the dispatch optimisation level, leaving real-time operation aspects unresolved. To close this gap, a central controller for VPPs based on a rolling-horizon optimisation is proposed in this work. Its main objective is to maximise revenues while delivering frequency restoration services. A day-ahead optimisation firstly defines the power setpoint and the upward and downward reserves of the VPP. Then, the rolling-horizon optimiser, executed every minute, distributes the power and reserve references between the VPP units to achieve their close tracking while taking into account resource availability (wind speed, irradiance, etc.), operational constraints and battery degradation. The effectiveness of the controller is tested using a two-area interconnected power system under different RES generation and demand profiles. The simulations are performed in MATLAB/Simulink and include detailed dynamic models of the VPP elements, demonstrating the applicability of the algorithm to real systems. The day-ahead and the rolling-horizon optimisation problems are modelled using YALMIP and solved using Gurobi. The obtained results demonstrate the VPP supporting grid frequency restoration by optimally allocating its resources, even under the presence of forecast uncertainty.

0.18

Integrating Fast-response Capability into Virtual Power Plant Operation for Ancillary Services

eess.SY ·2026-08-26 ·Qixing Liu, Ruike Lyu, Zhe Zhai, Yan Shen, Xue Liu +1 more
published similarity 0.65
Abstract · Published in: 2025 IEEE Kiel PowerTech

Virtual power plants (VPPs) can aggregate distributed energy resources (DERs) to provide ancillary services for power systems, creating new profit opportunities. Ancillary services such as secondary frequency regulation require providers to have sufficient response capability to follow rapidly changing control commands. If overlooking the response requirement, the VPP will not be able to accurately measure its regulation capability, reducing its earnings in performance-based markets or risking disqualification. This paper integrates the requirement for fast-response capability into the operational framework of VPPs providing ancillary services. We leverage historical control commands to formulate chance constraints in the bidding model, mandating that the VPP's fast-response capability meets the requirement of ancillary services with a specified probability. Case studies verify that considering fast-response capabilities can enhance VPP operation.

0.62

Industrial Load Modeling and Optimization for Market-Based Interaction with Power Systems

eess.SY ·2026-08-15 ·Ruike Lyu
similarity 0.65
Abstract · PhD thesis, Tsinghua University, June 2026, 176 pages

The transition toward a renewable-dominated power system increases the flexibility needed to balance net-load variations. Industrial loads account for over 40% of the world's electricity consumption and can shift large amounts of demand through automated production scheduling. However, making industrial processes a dependable flexibility resource for power systems remains challenging because industrial process constraints are non-convex, equipment parameters are often private, and device-level models of thousands of facilities are too detailed for aggregator and power-system optimization. This dissertation builds computationally efficient methods for modeling and optimizing industrial flexibility for power-system interaction. Specifically, this dissertation uses smart meters as the external measurement interface and maps industrial process constraints into a concise flexibility space for power-system operation. The resulting chain of mechanism modeling, parameter identification, constraint dimension reduction, and optimal decision-making makes industrial-load participation computationally tractable while retaining precise process models for final execution.

0.10

Optimal Operation Method for Computing Power-Electric Power Coordination Considering End-to-End Completion Latency of Computing Tasks

eess.SY ·2026-09-22 ·Yize Liu, Mingyu Yan, Jianfeng Wen, Meng Song, Qing Yang +1 more
similarity 0.62
Abstract · 10 pages, 7 figures, 4 tables. Submitted to Proceedings of the CSEE. This is a bilingual manuscript. The English version appears first, foll…

With the rapid growth of computing demand and the large-scale integration of renewable energy, how to realize the coordinated optimal operation of computing networks and power networks has become an important issue to be addressed. However, existing studies mainly focus on the impacts of spatiotemporal migration of computing loads on power system operation, while the internal task processing procedures of computing networks are largely neglected. To address this issue, this paper proposes an optimal operation method for computing power-electric power coordination considering the end-to-end completion latency of computing tasks. First, a full-process latency model covering the "transmission-buffering-computation" procedure of computing tasks is established, which uniformly characterizes forwarding waiting, network transmission, queueing, and computation processing. Second, a task-level spatiotemporal scheduling mechanism is developed to jointly optimize the task forwarding time, routing path, and destination computing node. Then, a computing power-electric power coordinated optimization model is formulated to minimize the power supply cost of the power network and the total completion latency of computing tasks. Case studies demonstrate that the proposed method can fully exploit the task-level spatiotemporal scheduling flexibility of computing loads and facilitate the spatiotemporal matching between computing loads and renewable energy, thereby reducing the system power supply cost while ensuring the quality of service for computing tasks.

0.22

Continuous-Time Aggregation of Massive Flexible HVAC Loads Considering Uncertainty for Reserve Provision in Power System Dispatch

eess.SY ·2026-09-02 ·Jingguan Liu, Xiaomeng Ai, Jiakun Fang, Shichang Cui, Shengshi Wang +2 more
top venuehot directionhighly cited similarity 0.62
Abstract · Published in: IEEE Transactions on Smart Grid (vol. 15, no. 5, pp. 4835-4849, 2024)

Heating, ventilation, and air conditioning (HVAC) loads, with their rapid response capabilities, can provide considerable intra-hour flexibility on the demand side for reserve provision in order to follow the fast variations of renewables. However, scheduling massive HVACs is challenging due to computation complexity and the uncertainty of outdoor temperature. In this paper, we first introduce a novel continuous-time (CT) aggregation model to reveal the potential intra-hour flexibility of HVACs. For accurate aggregation, a new affine transformation is designed to handle the heterogeneity in high-dimensional feasible region. Further, for reliable aggregation in practical environment, the outdoor temperature uncertainty is constructed by distributionally robust chance constrains and integrated into the aggregation model. Secondly, for the tractable calculation of the proposed CT aggregation model, a cascade of tailored reformulation techniques is proposed, including the Bernstein polynomial spline, polytope projection, and linearization transformation. Thirdly, a customized hierarchical dispatch framework is proposed via incorporating the proposed CT aggregation model into reserve provision in power system dispatch, so as to efficiently schedule massive HVACs to cope with the renewable uncertainty. Case studies verify the effectiveness and scalability of the proposed CT aggregation model in aggregation accuracy, intra-hour flexibility utilization, and uncertainty handling.

0.67

Optimal Coordination of Multiple Ancillary Service Provisions in Active Distribution Networks

eess.SY ·2026-11-14 ·Xinbao Jia, Yi Guo, Ognjen Stanojev, Zhen Chen, Yuning Jiang +1 more
similarity 0.61
Abstract · 16 pages

We propose a multi-rate model predictive control (MPC) framework for coordinating primary frequency control (PFC), automatic generation control (AGC), and voltage control (VC) in active distribution networks. The framework allocates distributed energy resource (DER) flexibility among these three ancillary services while retaining their different update rates. To account for the intertemporal flexibility of electric vehicle aggregations and aggregations of buildings with thermostatically controlled loads (TCLs), we incorporate time-varying power-energy envelopes into our multi-rate MPC formulation. These constraints couple the combined PFC and AGC response to the demand-side flexibility available later in the prediction horizon. Furthermore, the input-multirate structure enables coordinated ancillary service provision by DERs with different response dynamics. The controller optimizes the three services together, allowing fast regulation to be coordinated with the developing slow response within the available DER flexibility. We demonstrate the coordinated provision of the three ancillary services through closed-loop simulations on a modified IEEE 33-bus system using a nonlinear differential-algebraic model.

0.32

Converter-Aware Coordination of Computing Flexibility in Behind-the-Meter Data Centers

eess.SY ·2026-10-16 ·Ruolan Cui, Ruizhang Yang, Chenxi Hu, Franxis Yunhe Hou
similarity 0.60
Abstract

Data centers are emerging as large electricity consumers whose demand can be reshaped through workload scheduling. However, computing flexibility in behind-the-meter facilities does not automatically translate into electrically realizable power flexibility. Ignoring converter and network operating limits may cause converter overloads, protection trips, and interruptions to power supply and computing services. This paper proposes a converter-aware intraday scheduling methodology. First, a task-level mixed-integer linear formulation preserves synchronous training configurations and completion requirements, while Minkowski-sum aggregation and Shapley--Folkman convexification yield a linear inference-pool representation without unit-level binary variables. The latter admits a conditional relative relaxation-gap bound that decreases inversely with pool size. Second, a four-node electrical model links computing demand, on-site injections, and grid exchange to converter and network limits through lifted voltage variables and second-order cone relaxation. Finally, a mixed-integer model coordinates workloads, photovoltaic generation, energy storage, and grid purchases. Case studies show that electrical limits reshape scheduling and renewable utilization, while on-site resources reduce grid dependence. Under the studied conditions, fixed training cannot support full inference service within voltage limits, whereas coordinated scheduling achieves negligible inference shortage and passes verification against the original alternating-current model. These findings demonstrate the role of computing--electrical coordination in realizing the operational value of workload flexibility.

0.14