CS Paper Radar

Minimizing Total Busy Time with Bounded Parallelism: A $3/2$-Approximation for Parallelism Two and a Forest Characterization for General Parallelism

Chi-Yeh Chen

cs.DS ·submitted 2026-11-24 06:32 UTC · v1

Abstract

We study the minimum total busy time problem: jobs with fixed processing intervals must be assigned to identical machines, each of which can process at most g jobs at a time, so that the total time during which the machines are busy is minimized. The problem is NP-hard already for g=2, and, to the best of our knowledge, no approximation ratio below 2 was known for general instances with g=2, where the ratio 2 is attained by giving every job its own machine. We present a combinatorial 3/2-approximation algorithm for g=2. The algorithm applies the two-phase local-ratio technique to the known pair formulation of the problem, processing the overlapping job pairs in order of the right ends of their overlaps. The cost of its schedule is at most $L-λ/2$, where L is the total processing time and $λ$ is the optimal value of the linear relaxation of the pair formulation; hence the integrality gaps of this relaxation and of the configuration LP are at most 3/2. The result extends to temporal bin packing with items larger than one third of the bin capacity. For general g, we show that optimal schedules correspond exactly to maximum-weight forests of a special kind, which we call g-caterpillar forests; this yields an exact integer program and a linear relaxation of polynomial size for every fixed g. We also observe that securing a (1-1/g) fraction of the optimal savings suffices for a (2-1/g)-approximation. On random instances with g=2, evaluated with exact optima or tight lower bounds obtained from the pair formulation, the average ratio of the algorithm to the optimum is at most 1.075 for 100 jobs and at most 1.070 for 200 jobs.

Comment
23 pages, 2 figures, 8 tables; code in ancillary files

Closest papers

Nearest neighbours by meaning across the whole index.

Contiguous Monotone Moldable Job Scheduling

cs.DS ·2026-11-24 ·Bennet Edler, Klaus Jansen, Felix Ohnesorge
theory similarity 0.74
Abstract

In this paper, we address the Contiguous Monotone Moldable Job Scheduling (CMMJS) problem, where a set of jobs must be scheduled on parallel machines to minimize the overall makespan. Each job is characterized by a processing time function mapping the number of assigned machines to a processing time, such that the corresponding work area function is non-decreasing. Building upon the framework and critical cases identified by Jansen and Ohnesorge (2026), we present an improved analytical approach that yields a tighter approximation ratio of $\frac{2\sqrt{e}}{2\sqrt{e}-1}+\varepsilon \approx 1.4353+\varepsilon$ with a running time of $O(nm\log \frac{1}{\varepsilon})$. We prove that this worst-case analysis is essentially tight by providing a matching lower bound instance. This approximation ratio applies not only to contiguous scheduling but also to the non-contiguous variant of the problem. Finally, we demonstrate that our improved bounds extend naturally to heterogeneous environments; seamlessly integrating our results into an existing dual approximation framework for combined CPU/GPU scheduling by Germann~et~al.\ (2024) yields an improved overall approximation ratio of $\frac{2\sqrt{e}}{2\sqrt{e}-1}+\varepsilon$ for the joint problem.

0.33

Minimizing the Makespan Approximately on Two Identical Parallel Machines with a Loading--Unloading Server

cs.DS math.OC ·2026-08-19 ·Keramat Hasani, Frank Werner
theory similarity 0.71
Abstract · 29 pages, 1 appendix

We study makespan minimisation on two identical parallel machines that share a single server for both loading and unloading. Each job must be loaded, processed without interruption on its assigned machine, and unloaded immediately after processing, with a common positive integer duration for all loading and unloading operations. We prove that the decision problem is NP-complete for every fixed server-operation duration and strongly NP-complete when this duration is part of the input. We then analyse ordinary list scheduling and the longest-processing-time rule in the non-unit setting. List scheduling has a tight supremum ratio of two. For the longest-processing-time rule, we obtain the exact worst-case ratio when all processing times are at least the server-operation duration, and derive new parameter-dependent lower and upper bounds for unrestricted instances. The results show that both processing-time granularity and blocking generated by short jobs shape the approximation behaviour of the common-server problem.

0.08

Faster Exponential Algorithms for Multi-Machine Scheduling Problems

cs.DS ·2026-08-12 ·Anubhav Dhar, Anita Dürr, Ahmed Ghazy, Jakob Greilhuber, Karol Węgrzycki
published similarity 0.70
Abstract

Minimizing the weighted completion times ($P \mid \mid Σw_j C_j$) and weighted number of tardy jobs ($P \mid \mid Σw_j U_j$) on multiple identical machines are two classical NP-hard scheduling problems. As shown by Lenté et al. (2014), both problems can be solved in time ${O}^{\star}(3^n)$. In this paper, we improve these bounds to ${O}(2.755^n)$ and ${O}^{\star}(2^n)$, respectively. Our algorithm for $P \mid \mid Σw_j C_j$ exploits the meet-in-the-middle paradigm and an efficient data structure answering linear programming queries. Additionally, when the number of machines is at most $6$, we show that the running time for $P \mid \mid Σw_j C_j$ can further be improved. Both scheduling problems are generalizations of the classical Bin Packing problem, which can be solved in ${O}^{\star}(2^n)$ time. Improving this running time is an important open question. We show that, when assuming the Asymptotic Rank Conjecture (ARC), Bin Packing can be solved in time ${O}((2-\varepsilon)^n)$ for some $\varepsilon >0$. Our algorithm makes use of two main ingredients: the recent ${O}((2-\varepsilon)^n)$-time algorithm of Nederlof et al. [SICOMP'23] for Bin Packing when the number of bins is a fixed constant, and the ${O}((2-\varepsilon)^n)$-time algorithm of Björklund et al. [SODA'25] for special instances of the $3$-way Partitioning problem when assuming ARC.

0.50

Parallel Machine Scheduling with a Singler Server and Loading-Unloading Operations

cs.DS math.OC ·2026-08-12 ·Keramat Hasani, Frank Werner
theory similarity 0.69
Abstract · 20 pages, 3 figures

This paper investigates a parallel machine scheduling problem featuring a single common server responsible for both loading and unloading operations. Each job consists of a unit-time loading operation, non-preemptive processing on one of \(m\) identical machines, and a unit-time unloading operation executed by the same server. The objective is to minimize the makespan. Unlike classical loading-only common-server models, our setting requires the server to handle an unloading operation immediately after a job's processing phase concludes. We prove that the corresponding decision problem is strongly NP-complete when the number of machines is given as part of the input. Furthermore, we analyse the worst-case performance of the List Scheduling (LS) and Longest Processing Time (LPT) heuristics. For three machines, we establish that Algorithm LS achieves an approximation ratio of at most \(5/2\). For an arbitrary fixed \(m \ge 3\), we show that the general LS bound approaches \(4-3/m\) as the number of jobs grows, whereas for Algorithm LPT, we prove the finite-instance ratio $3-\frac{2}{m}+\frac{(m-1)(m-2)}{mn}.$ Thus, for each fixed \(m\), the LPT bound approaches \(3-2/m\) as the number of jobs grows.

0.38

Scheduling with Mandatory Breaks: NP-Hardness and an Additive-One Approximation

cs.DS ·2026-09-28 ·Shreyas Ghildiyal, Muralidhara V N
similarity 0.69
Abstract

In classical fixed-interval scheduling, each job of a given set must be processed during a prescribed time interval. The goal is to assign each job to exactly one machine such that no two jobs assigned to the same machine overlap in their interiors, and the number of machines used is minimized. Without further constraints this is interval graph coloring and is solvable in polynomial time through greedy approaches. We study a variant in which every used machine must remain idle during a contiguous \emph{break} of prescribed length $x$ somewhere in the scheduling horizon. We show that this additional constraint makes the problem hard, except when $x\le1$. First, for every fixed $x\ge2$, deciding whether $k$ machines suffice for the assignment of a given set of jobs is NP-complete, even when all coordinates are bounded linearly in the number of jobs, so machine minimization is strongly NP-hard. Second, for $x=1$, we give a polynomial-time algorithm that solves the problem exactly. Finally, we give a deterministic polynomial-time algorithm that, on every feasible instance, outputs a schedule using at most $\OPT+1$ machines, where $\OPT$ is the true minimum. Unless $\mathrm{P}=\mathrm{NP}$, no polynomial-time algorithm guarantees $\OPT$ machines for any fixed $x\ge2$, so the additive guarantee of one is best possible.

0.07

Speed-Robust Scheduling for Total Completion Time

cs.DS cs.DM ·2026-11-16 ·Moritz Buchem, Nicole Megow, Morten Weber
similarity 0.67
Abstract

We study two-stage speed-robust scheduling for minimizing total completion time. Jobs must be partitioned into $M$ bags before an adversary reveals the speeds of at most $M$ machines. Each bag is then assigned to one available machine, and the jobs on each machine may be processed in any order independent of the bags. We compare with an optimal schedule that knows the speeds in advance and assigns jobs individually. This model has been studied for makespan minimization. We initiate its study for total completion time, as suggested by Stein and Zhong (TALG 2020). For an unknown number of identical machines, we show that the optimal deterministic robustness factor is exactly~$13/12$, both for unit-size jobs and for arbitrary processing times. For infinitesimally small jobs, the factor lies between $31/30\approx1.0333$ and $28/27\approx1.0370$, well below the optimal makespan factor of about $1.2071$. General speeds make the problem strictly harder: no deterministic algorithm is better than $1.2669$-robust, already for infinitesimally small jobs. We give a $25/16$-robust algorithm for arbitrary processing times and improve the guarantee to $1681/1152\approx1.4592$ for infinitesimally small jobs. Our main tools are a layer decomposition that extends guarantees from unit-size jobs to arbitrary processing times when one assignment satisfies them for every prefix in non-increasing processing-time order, and a threshold analysis of the bag counts produced by greedy assignment rules.

0.24

Approximation algorithms for identical parallel machine scheduling with assignment costs

cs.DS ·2026-10-24 ·Wei Li
similarity 0.67
Abstract

We study non-preemptive scheduling on identical parallel machines in which assigning job $j$ to machine $M_i$ incurs the cost $c_{ij}=a_iw_j+b_j$. The processing times $p_j$ and the cost weights $w_j$ are independent, and the number of machines is part of the input. For every fixed $\varepsilon\in(0,1]$ and every deadline $T$ for which a schedule with makespan at most $T$ exists, we give a polynomial-time algorithm that computes a schedule with makespan at most $(1+\varepsilon)T$ whose total assignment cost does not exceed the minimum under the deadline $T$. Using this algorithm as a subroutine, we obtain a polynomial-time approximation scheme for minimizing the makespan under a total cost budget whose schedules always satisfy the budget; this answers an open question for costs $c_{ij}=l_ic_j$ with $c_j$ independent of $p_j$. For the lexicographic problem, in which the total assignment cost is minimized among all schedules of minimum makespan, we obtain in polynomial time a schedule with makespan at most $1+\varepsilon$ times the minimum and total assignment cost at most that of a lexicographically optimal schedule; this improves the makespan guarantees of earlier algorithms for additive and multiplicative costs. For costs $c_{ij}=s_i+a_iw_j$, where $s_i$ is charged for each job processed on $M_i$, the same guarantees are obtained in quasi-polynomial time.

0.24

Minimizing the makespan in job shop scheduling under conflict graph constraints

cs.DM math.OC ·2026-09-03 ·Nour Elhouda Tellache, Abdenour Azerine
similarity 0.67
Abstract

We study the job shop scheduling problem with a conflict graph, in which adjacent jobs cannot be processed simultaneously on different machines, with the objective of minimizing the makespan. We establish a polynomial equivalence with a resource-constrained job shop problem having unit-capacity resources and binary resource requirements The problem is strongly NP-hard even on two machines with unit-time operations. For this setting, we derive an optimal-makespan formula and a linear-time algorithm when the conflict graph is a cluster graph, given the clique partition. We also develop a polynomial-time $4/3$-approximation algorithm for arbitrary conflict graphs on two machines when each job has exactly two unit-time operations. For the general problem, we propose four mixed-integer linear formulations, lower bounds, and a genetic algorithm with active, non-delay, and hybrid decoding procedures. Computational experiments on instances derived from the Lawrence and Taillard benchmarks and on randomly generated generalized job shop instances evaluate the proposed methods and show that the genetic algorithm generally improves on constructive heuristics.

0.33