CS Paper Radar

Integrating Fast-response Capability into Virtual Power Plant Operation for Ancillary Services

Qixing Liu, Ruike Lyu, Zhe Zhai, Yan Shen, Xue Liu, Hongye Guo

eess.SY ·submitted 2026-08-26 00:07 UTC · v1
published

Abstract

Virtual power plants (VPPs) can aggregate distributed energy resources (DERs) to provide ancillary services for power systems, creating new profit opportunities. Ancillary services such as secondary frequency regulation require providers to have sufficient response capability to follow rapidly changing control commands. If overlooking the response requirement, the VPP will not be able to accurately measure its regulation capability, reducing its earnings in performance-based markets or risking disqualification. This paper integrates the requirement for fast-response capability into the operational framework of VPPs providing ancillary services. We leverage historical control commands to formulate chance constraints in the bidding model, mandating that the VPP's fast-response capability meets the requirement of ancillary services with a specified probability. Case studies verify that considering fast-response capabilities can enhance VPP operation.

Comment
Published in: 2025 IEEE Kiel PowerTech
DOI
10.1109/PowerTech59965.2025.11180557

Closest papers

Nearest neighbours by meaning across the whole index.

Real-Time Operation Strategy of Virtual Power Plants With Optimal Power Disaggregation Among Heterogeneous Resources

eess.SY ·2026-08-27 ·Qixin Chen, Ruike Lyu, Hongye Guo, Xiangbo Su
publishedhot directionhighly cited similarity 0.65
Abstract · Accepted by Applied Energy

The virtual power plant (VPP) can aggregate flexible resources on the demand side to provide frequency regulation for the grid, helping address the supply-demand balance challenges. When deploying regulation, the VPP disaggregates the requested power adjustment in real time among its internal heterogeneous resources. Achieving optimal power disaggregation in this process is challenging due to the temporal coupling characteristics of the resources, the uncertain regulation signals, and the requirement for fast response. Therefore, existing research relies on heuristic methods, such as proportional disaggregation, and fails to leverage the heterogeneity of multiple resources. Here, we propose an optimal operation strategy for VPPs to provide regulation, exploiting the complementary characteristics of heterogeneous resources by prioritizing the use of low-cost resources while considering temporal coupling. To reduce the computational overhead of online deployment, we further propose a fast disaggregation algorithm to eliminate the reliance on optimisation solvers. We conducted case studies on the operation of a VPP composed of resources including thermostatically controlled loads and industrial production processes. The results verified the reduced operation cost and increased profit of the VPP under the proposed strategy, with only milliseconds of online computation time. We believe that our work can help better exploit demand-side flexibility.

0.62

Approximating Energy-Regulation Feasible Region of Virtual Power Plants: A Data-driven Inverse Optimization Approach

eess.SY math.OC ·2026-08-26 ·Ruike Lyu, Hongye Guo, Qixin Chen
publishedhighly cited similarity 0.65
Abstract · Published in: 2024 IEEE Power & Energy Society General Meeting (PESGM)

System operators will probably allow virtual power plants (VPPs) to submit their feasible region (FR) for market clearing and dispatch. A VPP needs to determine its FR to submit as a whole based on the individual operation model of its internal distributed energy resources (DERs), which is an FR aggregation problem. Existing FR aggregation approaches rely on analytical methods, which have issues with generality and adaptability. In this paper, we propose a data-driven approach to approximate the energy-regulation FR of VPPs. It adopts the virtual battery model to approximate the aggregate FR of a VPP and determines the model parameters through inverse optimization based on generated multi-scenario operation data using the original operation model. Numerical tests verified the accuracy of the proposed method. We believe that our work helps to better leverage the flexibility of DERs.

0.63

Co-optimizing Bidding and Power Allocation of an EV Aggregator Providing Real-time Frequency Regulation Service

eess.SY ·2026-08-25 ·Ruike Lyu, Hongye Guo, Kedi Zheng, Mingyang Sun, Qixin Chen
top venuehighly cited similarity 0.63
Abstract · Published in: IEEE Transactions on Smart Grid ( Volume: 14, Issue: 6, November 2023)

The rapidly expanding scale of electric vehicle (EV) fleets and continuously decreasing battery costs are making vehicle-to-grid services a reality. In this paper, we study the interaction between the problems of an EV aggregator's bidding in the regulation market and power allocation (i.e., determining the (dis)charging powers of the EVs in regulation deployment). Although the two problems are coupled, they are often regarded as decoupled and optimized separately for complexity issues. However, failing to consider the coupling of bidding and power allocation can lead to a decline in the profit of the EV aggregator (EVA). In this paper, we propose a framework for co-optimizing EVA bidding and power allocation in the regulation market. The bidding model is formulated as a stochastic programming problem with embedded power allocation in discretized regulation signal scenarios. To meet the solution time requirement for regulation deployment, we further propose a power allocation model that can be solved online. It utilizes the Lagrange multipliers from the bidding problem to ensure that the allocation results correspond to the optimal solution of the bidding problem. The effect of the proposed framework on improving EVA profits and reducing degradation costs is verified in the case study.

0.67

Ancillary Services in High-Renewable Power Systems: Comparing Market Design, Emerging Trends, and Future Challenges

eess.SY ·2026-09-29 ·Andreas Makrides, Andrey Churkin, Fei Teng, Pierre Pinson
similarity 0.62
Abstract

Rapid growth in renewable generation is changing power-system operation and increasing the importance of ancillary services for security and reliability. As inverter-based resources displace conventional synchronous generation, system operators must procure a broader set of services spanning five categories: frequency control and reserves, voltage and reactive power support, system stability, restoration, and congestion management. This paper compares ancillary-service market design in Great Britain, Germany, Denmark, Italy, California, Texas, and Australia. It examines how these systems define, procure, remunerate, and coordinate services as variable renewable generation increases. The review develops a consistent product-level classification, provides comparable timing visualisations of frequency-control and reserve products, and maps implementation modalities across services and systems. Four trends emerge: faster and more granular frequency-response products, more explicit procurement of stability capabilities including inertia, system strength, and dynamic voltage support, broader participation by storage, demand-side resources, and other inverter-based resources, and greater use of locational, targeted, and technology-neutral procurement. Challenges include limited harmonisation, incomplete valuation of flexibility and stability capabilities whose value depends on location and operating conditions, barriers to participation by distributed and emerging resources, and insufficient coordination between market and operational arrangements. The comparison finds no convergence towards a single market design and supports differentiated but coordinated ancillary-service frameworks reflecting each service's technical, temporal, and locational characteristics.

0.22

Resource-Aware Rolling-Horizon Controller for Renewable-Based Virtual Power Plants Providing Automatic Frequency Restoration Reserves

eess.SY ·2026-09-25 ·Marco Vinicio Avendaño-Caiza, Juan Diego Rios-Peñaloza, Javier Roldán-Pérez, José Luis Rodríguez-Amenedo, Milan Prodanovic
similarity 0.62
Abstract · Submitted to a scientific journal for possible publication. 10 pages, 11 figures

Virtual power plants (VPPs) are an effective solution for increasing the penetration of renewable energy sources (RES) in power systems. Moreover, VPPs can provide ancillary services if generators and loads are closely connected and properly coordinated. This aspect has been addressed in several studies, yet they mostly focus on the dispatch optimisation level, leaving real-time operation aspects unresolved. To close this gap, a central controller for VPPs based on a rolling-horizon optimisation is proposed in this work. Its main objective is to maximise revenues while delivering frequency restoration services. A day-ahead optimisation firstly defines the power setpoint and the upward and downward reserves of the VPP. Then, the rolling-horizon optimiser, executed every minute, distributes the power and reserve references between the VPP units to achieve their close tracking while taking into account resource availability (wind speed, irradiance, etc.), operational constraints and battery degradation. The effectiveness of the controller is tested using a two-area interconnected power system under different RES generation and demand profiles. The simulations are performed in MATLAB/Simulink and include detailed dynamic models of the VPP elements, demonstrating the applicability of the algorithm to real systems. The day-ahead and the rolling-horizon optimisation problems are modelled using YALMIP and solved using Gurobi. The obtained results demonstrate the VPP supporting grid frequency restoration by optimally allocating its resources, even under the presence of forecast uncertainty.

0.18

Dynamic and Risk-Aware Procurement of Fast Frequency Response from Electric Vehicles and Heat Pumps

eess.SY ·2026-11-18 ·Savvas Panagi, Fanourios Kourougianni, Andreas Olympios, Chrysovalantis Spanias, Petros Aristidou
similarity 0.62
Abstract

Low-inertia power systems increasingly rely on Fast Frequency Response (FFR) to keep the frequency nadir above under-frequency load-shedding thresholds without oversized Frequency Containment Reserve or synchronous inertia. This paper proposes two complementary methodologies that interface with an existing day-ahead FFR capacity market. On the Transmission System Operator (TSO) side, a dynamic procurement rule maps forecasted kinetic energy and contingency magnitude onto an offline neighborhood-need surface, yielding interval-wise FFR capacity requests rather than constant seasonal or annual volumes. On the aggregator side, a risk-aware, TSO-certifiable bidding strategy quantifies reliable FFR capacity from fleets of electric vehicles (EVs) and heat pumps (HPs) by offering lower conditional quantiles of day-ahead headroom at a prescribed delivery reliability. The resulting requests and offers are cleared through a pay-as-bid capacity auction. A Cyprus 2025 case study shows that dynamic neighborhood-based procurement yields an annual clearing cost of about EUR 476,000, which is 30%-33% lower than the seasonal and annual static rules and also below the UFLS VoLL of EUR 637,500 estimated from the fifteen real 2025 events with fmin <= 49 Hz. EV and HP offers meet their target delivery reliabilities, and RMS validation finds 46 of 50 operating points above 49 Hz at both full and 85% FFR delivery.

0.25

Optimal Coordination of Multiple Ancillary Service Provisions in Active Distribution Networks

eess.SY ·2026-11-14 ·Xinbao Jia, Yi Guo, Ognjen Stanojev, Zhen Chen, Yuning Jiang +1 more
similarity 0.60
Abstract · 16 pages

We propose a multi-rate model predictive control (MPC) framework for coordinating primary frequency control (PFC), automatic generation control (AGC), and voltage control (VC) in active distribution networks. The framework allocates distributed energy resource (DER) flexibility among these three ancillary services while retaining their different update rates. To account for the intertemporal flexibility of electric vehicle aggregations and aggregations of buildings with thermostatically controlled loads (TCLs), we incorporate time-varying power-energy envelopes into our multi-rate MPC formulation. These constraints couple the combined PFC and AGC response to the demand-side flexibility available later in the prediction horizon. Furthermore, the input-multirate structure enables coordinated ancillary service provision by DERs with different response dynamics. The controller optimizes the three services together, allowing fast regulation to be coordinated with the developing slow response within the available DER flexibility. We demonstrate the coordinated provision of the three ancillary services through closed-loop simulations on a modified IEEE 33-bus system using a nonlinear differential-algebraic model.

0.25

Degradation-Aware Participation of Battery Storage in Frequency Regulation Markets

eess.SY math.OC ·2026-11-09 ·Anand Gokhale, Siddharth Bhela
hot direction similarity 0.59
Abstract · Extended version of IEEE PESGM submission

As data centers make the load on the power grid fluctuate faster, frequency regulation grows more valuable. Battery energy storage systems (BESSs) are well suited to provide frequency regulation, but providing this service speeds up aging, especially during operation at extreme state of charge (SoC). In the PJM interconnection, the grid operator supplies a regulation signal that a participating BESS is expected to follow, within a capacity that it must bid before the signal is known. Accordingly, we decompose the degradation-aware frequency regulation problem into a bidding layer and an operations layer. For bidding, we propose an adaptive strategy, assuming perfect tracking in which the bid depends on the SoC expected at the start of the bid period by means of choosing basepoints. For operation, the BESS further protects its battery by deliberately giving up a perfect performance score, to keep its SoC away from the extremes. On the PJM regulation signal and prices of 2023, adaptive bids lengthen the battery life by $31\%$ against bidding full capacity, for $2.2\%$ of the revenue. Giving up a perfect score in operation lengthens the battery life of constant bids by $10\%$ to $27\%$, at a change in revenue of at most $0.2\%$.

0.30