CS Paper Radar

An Optimized Expansion Auction Integrating Energy, Flexibility, and Network Constraints

Rafael Benchimol Klausner, Alexandre Street, Joaquim Dias Garcia, Luiz Barroso

eess.SY math.OC ·submitted 2026-11-11 22:51 UTC · v1

Abstract

Auction mechanisms are widely used to support generation investments. In the US, capacity auctions serve as supply-adequacy instruments to address the missing-money problem, whereas in Latin America, energy and capacity auctions procure long-term contracts to support generation expansion. In both settings, accreditation metrics, such as Firm Energy (FE) and Effective Load Carrying Capability (ELCC), are used to approximate the reliability contribution of selected units and winning projects are selected based on a financial offer. This approach fails to recognize the actual contribution of winners to the multiple services they provide to the system. This limitation becomes more significant with high shares of renewables, as the value of each resource increasingly depends on network and technological constraints, as well as on complementarities within the generation portfolio. Inspired by short-term auctions, such as day-ahead markets, this paper proposes a joint optimization-based auction for generation and transmission investments that internalizes these interactions, capturing the intrinsic value of generation candidates without requiring the computation of FE or ELCC metrics. The auctioneer determines the winning portfolio through an expansion-planning model that explicitly represents network constraints, operational interactions, reliability standards, and multiple scenarios. A case study of the Brazilian system indicates lower system costs, lower risk, and a more diverse portfolio relative to the stylized decoupled procurement approaches currently deployed in many systems.

Comment
10 pages, 3 figures, 3 tables

Closest papers

Nearest neighbours by meaning across the whole index.

Modeling of Network Constraints in Large-scale Capacity Expansion Optimization of Power Grids

eess.SY math.OC ·2026-08-28 ·Yu Weng, Lara Booth, Priya L. Donti, Ruaridh Macdonald
publishedtheoryhot direction similarity 0.63
Abstract

Capacity expansion modeling plays a critical role in optimizing the deployment of new generation, storage, and transmission, typically at national and regional levels. To support long-term planning, these models consider a large set of energy technologies and policies, along with decades of weather and demand data. Realistic capacity expansion models thus become high-dimensional optimization problems, with hundreds of millions of variables and constraints, which are challenging to solve. A common strategy to address this complexity is to omit non-linear, non-convex AC optimal power flow (ACOPF) constraints and instead use linearized power balance equations or transport formulations. While these simplifications improve tractability, they limit our understanding of how power flow and the physical properties of power networks impact investment decisions across generation, storage, and transmission infrastructure. This paper addresses this gap by extending the GenX capacity expansion model to incorporate fixed point theorem-based network constraints. These embed ACOPF-based considerations while maintaining the tractability of the planning model, nearly preserving the dimensionality of the transport formulation and incurring only modest runtime increases. This approach is much cheaper than embedding ACOPF directly, making it appropriate for large-scale capacity planning problems. We compare our approach to the original transport-based GenX model as well as a non-linear, non-convex version that incorporates the full ACOPF constraints, for a case study of the ISO New England grid.

0.47

Robust Procurement Planning for Community Choice Aggregators: Managing Market Price Uncertainty

eess.SY ·2026-10-20 ·Manar Jaradat, James Himelic, Neha Patankar
code/data similarity 0.63
Abstract

Community Choice Aggregators (CCAs) play an important role in the energy transition by procuring renewable electricity for local communities while balancing affordability, resource adequacy, and clean-energy requirements. In California, these long-term procurement decisions are coordinated through integrated resource planning (IRP). However, conventional IRP frameworks typically represent wholesale electricity prices deterministically, even though price uncertainty can expose CCAs to substantial financial risk by affecting the cost of market imports and, particularly, the value of export opportunities. This paper develops a robust optimization framework for CCA resource procurement that hedges against uncertainty in wholesale import and export prices. We extend the open-source GenX capacity expansion model with a budgeted robust optimization formulation that protects procurement decisions against adverse price realizations while remaining computationally tractable for large-scale, multistage planning studies. Using data from a California CCA, we show that market price uncertainty can materially change optimal procurement strategies. Rather than aggressively expanding renewable capacity based on expected export revenues, robust portfolios reduce dependence on uncertain market revenues, leading to more conservative renewable investments and less reliance on market exports. We demonstrate that moderate uncertainty budgets provide most of the risk-reduction benefits of robust planning at limited additional cost, whereas higher robustness levels yield diminishing benefits as portfolio conservatism increases. These findings provide guidance for selecting uncertainty budgets in IRP studies and demonstrate how robust optimization can support affordable and resilient procurement decisions as CCAs contribute to the transition toward low-carbon electricity systems.

0.40

Co-optimizing Bidding and Power Allocation of an EV Aggregator Providing Real-time Frequency Regulation Service

eess.SY ·2026-08-25 ·Ruike Lyu, Hongye Guo, Kedi Zheng, Mingyang Sun, Qixin Chen
top venuehighly cited similarity 0.61
Abstract · Published in: IEEE Transactions on Smart Grid ( Volume: 14, Issue: 6, November 2023)

The rapidly expanding scale of electric vehicle (EV) fleets and continuously decreasing battery costs are making vehicle-to-grid services a reality. In this paper, we study the interaction between the problems of an EV aggregator's bidding in the regulation market and power allocation (i.e., determining the (dis)charging powers of the EVs in regulation deployment). Although the two problems are coupled, they are often regarded as decoupled and optimized separately for complexity issues. However, failing to consider the coupling of bidding and power allocation can lead to a decline in the profit of the EV aggregator (EVA). In this paper, we propose a framework for co-optimizing EVA bidding and power allocation in the regulation market. The bidding model is formulated as a stochastic programming problem with embedded power allocation in discretized regulation signal scenarios. To meet the solution time requirement for regulation deployment, we further propose a power allocation model that can be solved online. It utilizes the Lagrange multipliers from the bidding problem to ensure that the allocation results correspond to the optimal solution of the bidding problem. The effect of the proposed framework on improving EVA profits and reducing degradation costs is verified in the case study.

0.67

On the Convexity of Common Resource Adequacy and Capacity Accreditation Metrics

eess.SY ·2026-11-03 ·Gord Stephen
similarity 0.60
Abstract

Many emerging capacity expansion optimization formulations implicitly presume the convexity (or concavity) of power system adequacy risk (or capacity accreditation) metrics. These assumptions have yet to be formally justified. We present concise mathematical proofs validating the claim for certain metrics (expected unserved energy and effective load carrying capability), but also provide simple invalidating counterexamples for others (loss-of-load expectation and equivalent firm capacity). Formulations built on non-convex (non-concave) metrics structurally undervalue candidate portfolio adequacy, and so cannot claim to produce least-cost expansion plans.

0.25

Integrating Fast-response Capability into Virtual Power Plant Operation for Ancillary Services

eess.SY ·2026-08-26 ·Qixing Liu, Ruike Lyu, Zhe Zhai, Yan Shen, Xue Liu +1 more
published similarity 0.59
Abstract · Published in: 2025 IEEE Kiel PowerTech

Virtual power plants (VPPs) can aggregate distributed energy resources (DERs) to provide ancillary services for power systems, creating new profit opportunities. Ancillary services such as secondary frequency regulation require providers to have sufficient response capability to follow rapidly changing control commands. If overlooking the response requirement, the VPP will not be able to accurately measure its regulation capability, reducing its earnings in performance-based markets or risking disqualification. This paper integrates the requirement for fast-response capability into the operational framework of VPPs providing ancillary services. We leverage historical control commands to formulate chance constraints in the bidding model, mandating that the VPP's fast-response capability meets the requirement of ancillary services with a specified probability. Case studies verify that considering fast-response capabilities can enhance VPP operation.

0.62

Trust-Region Benders for Scalable Multiperiod Expansion Planning for Transmission and Storage

eess.SY ·2026-10-23 ·Kevin Wu, Rabab Haider, Pascal Van Hentenryck
published similarity 0.58
Abstract · Presented at PowerUp 2026, September 9-11, 2026, Boulder, Colorado

Transmission expansion planning (TEP) seeks to identify cost-effective investment strategies that enable power systems to reliably meet future demand, while accounting for the location, timing, and operational impacts of infrastructure upgrades. As demand grows and renewable penetration increases, there is growing interest in jointly modeling energy storage investments to enhance operational flexibility. This work presents a multiperiod formulation that co-optimizes transmission reconductoring and energy storage installation across multiple planning periods. To solve the resulting large-scale problem efficiently, a Benders decomposition with per-period trust-region stabilization and a relaxation-based warm-start procedure is proposed. The approach is demonstrated on a 2,000-bus Texas system, producing an investment plan spanning 2030-2045 with optimality gap below 1.0%, and is compared against a rolling-horizon approach to highlight the benefits of multiperiod coordination.

0.29

Co-Optimized Generation, Transmission, and Storage Expansion: System Value and Optimal Duration of Pumped-Storage Hydropower

eess.SY math.OC ·2026-08-27 ·Rafael Benchimol Klausner, Rafael Kelman
similarity 0.58
Abstract

Expansion planning models usually fix storage duration before optimization, setting how much storage power to build but not for how long it can discharge. We present a generation-transmission-storage expansion framework in which candidates of many durations compete on annualized cost, making the duration mix an optimization outcome. It is a rolling-horizon, two-stage stochastic linear program, each five-year stage is a full year at hourly resolution under ten coherent inflow, wind, and solar scenarios. We apply it to the Brazilian Interconnected System over 2030-2050, where demand roughly doubles to 1,716 TWh/year and variable renewable energy (VRE) supplies most new capacity. Two cases are compared: 36 pumped-storage hydropower (PSH) candidates over four subsystems and nine durations (4-144 h) alongside 4-h battery energy storage systems (BESS), and BESS alone. With PSH available, the model builds 31.2 GW / 755 GWh of PSH and no BESS, dominated by 12-h capacity with 4.9 GW of 72-h units. Without PSH it builds 38 GW / 152 GWh of BESS and 7.8 GW more gas-fired capacity, mostly open-cycle peakers. PSH lowers 2050 annualized system cost by US$ 5.0 billion/year (6.8%), operating cost by 23.5%, thermal generation by 34 TWh/year, and long-run marginal cost by 20%; 2035 VRE curtailment falls from 8.4% to 3.2%. The magnitudes are specific to Brazil, but the underlying mechanism is general: limiting storage candidates to a single duration understates the system's optimal energy-storage requirement and overstates its residual need for thermal capacity.

0.30

On the Concept of an Optimal Portfolio of Uncertain Flexible Loads

eess.SY ·2026-09-04 ·Julie Rousseau, Philipp Heer, Kristina Orehounig, Gabriela Hug
published similarity 0.57
Abstract · Accepted to the 2026 PowerUp conference

Flexible loads can enhance power system stability by providing reserves, but their limited energy capacity and uncertain availability distinguish them from conventional generators. To accommodate these characteristics, the Danish Transmission System Operator (TSO) recently introduced new reserve market rules that incorporate energy constraints and relax reliability requirements. In this context, the optimal reserve quantification becomes a joint chance-constrained reserve quantification problem, which is difficult to solve. In this paper, we derive two analytical reformulations of this problem: an exact one when a reserve direction dominates and an approximate one, otherwise. Furthermore, when flexible loads must collectively satisfy a reliability requirement, we introduce the concept of an optimal portfolio of flexible loads: adding loads with similar expected values but different stochastic behaviors to an existing portfolio may change the total portfolio's reserves. To support this idea, we theoretically study the marginal increase in reserves resulting from adding a load. Numerical results show that our analytical reformulations closely match the exact formulation, with a mean absolute error of 2.5%. Case studies further demonstrate the existence of optimal load groupings and our ability to predict the portfolio in which a load's marginal value is highest, leveraging our theoretical analysis.

0.43