CS Paper Radar

Industrial Load Modeling and Optimization for Market-Based Interaction with Power Systems

Ruike Lyu

eess.SY ·submitted 2026-08-15 06:50 UTC · v4

Abstract

The transition toward a renewable-dominated power system increases the flexibility needed to balance net-load variations. Industrial loads account for over 40% of the world's electricity consumption and can shift large amounts of demand through automated production scheduling. However, making industrial processes a dependable flexibility resource for power systems remains challenging because industrial process constraints are non-convex, equipment parameters are often private, and device-level models of thousands of facilities are too detailed for aggregator and power-system optimization. This dissertation builds computationally efficient methods for modeling and optimizing industrial flexibility for power-system interaction. Specifically, this dissertation uses smart meters as the external measurement interface and maps industrial process constraints into a concise flexibility space for power-system operation. The resulting chain of mechanism modeling, parameter identification, constraint dimension reduction, and optimal decision-making makes industrial-load participation computationally tractable while retaining precise process models for final execution.

Comment
PhD thesis, Tsinghua University, June 2026, 176 pages

Closest papers

Nearest neighbours by meaning across the whole index.

Production Scheduling Identification: An Inverse Optimization Approach for Industrial Load Modeling Using Smart Meter Data

eess.SY ·2026-08-27 ·Ruike Lyu, Hongye Guo, Qinghu Tang, Qixin Chen, Chongqing Kang
top venuehighly cited similarity 0.69
Abstract · Published in: IEEE Transactions on Smart Grid ( Volume: 16, Issue: 2, March 2025)

To cost-effectively manage the supply-demand balance of the power system, the flexibility of industrial users could be harnessed through demand-side response. To minimize the negative impact on the production of industrial users during demand-side response, general-purpose models such as the state-task network (STN) are widely used to model the energy-consuming constraints of industrial production processes. However, the required model parameters cannot be set because the required data are privately owned by industrial users and are not directly available, hindering the accurate modeling of industrial loads. In this paper, we propose production scheduling identification (PSI), an inverse-optimization-based approach for industrial load modeling under incomplete information. In PSI, industrial users' smart meter data are used to identify production scheduling parameters, thus addressing the problem of accurate load modeling when private data are unavailable. We implemented PSI with a modified STN and proposed a practical algorithm to obtain an effective solution. Numerical tests showed that PSI can identify the model parameters of a steel powder plant and a cement plant with acceptable accuracy, using only 21 days of hourly smart meter data. Compared with accurate models established with direct access to private data, the modeling error does not exceed 8.5% and 5.2%, respectively.

0.66

Real-Time Operation Strategy of Virtual Power Plants With Optimal Power Disaggregation Among Heterogeneous Resources

eess.SY ·2026-08-27 ·Qixin Chen, Ruike Lyu, Hongye Guo, Xiangbo Su
publishedhot directionhighly cited similarity 0.65
Abstract · Accepted by Applied Energy

The virtual power plant (VPP) can aggregate flexible resources on the demand side to provide frequency regulation for the grid, helping address the supply-demand balance challenges. When deploying regulation, the VPP disaggregates the requested power adjustment in real time among its internal heterogeneous resources. Achieving optimal power disaggregation in this process is challenging due to the temporal coupling characteristics of the resources, the uncertain regulation signals, and the requirement for fast response. Therefore, existing research relies on heuristic methods, such as proportional disaggregation, and fails to leverage the heterogeneity of multiple resources. Here, we propose an optimal operation strategy for VPPs to provide regulation, exploiting the complementary characteristics of heterogeneous resources by prioritizing the use of low-cost resources while considering temporal coupling. To reduce the computational overhead of online deployment, we further propose a fast disaggregation algorithm to eliminate the reliance on optimisation solvers. We conducted case studies on the operation of a VPP composed of resources including thermostatically controlled loads and industrial production processes. The results verified the reduced operation cost and increased profit of the VPP under the proposed strategy, with only milliseconds of online computation time. We believe that our work can help better exploit demand-side flexibility.

0.62

Converter-Aware Coordination of Computing Flexibility in Behind-the-Meter Data Centers

eess.SY ·2026-10-16 ·Ruolan Cui, Ruizhang Yang, Chenxi Hu, Franxis Yunhe Hou
similarity 0.62
Abstract

Data centers are emerging as large electricity consumers whose demand can be reshaped through workload scheduling. However, computing flexibility in behind-the-meter facilities does not automatically translate into electrically realizable power flexibility. Ignoring converter and network operating limits may cause converter overloads, protection trips, and interruptions to power supply and computing services. This paper proposes a converter-aware intraday scheduling methodology. First, a task-level mixed-integer linear formulation preserves synchronous training configurations and completion requirements, while Minkowski-sum aggregation and Shapley--Folkman convexification yield a linear inference-pool representation without unit-level binary variables. The latter admits a conditional relative relaxation-gap bound that decreases inversely with pool size. Second, a four-node electrical model links computing demand, on-site injections, and grid exchange to converter and network limits through lifted voltage variables and second-order cone relaxation. Finally, a mixed-integer model coordinates workloads, photovoltaic generation, energy storage, and grid purchases. Case studies show that electrical limits reshape scheduling and renewable utilization, while on-site resources reduce grid dependence. Under the studied conditions, fixed training cannot support full inference service within voltage limits, whereas coordinated scheduling achieves negligible inference shortage and passes verification against the original alternating-current model. These findings demonstrate the role of computing--electrical coordination in realizing the operational value of workload flexibility.

0.14

Efficient Scheduling of Discrete Industrial Processes Through Continuous Modeling

eess.SY ·2026-08-27 ·Ruike Lyu, Xiangbo Su, Ershun Du, Hongye Guo, Qixin Chen +1 more
top venuehighly cited similarity 0.61
Abstract · Published in: IEEE Transactions on Smart Grid ( Volume: 16, Issue: 6, November 2025)

The resource-task network (RTN) model has been widely applied to represent the technical constraints of complex industrial processes (IPs) such as steel-making, providing the basis for industrial demand response. However, the legacy RTN model contains numerous binary variables and applies different formulations for non-flexible and flexible processes, restricting its computational efficiency and applicability. To systematically improve the computational performance of IP models, we propose continuous RTN model (cRTN), a novel modeling approach that uses continuous variables to represent production tasks and progresses, which are then integrated into unified as well as computationally favorable formulations for the technical constraints in discrete IPs, including resource balance, task execution, waiting time limits, and production targets. Compared to the legacy models, cRTN features fewer binary variables, shorter solving time, and better scalability while maintaining the same accuracy. Numerical tests based on a steel plant demonstrate that cRTN is in typical cases 10 times faster than legacy models and remains tractable with increasing batch sizes, which in legacy models leads to larger problem scales and infeasible solving time. cRTN also achieves a reduction in energy costs by resolving the issue of rounding errors reported in legacy models.

0.65

Feeder-Aware Service-Conditioned Flexibility of Grid-Interactive Buildings

eess.SY ·2026-10-22 ·Dafang Zhao, Ittetsu Taniguchi, Takao Onoye
similarity 0.60
Abstract

Grid-interactive buildings can adjust demand, but building-feasible power budgets may differ from accepted feeder-head offers. This study addresses a practical question: to what extent can the adjustable electricity consumption of buildings be translated into deliverable flexibility services while satisfying feeder-head operating requirements? To enable a fair comparison, we adopt the same baseline operating schedule, equipment conditions, and post-service recovery requirements for indoor temperature and battery state of charge (SOC). Flexibility is then evaluated under two settings: one considering only building-level constraints, and the other additionally accounting for feeder-head constraints. We first use a simplified network model with explicit security margins to determine a preliminary amount of flexibility that can be committed. The resulting schedule is then validated using a more detailed network simulation via Modelica. If network losses cause the actual response to deviate from the committed response, the electricity consumption of individual buildings is rescheduled. If the required response still cannot be achieved, the committed flexibility level is reduced. The experiments cover multiple service activation times, regulation directions, and service durations. For comparative purposes, we retain the initial optimization result as the reference estimate of the maximum potentially available flexibility, rather than interpreting the failure of a particular subsequent realization attempt as evidence that a larger flexibility level is inherently infeasible. The results demonstrated that 24.51\% of nonzero flexibility contracts were rejected due to feeder-head constraints, 67.04\% of contracts were accepted with some rescheduling and building redispatch, and only 8.09\% of contracts were accepted without any changes.

0.16

Robust Joint Planning of EV and eBus Charging Infrastructure with PV Self-Consumption under Demand Uncertainty

eess.SY ·2026-08-19 ·Biswarup Mukherjee
benchmark similarity 0.60
Abstract · This manuscript has been submitted for peer review

This paper presents a mixed-integer linear programming (MILP) framework for joint electric vehicle (EV) and electric bus (eBus) charging-infrastructure planning with photovoltaic (PV) self-consumption. The model co-optimizes charger siting, sizing, technology selection, eBus-to-depot assignment, and hourly charging schedules. A deterministic MILP is first formulated as a nominal benchmark and then extended to a scenario-based robust min--max formulation under vehicle energy-demand uncertainty. The robust model uses shared first-stage infrastructure decisions and scenario-specific operating decisions, and minimizes infrastructure cost plus the worst-case scenario operating cost through an epigraph reformulation. Soft-feasibility penalties quantify unmet charging energy, terminal state-of-charge (SOC) shortfall, and capacity violations under stressed scenarios. A 50-node case study shows that route-segment eBus demand and PV weighting alter charger deployment, technology mix, and grid import, while V2G enables hard-feasible robust operation at sufficiently large penalty weights. These results highlight that effective long-term infrastructure planning must simultaneously account for diverse vehicle fleets, operational strategies that adapt to different scenarios, and node-level constraints on charging capacity.

0.19

Data-Driven Dimension Reduction for Industrial Load Modeling Using Inverse Optimization

eess.SY ·2026-08-25 ·Ruike Lyu, Hongye Guo, Goran Strbac, Chongqing Kang
top venuehighly cited similarity 0.59
Abstract · Manuscript accepted by IEEE Power Engineering Letters (Published in: IEEE Transactions on Smart Grid ( Volume: 16, Issue: 3, May 2025))

The intricate mixed-integer constraints in industrial load models not only pose challenges for their direct integration into economic dispatch or market clearing processes but also render current analytical dimension-reduction methods ineffective. We propose a novel data-driven dimension-reduction approach for industrial load modeling, which uses the optimal energy usage data from industrial loads to train a dimension-reduced model that best fits the original constraints. Our approach, implemented by the adjustable load fleet model, outperformed analytical methods across three industrial load datasets.

0.74

LSTN: A Linear Model of Industrial Production Process for Demand Response

eess.SY ·2026-08-26 ·Ruike Lyu, Hongye Guo, Yuanjie Zheng, Yunlong Bai, Qixin Chen
publishedhighly cited similarity 0.58
Abstract · Published in: 2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)

Industrial production modeling provides operational constraints for industrial users participating in demand response (DR) programs. Conventional modeling of the production process introduces binary variables to model the discrete operating points of industrial equipment, which can be computationally infeasible in large-scale DR applications. To reasonably model industrial users' operational constraints while balancing computational complexity and modeling accuracy, we developed a linear model of the industrial production process for evaluating DR applications. Numerical results verify the accuracy of the proposed model and its great improvement in computational efficiency over competing approaches.

0.68