CS Paper Radar

Probabilistic Power Estimation and MPC-based Scheduling of Construction Electric Vehicles Supported by Mobile Charging Stations

Shubhan Mital, Avik Ghosh, Daniela Rojas, Sujit Dey, Yuanyuan Shi

eess.SY ·submitted 2026-11-16 01:39 UTC · v1
code/data

Abstract

The adoption of construction electric vehicles (CEVs) is held back by sparse on-site charging infrastructure, limited mobility, and insufficient knowledge of their power consumption. Mobile charging stations (MCSs) towed between grid connection points and construction sites address the first barrier, yet scheduling them optimally requires an accurate estimate of the CEV power consumption. In this paper, we address these gaps, first, by estimating the power of each subactivity of a representative CEV (a compact electric excavator) based on real-world construction demonstration data. We use Bayesian linear regression to obtain the subactivity power distributions, accounting for their operational uncertainty. Second, we formulate a mixed-integer program that jointly schedules CEV work and charging together with MCS routing, charging, and discharging, optimizing electricity costs, carbon emissions, work completion, and MCS travel. We embed the optimizer in a shrinking-horizon model predictive control (MPC) loop to perform real-time control on the CEV-MCS system. Two MPC variants, one a certainty-equivalent MPC (CE-MPC) controller, and the other a scenario-based MPC (SB-MPC) controller, are compared in closed-loop against an open-loop day-ahead schedule. Realistic simulations show that SB-MPC performs the best, lowering the operating costs by $60.2\%$ relative to the open-loop baseline, and by $23.3\%$ relative to CE-MPC, demonstrating the efficacy of incorporating predictive control with feedback. The code is available at https://github.com/Shubhanflash22/CEV-MCS-MPC-Joint-Scheduling

Comment
5 pages, 2 tables; Submitted to IEEE PESGM 2027

Closest papers

Nearest neighbours by meaning across the whole index.

Power Estimation and Optimal Work-Charging Scheduling of Construction Electric Vehicles via Mobile Charging Stations

eess.SY ·2026-08-19 ·Avik Ghosh, Akın Taşcıkaraoğlu, Daniela Rojas, Muhammed A. Beyazıt, Mohammad Reza Salehizadeh +6 more
code/data similarity 0.83
Abstract · Submitted to IEEE Transactions on Smart Grid

Construction electric vehicles (CEVs) are a promising clean alternative to diesel-powered construction equipment, but their adoption is constrained by sparse onsite charging infrastructure, limited CEV mobility, and insufficient understanding of their power consumption. We address these gaps through a field-data-driven framework coupling CEV power estimation with mobile-charging-aware work scheduling. First, using a real-world construction demonstration at the University of California, San Diego, we develop and validate a per-subactivity power estimation model for a compact electric excavator. Manually labeled video is synchronized with coarse battery state-of-charge (SOC) telematics, and constrained nonnegative least squares is used to recover each subactivity's average power consumption. The model predicts held-out test data within $17\%$ normalized mean absolute error (NMAE), and the accompanying dataset is released publicly. Second, leveraging the subactivity power estimates, we formulate a mixed-integer program that jointly optimizes CEV work and charging schedules together with the location, timing, and charging/discharging of mobile charging stations (MCSs) serving the CEVs. The optimization accounts for energy and demand charges, carbon emissions, unmet work penalties, MCS travel, and the physical and operational constraints of the CEVs and MCSs. Across realistic scenarios drawn from the demonstration, the proposed co-optimization attains the lowest operating cost in every case, being $7$--$96\%$ below the best-performing baseline, while solving most instances to proven optimality within an hour. Dataset and scripts are available at https://github.com/ghosh-avik/CEV-MCS-Power-Estimation-and-Joint-Scheduling.

0.38

Data-Driven Robust Dynamic Wireless Charging Lane Planning with Tunable Profit--Risk Trade-off and Modified User Equilibrium

eess.SY ·2026-11-10 ·Xin Cui, Yujun Lin, Ziang Liu, Francis Yunhe Hou, Wei Liu
similarity 0.65
Abstract · 10 pages

Dynamic wireless charging (DWC) has attracted increasing attention as a complement to conventional plug-in charging for electric vehicles (EVs). However, existing planning methods for dynamic wireless charging lanes (DWCLs) overlook realistic EV routing and charging behavior and lack explicit out-of-sample risk control under traffic-demand and renewable-energy uncertainties. To address these limitations, this paper proposes a data-driven two-stage robust planning framework that coordinates DWCL deployment with the operation of coupled traffic--power networks (CTPNs). A data-driven uncertainty set is constructed from joint historical scenarios to preserve spatio-temporal correlations without imposing parametric distributional assumptions. A modified user-equilibrium (MUE) model is proposed to capture realistic EV routing and charging behavior by incorporating state-of-charge (SoC) dynamics and endogenous charging decisions. The resulting two-stage robust model with mixed-integer recourse is reformulated as an equivalent single-stage scenario-approach problem and solved using a customized nested column-and-constraint generation algorithm. An \textit{a posteriori} feasibility guarantee is established to quantify out-of-sample risk. Based on this guarantee, the scenario set is iteratively enriched to meet a prescribed risk tolerance. Case studies on a 69-node power distribution network and a 24-node traffic network demonstrate that the proposed MUE model prevents overinvestment in DWCLs, while the proposed risk-quantification procedure enables a tunable profit--risk trade-off.

0.21

Analyzing Simultaneous Charging Factors of Electric Vehicles Using Monte Carlo Simulation: A Case Study in Phu Quoc City, Vietnam

eess.SY ·2026-11-04 ·Tien Khai Nguyen, Trong Nghia Le
published similarity 0.64
Abstract · 11 pages, 17 figures. Accepted for publication in GMSARN International Journal (expected in Issue 3, 2027). Author-prepared accepted manuscr…

This study estimates the simultaneous charging factor (SCF) of electric vehicles (EVs) in Phu Quoc City, Vietnam, using a Monte Carlo simulation. Three planning scenarios (2030, 2035, and 2040) are developed from population-based EV uptake assumptions and vehicle-specific charging probability profiles over 24 hours, reflecting distinct operating patterns of motorbikes, cars, taxis, and buses. For each vehicle class and scenario, 1,000 simulation runs are performed to compute SCF and its uncertainty, reported via 95% confidence intervals. Results indicate that SCF decreases as EV penetration increases, implying more temporally dispersed charging demand and a reduced likelihood of extreme coincidence. For electric buses, SCF declines from 0.76 (2030) to 0.59 (2040), and other vehicle groups show similarly decreasing trends across the horizon. These SCF estimates provide practical inputs for grid-aware charging infrastructure planning, including diversity factors for sizing distribution transformers and feeders, identifying peak-hour stress, and informing demand management measures such as time of use tariffs and basic smart charging controls.

0.68

Robust Joint Planning of EV and eBus Charging Infrastructure with PV Self-Consumption under Demand Uncertainty

eess.SY ·2026-08-19 ·Biswarup Mukherjee
benchmark similarity 0.64
Abstract · This manuscript has been submitted for peer review

This paper presents a mixed-integer linear programming (MILP) framework for joint electric vehicle (EV) and electric bus (eBus) charging-infrastructure planning with photovoltaic (PV) self-consumption. The model co-optimizes charger siting, sizing, technology selection, eBus-to-depot assignment, and hourly charging schedules. A deterministic MILP is first formulated as a nominal benchmark and then extended to a scenario-based robust min--max formulation under vehicle energy-demand uncertainty. The robust model uses shared first-stage infrastructure decisions and scenario-specific operating decisions, and minimizes infrastructure cost plus the worst-case scenario operating cost through an epigraph reformulation. Soft-feasibility penalties quantify unmet charging energy, terminal state-of-charge (SOC) shortfall, and capacity violations under stressed scenarios. A 50-node case study shows that route-segment eBus demand and PV weighting alter charger deployment, technology mix, and grid import, while V2G enables hard-feasible robust operation at sufficiently large penalty weights. These results highlight that effective long-term infrastructure planning must simultaneously account for diverse vehicle fleets, operational strategies that adapt to different scenarios, and node-level constraints on charging capacity.

0.19

Incorporating Bounded Rationality into Electric Vehicle Highway Charging Decisions: A Bayesian Game Analysis

cs.GT eess.SY ·2026-08-17 ·Huanyu Yan, Xiaoying Tang
publishedtheorycode/datahighly cited similarity 0.63
Abstract · Published in IEEE Internet of Things Journal, vol. 12, no. 11, pp. 15249-15260, 2025. An earlier version appeared in Proc. 14th ACM Internat…

Electric vehicles (EVs) represent a critical intelligent terminal within the Internet of Things (IoT). Despite the year-on-year growth in EV penetration, the highway driving experience still requires improvement. Accurate prediction of EV highway charging behavior is crucial to addressing this issue. This paper introduces a novel bounded rationality framework to analyze highway charging decisions. Specifically, we utilize prospect theory to capture the tendency of drivers to reserve more electricity than theoretically necessary. We then propose a Bayesian game in which EV drivers, unaware of others' decisions, aim to minimize costs, including range anxiety, charging fees, and queuing time. To gain insights into the game, we prove the existence and uniqueness of the Bayesian Nash Equilibrium in two practical scenarios. Our numerical experiments, based on real-life data, demonstrate that drivers' risk aversion tendency significantly influence EV charging decisions, charging demand, queuing lengths at charging stations, and the departure rate on the highway network. Furthermore, our strategy reduces cumulative EV cost and CSs' charging costs compared to other benchmarks.

0.74

Distributionally Robust Chance-Constrained Reinforcement Learning for Home Energy Management under Electric Vehicle Uncertainty

eess.SY ·2026-10-18 ·Meng Yuan, Ye Wang, Yi Mei, Ramesh Rayudu, Alan Brent +2 more
similarity 0.61
Abstract

The electrification of residential energy systems and adoption of electric vehicles (EVs) create demand-side flexibility. However, random driving behaviour makes it difficult to ensure EV readiness at departure and maintain thermal comfort. To address this, we formulate residential scheduling as a distributionally robust (DR) chance-constrained Markov decision process, whose 2-Wasserstein ambiguity set guards against tail risk and distribution shift in EV behaviour. The intractable DR chance constraint is then replaced by a sufficient tightened expectation constraint under the nominal distribution. The resulting problem is solved by a Lagrangian soft actor--critic with distributional cost critics, and an online boundary guard enforces EV reachability and thermal comfort within the actuator limits at every step. Five controllers are compared over one year in Wellington, New Zealand, under a degraded forecast. The proposed controller is the cheapest controller that meets the EV target on every day and both chance constraints under forecast error and random driving behaviour. Compared with the rule-based baseline, the only other controller to do so, it lowers the annual cost by 8.6% and the comfort violation hours by 69%. The ablation study confirms that the boundary guard ensures pointwise feasibility within the actuator limits, and the DR chance constraint reduces tail risk.

0.16

Electric Vehicle Scheduling and Carbon-Aware Energy Dispatch for Charging Stations

eess.SY ·2026-10-27 ·Fulong Yao, Yiming Xu, Maurizio Albano, Liana Cipcigan, Naeima Hamed +2 more
similarity 0.61
Abstract

Electric vehicle (EV) charging stations integrating photovoltaic (PV) generation, battery storage, and bidirectional grid exchange must coordinate access to limited chargers with energy supply while considering both energy cost and carbon emissions. This paper proposes a solver-free greedy heuristic (SFGH) for dynamic vehicle scheduling (VS) and a twin delayed deep deterministic policy gradient (TD3) controller for carbon-aware energy dispatch (ED). SFGH assigns EVs according to reductions in service delays, and TD3 controls battery operation to balance energy costs and carbon emissions while meeting the resulting charging demand. The model allows both PV and battery exports, accounting for export revenue and carbon credits. Simulations on year-long case studies show that SFGH--TD3 achieves the lowest accumulated service delay, energy cost, and carbon emissions among the evaluated heuristic and multi-agent deep reinforcement learning (DRL) configurations.

0.24

Hours-of-service-aware siting of charging and battery-swapping stations for long-haul electric trucks under adoption uncertainty

cs.CE ·2026-10-06 ·Elnaz Irannezhad, Jia Guo
similarity 0.61
Abstract · 43 pages, 6 figures, 10 tables

Planning en-route charging and battery-swapping infrastructure for long-haul battery-electric trucks (BETs) requires models that reflect how trucks actually operate. This paper develops a mixed-integer programming framework that jointly sites charging or swapping stations and schedules each truck's charging, swapping and mandatory driver rest, so that charging time overlaps with regulated rest instead of being added to it. Energy use is derived segment by segment from road terrain with a tractive-force model, and the truck battery is modelled as a set of independently swappable packs. Staged investment under uncertain BET adoption is formulated as a multistage stochastic program with Markovian demand and solved by stochastic dual dynamic integer programming (SDDiP) with Lagrangian cuts; we show that the Lagrangian multipliers can be bounded by each station's annualised cost without weakening the cuts. Applied to twelve freight corridors on Australia's East Coast, the algorithm jointly optimises charging and battery-swapping events as well as mandatory break events. A +/- 30\% change in adoption alters the final charge-only network by only -12\% to +13\% of stations, with over 95\% of stations built by the second stage. Hedging against uncertainty mainly changes which sites are chosen (71\% overlap with a deterministic rolling-horizon model), not when they are built.

0.14