CS Paper Radar

Computational Complexity and Exact Algorithms for Pressure-Driven Hydrogen Charging

Nanase Sato, Wei Wu, Mutsunori Yagiura

cs.CC ·submitted 2026-10-16 23:32 UTC · v1
theoryunusual

Abstract

We study the problem of deciding the feasibility of pressure-driven hydrogen charging from supply cylinders to demand cylinders without replenishment, asking whether an order of transfers allows every demand cylinder to reach its target pressure. Hydrogen can be transferred from a cylinder to another only when the supply cylinder has higher pressure than the demand cylinder. The charging to each demand cylinder must be completed before starting another, and each transfer continues until the connected cylinders reach equal pressures or the demand cylinder reaches its target. We consider equal-capacity supply cylinders and arbitrary positive rational demand cylinder capacities. Let $n$ be the number of demand cylinders and $L$ the binary input length. With one supply cylinder, feasibility is decidable in polynomial time; with two, it is NP-complete even with cylinder capacities equal to $1$ and nonnegative integer pressures. We prove that feasibility is preserved even if the supply cylinders are always used in non-decreasing order of their current pressures when filling each demand cylinder. We also show that majorization of residual supply cylinder pressure states justifies discarding majorized states in dynamic programming over sets of completed demand cylinders without losing any feasible remaining demand cylinder order. With two supply cylinders, one state per completed demand cylinder set suffices, yielding $2^n\operatorname{poly}(L)$ time and space. With three, the exponential time hypothesis (ETH) excludes deterministic $2^{o(n\log n)}\operatorname{poly}(L)$-time algorithms. This lower bound is tight in the exponent because the rule for order of supply cylinders allows feasibility to be decided in $n!\operatorname{poly}(L)$ time by enumerating only demand cylinder orders.

Comment
32 pages

Closest papers

Nearest neighbours by meaning across the whole index.

Quantifying Linepack Storage Potential of Hydrogen Networks

eess.SY ·2026-10-29 ·Ulrike Herrmann, Hans Würfel, Albertus Johannes Malan, Anton Plietzsch, Johannes Schiffer
similarity 0.56
Abstract · 23 pages, 6 figures, submitted to the International Journal of Hydrogen Energy

Future hydrogen systems depend on large-scale storage to balance supply and demand. Hydrogen networks can store energy in the pipelines themselves, but the potential of this linepack storage has not been quantified comparably to dedicated storage facilities. We transfer metrics established for conventional storage, such as volume capacity and full-cycle equivalents, to hydrogen networks. To evaluate them, we formulate an optimization problem maximizing linepack storage utilization, subject to non-convex PDE-based constraints describing transient gas flow. We solve the optimization problem over a full-year horizon to capture seasonal variations and to assess the interaction with cavern storage. For computational tractability, we propose a simulation-informed sequential convex programming approach with adaptive time stepping that reduces problem size by up to 98% at accuracy comparable to fixed-resolution methods. For the GasLib-40 topology with German scenario data, the network provides a volume capacity of 24 million normal cubic meters at 28 full-cycle equivalents per year.

0.34

Job Scheduling with Battery Recharging Constraints

cs.DS ·2026-10-01 ·Rudransh Kumar, Nima Nasiri, Jared Paul, Sathish Gopalakrishnan
similarity 0.51
Abstract

A battery-powered device, such as a delivery drone that works from a depot, must stop to recharge between jobs, and the time spent recharging delays every job that follows. Scheduling models that fix the duration of a recharge do not describe a device whose recharge takes longer when it acquires more energy. We study a single device that executes a batch of non-preemptive jobs with known execution times, energy demands, and optional deadlines. Under \emph{partial recharging} the device may acquire any amount of energy between jobs; under \emph{complete recharging} every recharge fills the battery. Four objectives and four relationships between execution time and energy demand give 32 variants. When acquiring $q$ units of energy takes $q$ time units, we show that 14 of the 16 partial-recharging variants are polynomial, and we give a tight 2-approximation for the average completion time, one of the two NP-hard variants. Under complete recharging, the four variants with equal energy demands are polynomial and the other 12 are NP-hard; for makespan we give a $5/4$-approximation. When each recharge also incurs a fixed \emph{setup time} $h$, the equal-energy variants remain polynomial and the other 24 are strongly NP-hard if $h$ is part of the input. For these we give exact algorithms that are exponential only in the number of jobs, and approximation algorithms for makespan and, when the battery starts empty, for the weighted average completion time. Experiments on synthetic and trace-derived job sets compare the algorithms with exact optima. The model is offline and deterministic, and we have not validated the schedules on hardware.

0.21

MAC+: Mobility-Aware Co-Expansion Planning for Distribution Grid and Electric Vehicle Charging Infrastructure

eess.SY ·2026-11-09 ·Yi Ju, Lunlong Li, Jingchun Wang, Scott Moura
similarity 0.50
Abstract · 20 pages, 6 figures, 7 tables

We study the least-cost co-expansion of power distribution networks and public charging ports to accommodate the growth of electric vehicles (EVs). Our approach, MAC+, exploits the flexibility of charging along each EV's itinerary and coordinates it across the fleet to reduce the peak violations of each feeder's hosting capacity and port capacity. This coordination is an extremely large, spatio-temporally coupled optimization problem with binary plug-in variables. We solve it by iterated price response (IPR), which repeatedly posts a two-tier tariff on feeder load and port occupancy, lets millions of EVs best-respond in parallel, and certifies the optimality gap at every iteration. We develop a custom exact dynamic-programming algorithm that solves each EV's best-response problem, a mixed-integer quadratic program, about 20 times faster than off-the-shelf solvers. The case study covers the San Francisco Bay Area at 30% EV adoption, with 1.8 million EVs on week-long itineraries and 1,303 feeder service regions, each with a utility-published hosting capacity and a port capacity set by its existing public ports. On this instance, IPR reaches a certified gap below 10% in a few hours. MAC+ saves about $15 billion of the upgrade investment that unmanaged charging would require. It also needs over 90% less investment than charging that is fully coordinated but flexible only within each session, and over 80% less than charging that is flexible along the itinerary but uncoordinated.

0.33

Robust Joint Planning of EV and eBus Charging Infrastructure with PV Self-Consumption under Demand Uncertainty

eess.SY ·2026-08-19 ·Biswarup Mukherjee
benchmark similarity 0.50
Abstract · This manuscript has been submitted for peer review

This paper presents a mixed-integer linear programming (MILP) framework for joint electric vehicle (EV) and electric bus (eBus) charging-infrastructure planning with photovoltaic (PV) self-consumption. The model co-optimizes charger siting, sizing, technology selection, eBus-to-depot assignment, and hourly charging schedules. A deterministic MILP is first formulated as a nominal benchmark and then extended to a scenario-based robust min--max formulation under vehicle energy-demand uncertainty. The robust model uses shared first-stage infrastructure decisions and scenario-specific operating decisions, and minimizes infrastructure cost plus the worst-case scenario operating cost through an epigraph reformulation. Soft-feasibility penalties quantify unmet charging energy, terminal state-of-charge (SOC) shortfall, and capacity violations under stressed scenarios. A 50-node case study shows that route-segment eBus demand and PV weighting alter charger deployment, technology mix, and grid import, while V2G enables hard-feasible robust operation at sufficiently large penalty weights. These results highlight that effective long-term infrastructure planning must simultaneously account for diverse vehicle fleets, operational strategies that adapt to different scenarios, and node-level constraints on charging capacity.

0.19

Extending Tardos's Theorem to Separable Convex Quadratic Programming

cs.DS ·2026-10-05 ·Bin Cui, Hanqing Li, Xupeng Miao
theory similarity 0.50
Abstract · 13 pages, no figures. Substantially revised with a simplified algorithm and proofs. Title and author list updated

For an integer equality matrix $A\in\mathbb{Z}^{r\times m}$ of binary encoding length $\langle A\rangle$, Tardos's theorem solves linear programs using $\operatorname{poly}(r,m,\langle A\rangle)$ rational arithmetic operations and comparisons, independently of the right-hand side and objective coefficients. We extend this guarantee to continuous separable convex quadratic programming over $Ax=b$, $x\ge0$: the operation count is independent of the right-hand side, linear costs, and all nonnegative quadratic weights. The algorithm returns an exact optimal primal-dual pair or a certificate of infeasibility or unboundedness. All intermediate rational numbers have encoding lengths polynomial in the total input length. As an application, we obtain a strongly polynomial algorithm for continuous multicommodity flow with shared capacities and quadratic costs of aggregate arc flow, independently of demands, capacities, and cost coefficients. Objective compression and continuous-integer proximity yield a local solver returning a point close to an optimum. We relax nonnegativity on coordinates with zero optimal dual slack, minimize the largest remaining coordinate, and optimize over the relaxed coordinates. A descent LP over the recession cone provides a complementary bound. Circuit decomposition combines these bounds into a scale ensuring that each local call reveals a new coordinate. At most $m$ calls, followed by two LPs, recover an exact optimum and its dual certificate.

0.20

Grid Theory and Polynomiality in Dynamic Lot-Sizing

cs.DM math.OCcs.DSmath.CO ·2026-10-02 ·El-Mehdi Mehiri, Nabil Absi, Elodie Suzanne
theory similarity 0.49
Abstract

Why are some dynamic lot-sizing problems polynomial? We address this question by introducing Grid Theory, a structural framework based on cumulative production and the additive structure of production bounds. For a general single-item dynamic lot-sizing model with lower and upper production bounds, there exists an optimal extreme solution in which, within each regeneration interval, all but at most one production quantity lie on a boundary value. This induces additive grids, and the Main Grid Theorem establishes that an optimal cumulative production trajectory can be restricted to these discrete sets. Although the resulting grids may be exponentially large, we introduce the notion of additive dimension to capture production-bound profiles whose boundary sums admit a low-dimensional representation. We show that bounded additive dimension yields a polynomially constructible grid envelope and a polynomial time grid-based dynamic programming algorithm. The framework extends to separable concave costs and establishes polynomial solvability of several families, including constant capacities, minimum order quantities, a fixed number of capacity levels, fixed-degree polynomial capacities, periodic capacities, and piecewise polynomial capacities. In particular, polynomiality may hold even when the number of distinct capacity values grows with the planning horizon. Grid Theory thus identifies additive structure, rather than the number of distinct resource values, as a sufficient mechanism for polynomial solvability.

0.27

Asymmetric Weighted Earliness-Tardiness: Scheduling with a Nonrestrictive Common Due Date

cs.CC math.OCcs.DMmath.CO ·2026-09-12 ·Nicholas G. Hall, Hans Kellerer, Miao Song
similarity 0.49
Abstract · 268 pages, 12 figures, 29 tables

Single-machine asymmetric weighted earliness--tardiness (AWET) scheduling asks how to sequence jobs around a common synchronization date when early and late completion incur unrelated job-dependent penalties. At the boundary nonrestrictive date $d=\sum_jp_j$, a compact V-shaped schedule reduces the continuous-time problem to a quadratic choice of a nonempty early set. We establish four complementary results for this model. First, the positive-integer problem is strongly NP-complete by a unary-polynomial reduction from Restricted Exact Cover by 3-Sets. Second, unrestricted AWET admits a polynomial-time $(3+2\sqrt2+\varepsilon)$-approximation based on an anchored semidefinite relaxation and deterministic marginal thresholding. Third, when the earliness and tardiness ratio orders are strict reversals, the problem is weakly NP-complete but has an exact two-resource pseudopolynomial dynamic program. Fourth, for fixed total refinements whose ratio permutation is separable, an exact separating-tree recurrence and coordinated geometric trimming yield an FPTAS. The proofs use different manifestations of the same canonical objective: scale-separated prefix penalties, positive-semidefinite minimum-kernel covariance, a dominant completed load square, and a bounded four-coordinate decomposition interface. Together, the results show that the decisive issue is not merely whether the two ratio orders agree, but whether their interaction can be controlled by a global certificate or compressed into a bounded constructive interface.

0.21

The Complexity of Computing a Competitive Equilibrium in Fisher Markets with Chores

cs.GT ·2026-11-08 ·Christian Kroer, Ruta Mehta, Tianlong Nan
theory similarity 0.48
Abstract

We study the complexity of computing competitive equilibria in Fisher markets with divisible chores and positive rational disutility coefficients and earning requirements. For linear disutilities, we prove that exact equilibrium computation is CLS-complete. In particular, the problem remains CLS-hard even when the earning requirements are binary in $1$ and $2^k$, where $k$ is an integer. We prove hardness by encoding the first-order conditions of a box-constrained quadratic program in equilibrium prices and earning flows, using a compact minimum-cost flow construction. For convex constant-elasticity-of-substitution (CES) disutilities, exact equilibrium prices may be irrational. We formulate the problem of finite-precision equilibrium price computation, in which we seek rational prices with a certified market clearing error at most a given rational tolerance encoded in binary. We prove that this problem is CLS-complete for every fixed rational exponent $ρ>1$. To prove this hardness, we encode a quartic polynomial through the fourth-order expansion of the CES price potential function corresponding to the Eisenberg-Gale (EG) dual program, and show that every sufficiently accurate approximate equilibrium of the constructed market lies near uniform prices. Additionally, we also identify a tractable special case of chores Fisher markets. In particular, we provide a strongly polynomial algorithm for exact equilibrium computation in linear markets whose disutility matrix has rank at most two and earning requirements are arbitrary positive rationals. For $n$ agents and $m$ chores, the algorithm uses $O(nm(n+m))$ rational arithmetic operations and comparisons, with polynomial intermediate encoding length.

0.14