The resource-task network (RTN) model has been widely applied to represent the technical constraints of complex industrial processes (IPs) such as steel-making, providing the basis for industrial demand response. However, the legacy RTN model contains numerous binary variables and applies different formulations for non-flexible and flexible processes, restricting its computational efficiency and applicability. To systematically improve the computational performance of IP models, we propose continuous RTN model (cRTN), a novel modeling approach that uses continuous variables to represent production tasks and progresses, which are then integrated into unified as well as computationally favorable formulations for the technical constraints in discrete IPs, including resource balance, task execution, waiting time limits, and production targets. Compared to the legacy models, cRTN features fewer binary variables, shorter solving time, and better scalability while maintaining the same accuracy. Numerical tests based on a steel plant demonstrate that cRTN is in typical cases 10 times faster than legacy models and remains tractable with increasing batch sizes, which in legacy models leads to larger problem scales and infeasible solving time. cRTN also achieves a reduction in energy costs by resolving the issue of rounding errors reported in legacy models.

Comment
Published in: IEEE Transactions on Smart Grid ( Volume: 16, Issue: 6, November 2025)
DOI
10.1109/TSG.2025.3589551

Closest papers

Nearest neighbours by meaning across the whole index.

LSTN: A Linear Model of Industrial Production Process for Demand Response

eess.SY ·2026-08-26 ·Ruike Lyu, Hongye Guo, Yuanjie Zheng, Yunlong Bai, Qixin Chen
publishedhighly cited similarity 0.68
Abstract · Published in: 2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)

Industrial production modeling provides operational constraints for industrial users participating in demand response (DR) programs. Conventional modeling of the production process introduces binary variables to model the discrete operating points of industrial equipment, which can be computationally infeasible in large-scale DR applications. To reasonably model industrial users' operational constraints while balancing computational complexity and modeling accuracy, we developed a linear model of the industrial production process for evaluating DR applications. Numerical results verify the accuracy of the proposed model and its great improvement in computational efficiency over competing approaches.

0.68

Reinforcement Learning-Based Production Scheduling in an Industry-Based Coating Scenario Using the Digital Model Playground

cs.AI ·2026-08-14 ·Arne Kröger, Ralf Buschermöhle, Wilhelm Hasselbring, Henrik Wilbers
publishedbenchmarkcode/data similarity 0.65
Abstract · Copyright 2026 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or…

Production scheduling in complex manufacturing environments is challenging when sequence-dependent setup times, stochastic disturbances, and due-date constraints must be addressed simultaneously. While reinforcement learning (RL) methods have shown promising results in research, most studies rely on simplified benchmark processes, limiting their industrial relevance. This paper demonstrates the applicability of RL-based scheduling in an industry-inspired coating process that reflects practical complexities such as sequence-dependent setup times, machine breakdowns, and variable utilization. The open-source Digital Model Playground (DMPG), a discrete event simulation framework, is used to model the scenario and to train RL agents. Two standard algorithms, Deep Q-Networks and Proximal Policy Optimization, are benchmarked against conventional dispatching rules to illustrate feasibility and to provide a transparent testbed for further research. Results indicate that RL-based scheduling achieves balanced improvements across key performance indicators, with PPO delivering the most robust performance. The main contribution of this work is to bridge the gap between academic research and industrial practice by validating RL-based scheduling in a realistic, shareable scenario and by providing a reusable open-source framework for future studies.

0.38

Production Scheduling Identification: An Inverse Optimization Approach for Industrial Load Modeling Using Smart Meter Data

eess.SY ·2026-08-27 ·Ruike Lyu, Hongye Guo, Qinghu Tang, Qixin Chen, Chongqing Kang
top venuehighly cited similarity 0.62
Abstract · Published in: IEEE Transactions on Smart Grid ( Volume: 16, Issue: 2, March 2025)

To cost-effectively manage the supply-demand balance of the power system, the flexibility of industrial users could be harnessed through demand-side response. To minimize the negative impact on the production of industrial users during demand-side response, general-purpose models such as the state-task network (STN) are widely used to model the energy-consuming constraints of industrial production processes. However, the required model parameters cannot be set because the required data are privately owned by industrial users and are not directly available, hindering the accurate modeling of industrial loads. In this paper, we propose production scheduling identification (PSI), an inverse-optimization-based approach for industrial load modeling under incomplete information. In PSI, industrial users' smart meter data are used to identify production scheduling parameters, thus addressing the problem of accurate load modeling when private data are unavailable. We implemented PSI with a modified STN and proposed a practical algorithm to obtain an effective solution. Numerical tests showed that PSI can identify the model parameters of a steel powder plant and a cement plant with acceptable accuracy, using only 21 days of hourly smart meter data. Compared with accurate models established with direct access to private data, the modeling error does not exceed 8.5% and 5.2%, respectively.

0.66

Industrial Load Modeling and Optimization for Market-Based Interaction with Power Systems

eess.SY ·2026-08-15 ·Ruike Lyu
similarity 0.61
Abstract · PhD thesis, Tsinghua University, June 2026, 176 pages

The transition toward a renewable-dominated power system increases the flexibility needed to balance net-load variations. Industrial loads account for over 40% of the world's electricity consumption and can shift large amounts of demand through automated production scheduling. However, making industrial processes a dependable flexibility resource for power systems remains challenging because industrial process constraints are non-convex, equipment parameters are often private, and device-level models of thousands of facilities are too detailed for aggregator and power-system optimization. This dissertation builds computationally efficient methods for modeling and optimizing industrial flexibility for power-system interaction. Specifically, this dissertation uses smart meters as the external measurement interface and maps industrial process constraints into a concise flexibility space for power-system operation. The resulting chain of mechanism modeling, parameter identification, constraint dimension reduction, and optimal decision-making makes industrial-load participation computationally tractable while retaining precise process models for final execution.

0.10

Fast Reassessment of Prolonged Electricity Shortages under Shared Fuel Interruptions

eess.SY ·2026-10-19 ·Dogan Urgun
code/data similarity 0.57
Abstract · 11 pages, 4 figures, 5 tables. Submitted to IEEE Transactions on Reliability. Code and data: https://github.com/DoganUrgun/Fast_Reassessment…

When several generators share a fuel supply, one interruption can disable them together and cause electricity shortages lasting days. Such interruptions can be made less frequent, for example by weatherizing gas supply, or shorter, for example by on-site backup fuel. Yet traditional resource adequacy indices, expected unserved energy and loss-of-load hours, fail to distinguish such measures whenever they remove the same expected time without fuel, because for interruptions independent of system conditions these indices depend on the interruptions only through this time. Their difference is revealed by prolonged-shortage exposure, the expected annual hours in shortages of at least a given duration, whose exact chronological calculation must be repeated for every interruption scenario. To reduce this cost, a fast reassessment method with guaranteed accuracy is proposed. Network calculations are performed once and condensed into a restoration response, the additional prolonged-shortage hours caused by one interruption of each duration, from which any scenario is evaluated as a weighted sum without new simulation. An hour-by-hour error bound determines whether this evaluation is accurate enough, and exact dynamic programming is applied otherwise, so that every result lies within a requested tolerance of the exact value on the same Monte Carlo samples. On the Reliability Test System of the Grid Modernization Laboratory Consortium, most evaluations were accepted, fully accepted scenarios typically ran more than 200 times faster than exact calculation, and total computation time decreased in every workload. Measures against fuel interruptions can thus be screened quickly and accurately by their effect on prolonged shortages.

0.37

Real-Time Operation Strategy of Virtual Power Plants With Optimal Power Disaggregation Among Heterogeneous Resources

eess.SY ·2026-08-27 ·Qixin Chen, Ruike Lyu, Hongye Guo, Xiangbo Su
publishedhot directionhighly cited similarity 0.57
Abstract · Accepted by Applied Energy

The virtual power plant (VPP) can aggregate flexible resources on the demand side to provide frequency regulation for the grid, helping address the supply-demand balance challenges. When deploying regulation, the VPP disaggregates the requested power adjustment in real time among its internal heterogeneous resources. Achieving optimal power disaggregation in this process is challenging due to the temporal coupling characteristics of the resources, the uncertain regulation signals, and the requirement for fast response. Therefore, existing research relies on heuristic methods, such as proportional disaggregation, and fails to leverage the heterogeneity of multiple resources. Here, we propose an optimal operation strategy for VPPs to provide regulation, exploiting the complementary characteristics of heterogeneous resources by prioritizing the use of low-cost resources while considering temporal coupling. To reduce the computational overhead of online deployment, we further propose a fast disaggregation algorithm to eliminate the reliance on optimisation solvers. We conducted case studies on the operation of a VPP composed of resources including thermostatically controlled loads and industrial production processes. The results verified the reduced operation cost and increased profit of the VPP under the proposed strategy, with only milliseconds of online computation time. We believe that our work can help better exploit demand-side flexibility.

0.62

A Constraint-Aware Generative Framework for Synthetic Origin-Destination Demand in Logistics Networks

eess.SY cs.LGstat.ML ·2026-09-03 ·Leian Chen
similarity 0.57
Abstract · 13 pages

Large-scale logistics networks require synthetic data generation capabilities to support scenario-based planning under novel conditions-such as network reconfiguration and demand shocks. Existing approaches, which rely primarily on historical observations, lack the ability to generate demand patterns that adapt to changes in network topology while respecting operational constraints. We propose a constraint-aware conditional generative framework for synthetic origin-destination demand generation in hierarchical logistics networks. The framework models demand as a conditional distribution over destinations given each origin, enabling topology-aware synthesis that is both topologically realistic and operationally feasible. Operational guidance is incorporated directly into the generative objective via differentiable constraints, while a flexible conditioning mechanism supports various operational contexts and adaptation to evolving network configurations. We instantiate the proposed framework based on a conditional generative model. Experimental validation on industrial real fulfillment and transportation network demonstrates 16% improvement over graph neural network baselines, 87% operational compliance, and efficient cold-start adaptation, enabling applications in capacity planning, network design evaluation, and routing optimization.

0.15

little m: An AI Agent for Industrial Process Optimization

cs.AI ·2026-09-15 ·Yongchao Ye, Xinyu He, Dutliff Boshoff, Way Kuo, Lishuai Li
top venuebenchmarkcode/data similarity 0.57
Abstract

Manufacturing consumes one third of global energy and still has significant room for improvement in terms of energy efficiency. Optimal process control is essential for this purpose. However, synthesizing mathematical optimization models from messy, real-world industrial specifications requires bridging unstructured natural language and spatial diagrams with rigorous mathematical syntax. This poses a profound challenge for general-purpose Large Language Models (LLMs), which may introduce invalid constraints when tasked with modeling continuous multi-physics dynamics. To address this, we introduce little m, an AI agent designed to assist the formulation of industrial process control models. Combining a domain-specific knowledge repository with LLM-driven interaction, the proposed framework formulates real-world optimization problems as mathematical models. For systematic evaluation, we introduce the Industrial Process Control Benchmark (IPC-Bench), a novel multimodal dataset of 50 canonical scenarios requiring joint reasoning over text and process diagrams. Through comprehensive automated structural assessments and double-blind human evaluation, little m substantially outperforms state-of-the-art LLMs, generating semantically correct models. These evaluations assess formulation quality rather than solver feasibility, formal physical validity, or closed-loop industrial performance. The implementation of little m and the IPC-Bench dataset are available at https://github.com/yeyongchao/process-modeling-benchmark.