CS Paper Radar

Three-phase time minimization transportation problem with non-idle phases: a polynomial two-witness algorithm

Sailesh Kamalahasan, Raghav Paladugu, Archana Khurana

cs.DS math.OC ·submitted 2026-11-01 00:47 UTC · v1
theory

Abstract

The three-phase time minimization transportation problem partitions the origin-terminal links into three sets used in consecutive phases and minimizes the sum of the phase shipment times. Optimal solutions may leave a phase idle, as in the main example of the original study. We require every phase to carry a positive integer quantity while leaving the split of the total requirement across phases free. Discarding idle solutions from the original algorithm does not, in general, solve this variant. We prove that the optimum is attained by fixing one witness link in each of two phases and deciding the third phase by a single network flow computation, with the optimal Phase-3 time of each witness pair located by binary search. The resulting exact algorithm is strongly polynomial. It extends to any fixed number of phases, whereas, when the number of phases is part of the input, even non-idle feasibility is strongly NP-complete; feasibility alone is fixed-parameter tractable in the number of phases via known rainbow-matching results. We also characterize the minimum time of each phase. On the main example, non-idleness raises the optimum from 38 to 41. On 3,650 random instances with up to $50\times50$ links the algorithm took at most 50.2 seconds, and non-idleness raised the optimal value in 41% of the 2,250 instances with equal phase sizes; on 90 sampled instances it was faster than a mixed integer programming solver on 80 with a direct formulation and on 65 with a tighter threshold formulation.

Comment
44 pages (37-page main article and 7-page supplement), 0 figures; reproducibility code and data included as ancillary files

Closest papers

Nearest neighbours by meaning across the whole index.

Two-Machine Flow Shop with a Fixed Non-Availability Interval on the Second Machine

cs.DM ·2026-09-12 ·Hao Lu, Yuan Yuan, Xingwu Liu, Xin Han
theory similarity 0.62
Abstract

This paper investigates a two-machine permutation flow shop in which the second machine is unavailable during one fixed interval $[s,t]$. We consider the non-resumable setting: an operation interrupted by the interval must restart from the beginning after the machine becomes available. The objective is to minimize the makespan. We establish three results. First, we give a polynomial-time $10/7$-approximation algorithm. Second, we develop a pseudopolynomial-time exact dynamic program. Third, we prove that the problem does not admit a fully polynomial-time approximation scheme (FPTAS) unless $\mathrm{P}=\mathrm{NP}$, even when the non-availability interval has unit length. Together, these results characterize a distinctive complexity profile: exact optimization is possible in pseudopolynomial time, whereas the usual route from such an algorithm to an FPTAS is impossible unless $\mathrm{P}=\mathrm{NP}$. They also reveal an approximability separation from the corresponding non-resumable problem with the interval on the first machine.

0.19

Goal Staying Makes Sum-of-Costs Anonymous Multi-Agent Path Finding NP-Hard

cs.MA cs.CCcs.RO ·2026-08-21 ·Hang Ma
similarity 0.58
Abstract

Anonymous Multi-Agent Path Finding (AMAPF) admits polynomial-time network-flow algorithms for several objectives, including makespan, total distance, and sum-of-costs (SoC) when agents disappear upon reaching goals. We show that standard goal-staying AMAPF is fundamentally different. We first formulate SoC minimization by augmenting the standard time-expanded flow model with goal-settlement constraints and show that the resulting linear programming relaxation is non-integral. We then prove that minimizing SoC in goal-staying AMAPF is NP-hard via a reduction from 3-SAT. Together with the polynomial-time result for the disappearing variant, this establishes a sharp complexity boundary determined by whether completed agents remain at their goals.

0.23

A polynomial-time approximation scheme for the weighted Euclidean Minimum Latency Problem in fixed dimension

cs.DS math.CO ·2026-11-11 ·Daniel Skachkov, Yuriy Dorn
similarity 0.57
Abstract

In the Traveling Salesman Problem, a route must visit all customers and return to its starting point while minimizing its total length. The Minimum Latency Problem, also known as the Traveling Repairman Problem, instead minimizes the sum of the times at which customers are first visited. We give a deterministic polynomial-time approximation scheme for the weighted Euclidean Minimum Latency Problem in every fixed dimension, with arbitrary nonnegative customer weights. Our proof restricts the form of a solution in three steps, each with a controlled increase in cost. First, a decomposition based on Sitters' method assigns customers to phases that start and end at the root. Second, within each phase, we divide the route into a constant number of blocks and charge each customer at the end of its assigned block. The resulting objective is a nonnegative linear combination of block lengths. Third, we add an auxiliary dimension and use a fixed Minkowski norm to close each block path into a tour. Arora's closed-tour estimate then gives paths that cross the boundaries of a common dissection only at designated portals and a bounded number of times per face. A dynamic program optimizes the restricted objective, and projecting its paths back to the original space gives the final route. Rounding weights and coordinates keeps the state space polynomial.

0.30

Optimizing the Steady-State Travel Time of Nash Flows over Time with Capacity Increases

cs.DS ·2026-11-09 ·Niklas Dahlmeier, Paul Paschmanns, Laura Ritter, Ruben Skorupinski
similarity 0.57
Abstract

We study budgeted capacity augmentation for single-source single-sink \NFOTs under constant inflow $u_0$. The goal is to increase capacities on arcs subject to a global budget constraint in order to minimize the steady-state travel time in the network. We show that this problem is weakly NP-hard on series-parallel networks and provide an exact pseudopolynomial algorithm as well as a fully polynomial algorithm that attains the optimum travel time for budget $B$ while spending at most $B + \varepsilon\cdot\max\{B,u_0\}$. On general networks the problem becomes strongly NP-hard. Moreover, unless $\text{P} = \text{NP}$, for every fixed $\varepsilon \in (0,1)$, no polynomial-time algorithm can achieve the optimal steady-state travel time while exceeding the budget by at most a factor of $n^{1-\varepsilon}$. Lastly, we give structural properties about steady-state travel time under varying arc capacities. We identify capacity thresholds determined by subsets of $s$-$t$-cuts and show that the travel time is constant in the interior of the cells resulting from the corresponding hyperplane arrangement.

0.24

Generalized Flows over Time: Complexity, Structure and Algorithm

cs.DS ·2026-11-02 ·Siyuan Chen, Shengminjie Chen, Suixiang Gao, Zheyu Jiang, Dun Ma +1 more
publishedtheory similarity 0.57
Abstract · 43pages,7figures;An earlier version of this paper appeared at COCOON 2026

Generalized flows over time constitute a general network flow model that incorporates both transit times and flow losses or gains. We study their complexity, structure, and approximation. We prove that the generalized maximum flow over time problem remains NP-hard under standard binary encoding, even on lossy two-terminal series-parallel networks. The maximum temporally repeated restriction is APX-hard with general gains and NP-hard on lossy networks. We then consider the minimum source supply needed to satisfy a fixed sink demand within a given horizon, and prove that an optimal solution always exists without intermediate storage. On lossy networks, such a solution can additionally use only simple source--sink paths. These structural properties yield a fully polynomial-time approximation scheme via time condensation, with analogous schemes for generalized maximum flows over time and quickest flows with a source-supply budget.

0.38

A minimum witness for the 3/2 configuration-linear-program gap in two-weight graph balancing, unique at its size

cs.DS math.OC ·2026-08-13 ·Adam Y. Shavit
theorycode/data similarity 0.57
Abstract · 37 pages, 12 figures, 1 table. v3: corrects the infeasibility-verdict count behind the six-machine sweep (4,228,054, not 4,231,347), a false…

Restricted assignment minimizes makespan, the busiest machine's load, when each job has one size and a set of allowed machines. Its tightest studied relaxation is the configuration linear program, which fractionally gives each machine whole job sets that fit. Its integrality gap, the worst-case ratio of integral optimum to relaxation value, is open in general. On two-weight graph balancing (sizes 1 and 2, each job allowed on at most two machines) the gap is known: Jansen, Land, and Maack (2016) give both bounds. Their Table 1 instance attains 3/2, and their Corollary 11 bound of 2-s/b for sizes s < b matches it at {1,2}. We ask how small such an instance, a witness, can be. We give a six-job witness I* on the complete graph on four machines: unit jobs form a cycle through all four, and two weight-2 jobs take the remaining edges. I* has integral optimum 3 against relaxation value 2, one job fewer than the smallest earlier witness of this class. We prove I* minimum and unique at its size, on any number of machines: no instance with at most five jobs reaches gap 3/2, and at six jobs I* is the only witness, up to relabeling machines and adding unusable machines. At seven jobs uniqueness fails: we classify all thirteen witnesses, including the Jansen-Land-Maack instance. Eight jobs give 154, nine 1,662. At least four machines are necessary. Kartak et al. (2015) classified the extremal non-round-up instances of the same relaxation in one-dimensional cutting stock for small demand; the Discussion relates them. Recognizing witnesses at relaxation value 2, shared by all ours, is coNP-complete, so no min-max characterization with polynomially checkable conditions exists unless NP = coNP. Every feasibility decision behind the exhaustive claims was made twice, in floating-point and exact rational arithmetic, with identical results. We accept the pipeline's negatives only after it rediscovers I*.

0.64

Odd Cycle Transversal on $H$-free graphs

cs.DS cs.DMmath.CO ·2026-09-25 ·Esther Galby, Paloma T. de Lima, Andrea Munaro, Amir Nikabadi
similarity 0.56
Abstract

\textsc{Odd Cycle Transversal} is a classic $\mathsf{NP}$-hard graph optimization problem asking for a minimum-weight set of vertices whose deletion makes the input graph bipartite, or equivalently, a maximum-weight induced bipartite subgraph. We show that \textsc{Odd Cycle Transversal} is quasi-polynomial-time solvable on $kP_4$-free graphs, for every fixed $k \in \mathbb{N}$. In fact, we provide an $n^{O_k(\log n)}$-time algorithm for the more general \textsc{Max-Weight List $2$-Colorable Induced Subgraph}, where the notation $O_{k}(\cdot)$ hides factors depending on $k$. Paired with known results from the literature, this allows us to obtain a complete complexity dichotomy for these two problems on $H$-free graphs into cases solvable in quasi-polynomial time and cases which are $\mathsf{NP}$-hard, in particular resolving an open problem of Agrawal, Lima, Lokshtanov, Saurabh, and Sharma [SODA 2024]. Our algorithms are based on a new structural tool that may be of independent interest. We introduce the notion of $H$-amiable family and show that, for every fixed graph $H$ without isolated vertices and every fixed $k\ge2$, every $kH$-free graph admits an $H$-amiable family of quasi-polynomial size that can be constructed in quasi-polynomial time. Besides yielding the aforementioned algorithms, this result gives, for every fixed connected graph $H$ and every fixed $k\ge2$, a reduction from \textsc{Max-Weight Independent Set} on $kH$-free graphs to the same problem on $H$-free graphs with $n^{O_{H,k}(\log n)}$ overhead. In this setting, it improves the $n^{O_{H,k}(\log^3 n)}$ overhead obtained by specializing the general reduction of Gartland and Lokshtanov [FOCS 2020].

0.16

Strong NP-Hardness and Approximation Algorithm for Weighted Tardiness with Release Dates and Identical Processing Times

cs.CC cs.DMmath.CO ·2026-09-23 ·Zhi-Long Chen, Nicholas G. Hall
theory similarity 0.56
Abstract · 38 pages, 2 figures, 5 tables

We study nonpreemptive scheduling on a single machine with release dates, due dates, positive job weights, and a common processing time. The objective is to minimize total weighted tardiness. Although closely related equal-processing-time problems admit polynomial-time algorithms, the complexity of this problem has remained open in the literature since 2010. We prove that its decision version is strongly NP-complete, even when every job can meet its due date if processed immediately upon release. The reduction is from unweighted MAX-CUT and uses a quadratic number of jobs with polynomially bounded numerical data. Its main ingredient is a constructive normalization theorem that converts every sufficiently inexpensive feasible schedule into a binary choice for each graph vertex; after normalization, total weighted tardiness equals a constant minus a scaled cut value. We also give a deterministic polynomial-time phase-grid assignment algorithm for the shifted objective $Φ=F+p\sum_jw_j$, where $F$ is total weighted tardiness. The algorithm enumerates at most $N$ release-date residues modulo $p$, solves one minimum-cost assignment problem for each residue, and returns the best phase-grid schedule. It runs in $O(N^5)$ arithmetic operations and achieves the tight ratio $3/2-1/(2N)$ for this algorithm. Because the added term $p\sum_jw_j$ is independent of how the jobs are scheduled, the shifted and original objectives have exactly the same optimal schedules. However, the approximation guarantee applies to the shifted objective; for the original objective, the analysis provides an additive bound. Thus, the paper both resolves the long-standing complexity question and provides a complementary worst-case guarantee for the phase-grid assignment algorithm.

0.21