CS Paper Radar

LSTN: A Linear Model of Industrial Production Process for Demand Response

Ruike Lyu, Hongye Guo, Yuanjie Zheng, Yunlong Bai, Qixin Chen

eess.SY ·submitted 2026-08-26 00:08 UTC · v1
publishedhighly cited

Abstract

Industrial production modeling provides operational constraints for industrial users participating in demand response (DR) programs. Conventional modeling of the production process introduces binary variables to model the discrete operating points of industrial equipment, which can be computationally infeasible in large-scale DR applications. To reasonably model industrial users' operational constraints while balancing computational complexity and modeling accuracy, we developed a linear model of the industrial production process for evaluating DR applications. Numerical results verify the accuracy of the proposed model and its great improvement in computational efficiency over competing approaches.

Comment
Published in: 2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)
DOI
10.1109/ISGTEUROPE56780.2023.10408608

Closest papers

Nearest neighbours by meaning across the whole index.

Efficient Scheduling of Discrete Industrial Processes Through Continuous Modeling

eess.SY ·2026-08-27 ·Ruike Lyu, Xiangbo Su, Ershun Du, Hongye Guo, Qixin Chen +1 more
top venuehighly cited similarity 0.68
Abstract · Published in: IEEE Transactions on Smart Grid ( Volume: 16, Issue: 6, November 2025)

The resource-task network (RTN) model has been widely applied to represent the technical constraints of complex industrial processes (IPs) such as steel-making, providing the basis for industrial demand response. However, the legacy RTN model contains numerous binary variables and applies different formulations for non-flexible and flexible processes, restricting its computational efficiency and applicability. To systematically improve the computational performance of IP models, we propose continuous RTN model (cRTN), a novel modeling approach that uses continuous variables to represent production tasks and progresses, which are then integrated into unified as well as computationally favorable formulations for the technical constraints in discrete IPs, including resource balance, task execution, waiting time limits, and production targets. Compared to the legacy models, cRTN features fewer binary variables, shorter solving time, and better scalability while maintaining the same accuracy. Numerical tests based on a steel plant demonstrate that cRTN is in typical cases 10 times faster than legacy models and remains tractable with increasing batch sizes, which in legacy models leads to larger problem scales and infeasible solving time. cRTN also achieves a reduction in energy costs by resolving the issue of rounding errors reported in legacy models.

0.65

Production Scheduling Identification: An Inverse Optimization Approach for Industrial Load Modeling Using Smart Meter Data

eess.SY ·2026-08-27 ·Ruike Lyu, Hongye Guo, Qinghu Tang, Qixin Chen, Chongqing Kang
top venuehighly cited similarity 0.60
Abstract · Published in: IEEE Transactions on Smart Grid ( Volume: 16, Issue: 2, March 2025)

To cost-effectively manage the supply-demand balance of the power system, the flexibility of industrial users could be harnessed through demand-side response. To minimize the negative impact on the production of industrial users during demand-side response, general-purpose models such as the state-task network (STN) are widely used to model the energy-consuming constraints of industrial production processes. However, the required model parameters cannot be set because the required data are privately owned by industrial users and are not directly available, hindering the accurate modeling of industrial loads. In this paper, we propose production scheduling identification (PSI), an inverse-optimization-based approach for industrial load modeling under incomplete information. In PSI, industrial users' smart meter data are used to identify production scheduling parameters, thus addressing the problem of accurate load modeling when private data are unavailable. We implemented PSI with a modified STN and proposed a practical algorithm to obtain an effective solution. Numerical tests showed that PSI can identify the model parameters of a steel powder plant and a cement plant with acceptable accuracy, using only 21 days of hourly smart meter data. Compared with accurate models established with direct access to private data, the modeling error does not exceed 8.5% and 5.2%, respectively.

0.66

Industrial Load Modeling and Optimization for Market-Based Interaction with Power Systems

eess.SY ·2026-08-15 ·Ruike Lyu
similarity 0.58
Abstract · PhD thesis, Tsinghua University, June 2026, 176 pages

The transition toward a renewable-dominated power system increases the flexibility needed to balance net-load variations. Industrial loads account for over 40% of the world's electricity consumption and can shift large amounts of demand through automated production scheduling. However, making industrial processes a dependable flexibility resource for power systems remains challenging because industrial process constraints are non-convex, equipment parameters are often private, and device-level models of thousands of facilities are too detailed for aggregator and power-system optimization. This dissertation builds computationally efficient methods for modeling and optimizing industrial flexibility for power-system interaction. Specifically, this dissertation uses smart meters as the external measurement interface and maps industrial process constraints into a concise flexibility space for power-system operation. The resulting chain of mechanism modeling, parameter identification, constraint dimension reduction, and optimal decision-making makes industrial-load participation computationally tractable while retaining precise process models for final execution.

0.10

Data-Driven Dimension Reduction for Industrial Load Modeling Using Inverse Optimization

eess.SY ·2026-08-25 ·Ruike Lyu, Hongye Guo, Goran Strbac, Chongqing Kang
top venuehighly cited similarity 0.53
Abstract · Manuscript accepted by IEEE Power Engineering Letters (Published in: IEEE Transactions on Smart Grid ( Volume: 16, Issue: 3, May 2025))

The intricate mixed-integer constraints in industrial load models not only pose challenges for their direct integration into economic dispatch or market clearing processes but also render current analytical dimension-reduction methods ineffective. We propose a novel data-driven dimension-reduction approach for industrial load modeling, which uses the optimal energy usage data from industrial loads to train a dimension-reduced model that best fits the original constraints. Our approach, implemented by the adjustable load fleet model, outperformed analytical methods across three industrial load datasets.

0.74

Mixed-integer programming formulations for optimal reconfiguration of supply chains

eess.SY math.OC ·2026-08-18 ·Lavinia M. P. Ghilardi, Olga Walz, Steffen Klosterhalfen, Calvin Tsay
published similarity 0.48
Abstract · Accepted to IFAC World Congress 2026

Supply chains are interconnected networks of processes and operations producing and delivering high-value products. These chains are increasingly subjected to structural changes from the energy transition and other external factors. To address this, this work develops mixed-integer programming formulations to identify optimal reconfigurations that preserve industrial operations and profitability. We propose products and spatial neighborhoods to restrict the feasible search space and enable fast heuristic solutions. Furthermore, this restriction combines structural and product-based information, thus allowing to explore and define multiple reconfiguration scenarios. We demonstrate the approach using an agricultural waste case study, showing its ability to quickly produce good quality solutions.

0.36

Reinforcement Learning-Based Production Scheduling in an Industry-Based Coating Scenario Using the Digital Model Playground

cs.AI ·2026-08-14 ·Arne Kröger, Ralf Buschermöhle, Wilhelm Hasselbring, Henrik Wilbers
publishedbenchmarkcode/data similarity 0.48
Abstract · Copyright 2026 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or…

Production scheduling in complex manufacturing environments is challenging when sequence-dependent setup times, stochastic disturbances, and due-date constraints must be addressed simultaneously. While reinforcement learning (RL) methods have shown promising results in research, most studies rely on simplified benchmark processes, limiting their industrial relevance. This paper demonstrates the applicability of RL-based scheduling in an industry-inspired coating process that reflects practical complexities such as sequence-dependent setup times, machine breakdowns, and variable utilization. The open-source Digital Model Playground (DMPG), a discrete event simulation framework, is used to model the scenario and to train RL agents. Two standard algorithms, Deep Q-Networks and Proximal Policy Optimization, are benchmarked against conventional dispatching rules to illustrate feasibility and to provide a transparent testbed for further research. Results indicate that RL-based scheduling achieves balanced improvements across key performance indicators, with PPO delivering the most robust performance. The main contribution of this work is to bridge the gap between academic research and industrial practice by validating RL-based scheduling in a realistic, shareable scenario and by providing a reusable open-source framework for future studies.

0.38

Simpler Methods Work Better for L1 Penalized Logistic Models and Large Datasets

cs.LG ·2026-09-21 ·Edward Raff, James Holt
publishedunusual similarity 0.48
Abstract · To appear in The 13th IEEE International Conference on Data Science and Advanced Analytics (DSAA 2026)

Linear models with an $L_1$-norm penalty remain state-of-the-art for high-dimensional ($d > 1,000,000$) tasks, offering a straightforward method for solving real-world industry problems. Despite their widespread use in industry and utility, many $L_1$ solvers are not effective for general use, are prohibitively slow, and are ineffective in parallelization. This makes them difficult to train in an MLOps pipeline on large industry-scale corpora. In this work, we test several proposed ``state-of-the-art'' solutions from the literature and find that older methods are currently far superior for general use. We also identify several recommendations for academics to perform research that avoids erroneously overconfident results, which can prevent the transition to production use. Equally surprising, we find that a new and simple baseline, using LBFGS on a sub-gradient, is highly effective with minor tweaks, despite being dismissed in the literature for theoretical non-convergence. In practice, we find it is an easier-to-support and easier-to-scale method for production use.

0.37

Modelling Renewable Curtailment and Constraints in Ireland's Electricity System

eess.SY math.OC ·2026-08-25 ·Richard Nayer, Sam Hodges, Waqquas Bukhsh, Claver Chitambo, Chanura Wijeratne
similarity 0.47
Abstract · 11 pages

This paper describes the electricity markets and operational processes in the Irish power system and translates them into a Mixed Integer Linear Programming (MILP) model. The model is designed to estimate renewable generation Curtailment and Constraint. A full mathematical formulation is presented and tested on both a simple example and a realistic model of the Irish transmission network. The results show that the proposed formulation works as intended, capturing curtailment and constraint effects, while also highlighting model limitations and directions for future improvement.

0.31