CS Paper Radar

Contiguous Monotone Moldable Job Scheduling

Bennet Edler, Klaus Jansen, Felix Ohnesorge

cs.DS ·submitted 2026-11-24 14:25 UTC · v1
theory

Abstract

In this paper, we address the Contiguous Monotone Moldable Job Scheduling (CMMJS) problem, where a set of jobs must be scheduled on parallel machines to minimize the overall makespan. Each job is characterized by a processing time function mapping the number of assigned machines to a processing time, such that the corresponding work area function is non-decreasing. Building upon the framework and critical cases identified by Jansen and Ohnesorge (2026), we present an improved analytical approach that yields a tighter approximation ratio of $\frac{2\sqrt{e}}{2\sqrt{e}-1}+\varepsilon \approx 1.4353+\varepsilon$ with a running time of $O(nm\log \frac{1}{\varepsilon})$. We prove that this worst-case analysis is essentially tight by providing a matching lower bound instance. This approximation ratio applies not only to contiguous scheduling but also to the non-contiguous variant of the problem. Finally, we demonstrate that our improved bounds extend naturally to heterogeneous environments; seamlessly integrating our results into an existing dual approximation framework for combined CPU/GPU scheduling by Germann~et~al.\ (2024) yields an improved overall approximation ratio of $\frac{2\sqrt{e}}{2\sqrt{e}-1}+\varepsilon$ for the joint problem.

Closest papers

Nearest neighbours by meaning across the whole index.

Minimizing Total Busy Time with Bounded Parallelism: A $3/2$-Approximation for Parallelism Two and a Forest Characterization for General Parallelism

cs.DS ·2026-11-24 ·Chi-Yeh Chen
similarity 0.74
Abstract · 23 pages, 2 figures, 8 tables; code in ancillary files

We study the minimum total busy time problem: jobs with fixed processing intervals must be assigned to identical machines, each of which can process at most g jobs at a time, so that the total time during which the machines are busy is minimized. The problem is NP-hard already for g=2, and, to the best of our knowledge, no approximation ratio below 2 was known for general instances with g=2, where the ratio 2 is attained by giving every job its own machine. We present a combinatorial 3/2-approximation algorithm for g=2. The algorithm applies the two-phase local-ratio technique to the known pair formulation of the problem, processing the overlapping job pairs in order of the right ends of their overlaps. The cost of its schedule is at most $L-λ/2$, where L is the total processing time and $λ$ is the optimal value of the linear relaxation of the pair formulation; hence the integrality gaps of this relaxation and of the configuration LP are at most 3/2. The result extends to temporal bin packing with items larger than one third of the bin capacity. For general g, we show that optimal schedules correspond exactly to maximum-weight forests of a special kind, which we call g-caterpillar forests; this yields an exact integer program and a linear relaxation of polynomial size for every fixed g. We also observe that securing a (1-1/g) fraction of the optimal savings suffices for a (2-1/g)-approximation. On random instances with g=2, evaluated with exact optima or tight lower bounds obtained from the pair formulation, the average ratio of the algorithm to the optimum is at most 1.075 for 100 jobs and at most 1.070 for 200 jobs.

0.46

Below Three: A 2.8027-Approximation for Moldable Precedence Scheduling

cs.DS ·2026-11-19 ·Klaus Jansen, Felix Ohnesorge
similarity 0.74
Abstract

We study makespan minimisation for nonpreemptive moldable jobs with arbitrary precedence constraints on identical processors. Each job runs on a chosen number of processors that remains fixed throughout its execution. Allocating more processors to a job can shorten its execution, but may increase total work and delay other jobs. We assume nonincreasing processing times, nondecreasing work, and a convex duration--work relation after dominated allocations are removed. This model includes jobs with concave speedup, for which Jansen and Zhang obtained a $3.291919\ldots$-approximation. Independently and concurrently with our work, Chen obtained a $3.016208\ldots$-approximation for the full convex model and a $2.973912\ldots$-approximation for concave speedup. We give a deterministic polynomial-time $2.8027$-approximation for the full convex model and every number of processors. Our result breaks the factor-three barrier for this model and also improves the approximation guarantee for concave speedup.

0.33

Coordinating Boundaries: Improved Approximation Algorithms for Unweighted Non-Preemptive Throughput Maximization

cs.DS ·2026-10-26 ·Weitian Tong, Yao Xu
similarity 0.71
Abstract · 34 pages, 8 figures

We study unweighted nonpreemptive throughput maximization: given jobs with processing times, release times, and deadlines, schedule a maximum-cardinality subset on identical machines. For every fixed $\varepsilon>0$, we give randomized algorithms with expected approximation ratios $17/13+\varepsilon$ in polynomial time and $21/17+\varepsilon$ in pseudopolynomial time. These improve the respective $4/3+\varepsilon$ and $5/4+\varepsilon$ guarantees of Armbruster, Grandoni, Tinguely, and Wiese [STOC'26]. Both results hold for an arbitrary number of identical machines. Our algorithms build on their configuration-LP and matching framework, which partitions time into blocks. For a job whose window meets multiple blocks, its boundary blocks are the first and last such blocks. Crossing boundary pairs, whose endpoints strictly interleave, permit additional assignments to sampled execution slots, while a noncrossing family can be coordinated using consistent joint distributions on at most three blocks. The exchange analysis accounts for fractional job assignments that must be erased before inserting an additional job. For the pseudopolynomial implementation, we project configurations onto selected job identities and use separate configuration distributions with common placement marginals. This retains efficient pricing while enforcing the correlations needed for coordination.

0.15

An EPTAS for Vector Scheduling with Time Intervals

cs.DS cs.CC ·2026-09-27 ·Junho Hwang
theory similarity 0.70
Abstract · 18 pages, 4 figures. v2: extended to several resources and unrelated machines, with a new title and simplified proofs

We study vector scheduling in which each job is active during a fixed time interval. A job uses several resources and stays on one machine for its entire interval; its resource requirements may depend on the machine. The objective is to minimize the largest resource load over all machines and times. For $r$ machines and $d$ resources, we give a deterministic $(1+\varepsilon)$-approximation in $f(r,d,1/\varepsilon)N^{O(1)}$ time, where $N$ is the binary input length. This gives an efficient polynomial-time approximation scheme for fixed $r$ and $d$, extending approximation schemes for scalar temporary tasks assignment. The algorithm merges jobs into blocks whose time intervals are fixed before any machine is chosen, and assigns the blocks by dynamic programming over a balanced recursive split of the time line. We also prove strong NP-hardness and an exponential lower bound in $1/\varepsilon$ under the Exponential Time Hypothesis, already for two identical machines and one resource.

0.13

Approximation algorithms for identical parallel machine scheduling with assignment costs

cs.DS ·2026-10-24 ·Wei Li
similarity 0.69
Abstract

We study non-preemptive scheduling on identical parallel machines in which assigning job $j$ to machine $M_i$ incurs the cost $c_{ij}=a_iw_j+b_j$. The processing times $p_j$ and the cost weights $w_j$ are independent, and the number of machines is part of the input. For every fixed $\varepsilon\in(0,1]$ and every deadline $T$ for which a schedule with makespan at most $T$ exists, we give a polynomial-time algorithm that computes a schedule with makespan at most $(1+\varepsilon)T$ whose total assignment cost does not exceed the minimum under the deadline $T$. Using this algorithm as a subroutine, we obtain a polynomial-time approximation scheme for minimizing the makespan under a total cost budget whose schedules always satisfy the budget; this answers an open question for costs $c_{ij}=l_ic_j$ with $c_j$ independent of $p_j$. For the lexicographic problem, in which the total assignment cost is minimized among all schedules of minimum makespan, we obtain in polynomial time a schedule with makespan at most $1+\varepsilon$ times the minimum and total assignment cost at most that of a lexicographically optimal schedule; this improves the makespan guarantees of earlier algorithms for additive and multiplicative costs. For costs $c_{ij}=s_i+a_iw_j$, where $s_i$ is charged for each job processed on $M_i$, the same guarantees are obtained in quasi-polynomial time.

0.24

Minimizing the Makespan Approximately on Two Identical Parallel Machines with a Loading--Unloading Server

cs.DS math.OC ·2026-08-19 ·Keramat Hasani, Frank Werner
theory similarity 0.69
Abstract · 29 pages, 1 appendix

We study makespan minimisation on two identical parallel machines that share a single server for both loading and unloading. Each job must be loaded, processed without interruption on its assigned machine, and unloaded immediately after processing, with a common positive integer duration for all loading and unloading operations. We prove that the decision problem is NP-complete for every fixed server-operation duration and strongly NP-complete when this duration is part of the input. We then analyse ordinary list scheduling and the longest-processing-time rule in the non-unit setting. List scheduling has a tight supremum ratio of two. For the longest-processing-time rule, we obtain the exact worst-case ratio when all processing times are at least the server-operation duration, and derive new parameter-dependent lower and upper bounds for unrestricted instances. The results show that both processing-time granularity and blocking generated by short jobs shape the approximation behaviour of the common-server problem.

0.08

Multidimensional Resource Scheduling with Small Demands

cs.DS ·2026-09-30 ·Yossi Azar, Rathish Das, Hao Sun
theory similarity 0.68
Abstract

We study multidimensional resource scheduling. Each job $i$ has a $d$-dimensional resource-demand vector $v_i$ and a processing time $s_i$. The scheduler assigns a start time to each job, subject to the constraint that, at every time, the total demand of the jobs being processed does not exceed $1$ in any resource dimension. The objective is to minimize the makespan. We focus on the regime in which every individual resource demand is small. We ask whether the favorable \emph{small-vector phenomenon} known for multidimensional vector packing, which corresponds to the special case of unit processing times, extends to jobs with heterogeneous processing times. The key difficulty is that arbitrary processing times create temporal interactions across multiple duration scales: a long job may overlap many shorter jobs, while feasibility must be maintained throughout every job's execution interval. We prove that the small-vector phenomenon persists in this temporal setting. For any $0<ε<1/4$, after normalizing the maximum processing time to $1$, if every coordinate of every demand vector is at most $O(ε^2/\log(d/ε))$, we give a randomized offline algorithm that produces a schedule with expected makespan at most $ (1+6ε)\mathrm{OPT}+3$. Thus, sufficiently small resource demands admit asymptotically near-optimal schedules in arbitrary dimension, despite heterogeneous processing times. We also obtain constant competitive ratios in the online setting. Let $T$ denote the ratio between the maximum and minimum processing times. If every coordinate is at most $O(1/(\log d\log T))$, we give a randomized $O(1)$-competitive algorithm, with a competitive ratio independent of both $d$ and $T$. We further derandomize our approach, obtaining a deterministic $O(1)$-competitive algorithm under a comparable smallness assumption.

0.13

Parallel Machine Scheduling with a Singler Server and Loading-Unloading Operations

cs.DS math.OC ·2026-08-12 ·Keramat Hasani, Frank Werner
theory similarity 0.68
Abstract · 20 pages, 3 figures

This paper investigates a parallel machine scheduling problem featuring a single common server responsible for both loading and unloading operations. Each job consists of a unit-time loading operation, non-preemptive processing on one of \(m\) identical machines, and a unit-time unloading operation executed by the same server. The objective is to minimize the makespan. Unlike classical loading-only common-server models, our setting requires the server to handle an unloading operation immediately after a job's processing phase concludes. We prove that the corresponding decision problem is strongly NP-complete when the number of machines is given as part of the input. Furthermore, we analyse the worst-case performance of the List Scheduling (LS) and Longest Processing Time (LPT) heuristics. For three machines, we establish that Algorithm LS achieves an approximation ratio of at most \(5/2\). For an arbitrary fixed \(m \ge 3\), we show that the general LS bound approaches \(4-3/m\) as the number of jobs grows, whereas for Algorithm LPT, we prove the finite-instance ratio $3-\frac{2}{m}+\frac{(m-1)(m-2)}{mn}.$ Thus, for each fixed \(m\), the LPT bound approaches \(3-2/m\) as the number of jobs grows.

0.38