Abstract

The increasing share of renewable energy in power systems creates a need for fast-response and flexible resources to maintain system stability. With the expansion of electricity markets and ancillary service products, opportunities arise to stack revenues across multiple services. Long-term Power-to-X (PTX) electrolysers and short-term battery energy storage systems (BESS) are prevalent flexible resources, yet most studies neglect real hardware behavior, such as ramp limits, efficiency, and setpoint-tracking accuracy. This work presents experimental and modeling results for a 55 kW/79 kWh BESS and an electrolyser comprising three 2.4 kW units. Key characteristics are identified through measurements and embedded into a price-driven optimization framework for participation in the Danish electricity and ancillary service markets, utilizing real market data from 2022 to 2025. The optimized daily profits for multi-market participation are 1,749.27 DKK and 289.46 DKK for the BESS and electrolyser, respectively. With the demonstrated business cases for BESS and PTX systems, this work highlights the importance of incorporating experimental performance when evaluating participation across multiple markets and years.

Comment
6 pages, 8 figures. Accepted at the 2026 IEEE Power and Energy Society General Meeting (PESGM)

Closest papers

Nearest neighbours by meaning across the whole index.

A Closed-Loop Model of an Anion Exchange Membrane Electrolyser Based on Operational Data

eess.SY ·2026-09-16 ·Maiken Borud Omtveit, Lisa Marie Dannappel, Shi You, Kjetil Uhlen
similarity 0.64
Abstract · 5 pages, IEEE ISGT 2026

The main contribution of this work is to identify model parameters for an Anion Exchange Membrane (AEM) system directly from measured operational data, enabling their use in power system studies. Due to the relatively low technology readiness level (TRL) of AEM electrolysers, only limited literature reports operational parameters supported by openly available experimental data. By capturing the realistic dynamic behaviour and power consumption of the AEM electrolyser, this model allows for more accurate evaluation of system topologies and control strategies for green hydrogen production. This paper presents a model of an AEM electrolyser based on experimental data from Enapter modules installed in the Power-to-X (PtX) Laboratory at the Technical University of Denmark [1]. The model comprises a polarisation curve and a model of current dynamics during operation. It is validated against operational data and can be applied in grid-balancing studies as well as in assessments of how electrolyser dynamics influence the power system. The results suggest that the AEM technology is suitable for services such as smoothing wind farm power output and provide system services to support frequency balancing. The findings highlight the importance of considering the constraints of the process when designing for flexible load operation, and consideration of the interaction between the power control and process control systems.

0.18

Optimal Demand Response-Based Energy Management for Campus Buildings with Battery Energy Storage Systems: A Case Study of the ELB Building

eess.SY ·2026-10-14 ·Ali Beidoun, Quang Manh Hoang, Guilherme Vieira Hollweg, Van-Hai Bui
similarity 0.63
Abstract · 1-12

Buildings account for a significant portion of global electricity consumption, making demand response (DR) an effective strategy for reducing energy costs and improving grid flexibility. This paper presents an optimal energy management framework for a campus building that integrates demand response and battery energy storage systems (BESS) to minimize electricity costs while satisfying operational constraints and occupant comfort requirements. The proposed optimization model schedules building loads and battery charging/discharging based on time-varying electricity prices and building demand profiles. The framework is validated using the Engineering Laboratory Building (ELB) at the University of Michigan-Dearborn as a real-world case study. Four operating scenarios are investigated: (i) baseline operation, (ii) demand response without battery energy storage, (iii) battery energy storage, and (iv) demand response with battery energy storage. Simulation results demonstrate that demand alone reduces the building's electricity cost by approximately 12% compared with conventional operation. When battery energy storage is incorporated, the total electricity cost reduction increases to approximately 26%, highlighting the significant economic benefits of coordinated demand response and energy storage scheduling. The results demonstrate that integrating battery energy storage with demand response substantially enhances the operational flexibility of campus buildings and provides an effective solution for cost-effective and sustainable building energy management.

0.17

Degradation-Aware Participation of Battery Storage in Frequency Regulation Markets

eess.SY math.OC ·2026-11-09 ·Anand Gokhale, Siddharth Bhela
hot direction similarity 0.60
Abstract · Extended version of IEEE PESGM submission

As data centers make the load on the power grid fluctuate faster, frequency regulation grows more valuable. Battery energy storage systems (BESSs) are well suited to provide frequency regulation, but providing this service speeds up aging, especially during operation at extreme state of charge (SoC). In the PJM interconnection, the grid operator supplies a regulation signal that a participating BESS is expected to follow, within a capacity that it must bid before the signal is known. Accordingly, we decompose the degradation-aware frequency regulation problem into a bidding layer and an operations layer. For bidding, we propose an adaptive strategy, assuming perfect tracking in which the bid depends on the SoC expected at the start of the bid period by means of choosing basepoints. For operation, the BESS further protects its battery by deliberately giving up a perfect performance score, to keep its SoC away from the extremes. On the PJM regulation signal and prices of 2023, adaptive bids lengthen the battery life by $31\%$ against bidding full capacity, for $2.2\%$ of the revenue. Giving up a perfect score in operation lengthens the battery life of constant bids by $10\%$ to $27\%$, at a change in revenue of at most $0.2\%$.

0.30

State-of-Charge Targets for Storage Participation in Two-Settlement Markets: Reliability, Price, and Compensation Impacts

eess.SY ·2026-11-13 ·Yichen Li, Alexandre Moreira, Ruiwei Jiang, Miguel Heleno, Julie Mulvaney-Kemp
hot direction similarity 0.60
Abstract

As energy storage assumes a larger role in electricity systems, market operation must coordinate its use across time to support reliability during periods of system stress. Minimum state-of-charge (SOC) targets provide a means of preserving energy for these periods, but their design shapes reliability, operating efficiency, and storage compensation. This paper evaluates alternative SOC target designs in a California-based day-ahead and real-time electricity market model. The comparison examines targets based on day-ahead schedules or rolling centralized dispatch, enforced at the individual-resource or system level, across seasons, stress conditions, and participant information settings. The results show that retaining more energy does not necessarily reduce load shedding: targets that restrict discharge can limit storage support during shortages. Under critical summer conditions, individual targets derived from rolling centralized dispatch reduce weekly load shedding by approximately 83--84\% relative to operation without targets. Lower RT clearing costs and average prices can coexist with higher storage compensation, reflecting the role of day-ahead positions and real-time deviations in determining settlement outcomes. These findings highlight the importance of coordinating energy retention with timely discharge and network deliverability when designing SOC requirements for storage participation in electricity markets.

0.20

Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation

eess.SY math.OC ·2026-11-06 ·Wei Wang, Himanshu Sharma, Thiagarajan Ramachandran
similarity 0.59
Abstract

Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load fluctuations through reserved active power with zero net state-of-charge change, and (iii) voltage support via reactive power capability at the point of common coupling. Minute-level operational scheduling enforces state-of-charge feasibility and load ramp constraints, and incorporates a controllable queue of delay-insensitive computing tasks to enhance flexibility. A case study using a real data center load profile demonstrates the proposed method and quantifies the BESS power-energy requirements and operational trade-offs needed to satisfy the multi-service constraints, providing practical guidance for interconnection planning and deployment.

0.05

Ancillary Services in High-Renewable Power Systems: Comparing Market Design, Emerging Trends, and Future Challenges

eess.SY ·2026-09-29 ·Andreas Makrides, Andrey Churkin, Fei Teng, Pierre Pinson
similarity 0.58
Abstract

Rapid growth in renewable generation is changing power-system operation and increasing the importance of ancillary services for security and reliability. As inverter-based resources displace conventional synchronous generation, system operators must procure a broader set of services spanning five categories: frequency control and reserves, voltage and reactive power support, system stability, restoration, and congestion management. This paper compares ancillary-service market design in Great Britain, Germany, Denmark, Italy, California, Texas, and Australia. It examines how these systems define, procure, remunerate, and coordinate services as variable renewable generation increases. The review develops a consistent product-level classification, provides comparable timing visualisations of frequency-control and reserve products, and maps implementation modalities across services and systems. Four trends emerge: faster and more granular frequency-response products, more explicit procurement of stability capabilities including inertia, system strength, and dynamic voltage support, broader participation by storage, demand-side resources, and other inverter-based resources, and greater use of locational, targeted, and technology-neutral procurement. Challenges include limited harmonisation, incomplete valuation of flexibility and stability capabilities whose value depends on location and operating conditions, barriers to participation by distributed and emerging resources, and insufficient coordination between market and operational arrangements. The comparison finds no convergence towards a single market design and supports differentiated but coordinated ancillary-service frameworks reflecting each service's technical, temporal, and locational characteristics.

0.22

Assessing Modeling Fidelity for Long-Term Battery Energy Storage Planning: Operation, Degradation, and Temporal Representation

eess.SY ·2026-09-30 ·Hassan Zahid Butt, Xingpeng Li
similarity 0.57
Abstract

Long-term battery energy storage system (BESS) planning often relies on simplified degradation, operational, and temporal representations to maintain computational tractability, yet their effects on lifecycle conclusions are not well understood. This paper assesses the modeling fidelity needed for long-term lifecycle evaluation of BESS designs used in planning studies. A 20-year grid-connected microgrid is sized using a degradation-naive planning model, after which the installed portfolio is fixed and evaluated through sequential lifecycle validation. The reference representation combines nonlinear calendar and cycle aging, C-rate-dependent efficiencies, state-of-health-dependent performance, self-discharge, battery replacement, and full 8,760-h chronology. Battery-model hierarchies, targeted ablations, linear degradation surrogates, health-update intervals, temporal reductions, and combined simplifications are compared using lifecycle cost, replacement timing, state of health, and energy adequacy. The reference case produces replacements in years 9 and 18, a $111.25 million lifecycle net present cost, and 24.01 MWh of cumulative energy not served. Omitting calendar aging eliminates both replacements and understates lifecycle cost by 35.1%, whereas a separately calibrated linear surrogate model reproduces both replacement years and limits the cost deviation to 0.2%, although energy not served remains 31.8% below the reference. A peak-informed calibrated 12-day representation preserves replacement timing but reports zero energy not served, while replacing the preserved peak day with the maximum daily-energy-deficit day substantially overstates energy not served because representative-day closure alters the battery state surrounding the critical event. The results show that modeling fidelity is metric-dependent and should be selected according to the lifecycle outcome to be preserved.

0.10

Degradation Aware V2G Dispatch for Co-Optimization of Parking Facility and Edge Data Center Located in the Airport Campus

eess.SY ·2026-10-17 ·Abdullah Al Mehadi, Hamed Haggi, Chinmay Morankar
similarity 0.57
Abstract

This paper studies an airport campus where long stay EV parking, airport buildings, and an AI data center share a single grid connection. The campus pays a commercial electricity tariff that charges for both the energy used and the highest power drawn during peak hours. Parked EVs can send power back to the campus through vehicle to grid (V2G) chargers and lower this peak. This paper proposes a two stage method. In the first stage, a linear program schedules EV charging and discharging to maximize the operator's profit and also sets a fixed daily payment to EV owners. In the second stage, a search chooses the share of energy savings paid to owners. The model guarantees that every owner is paid enough to take part, pays for battery wear so that EVs discharge only when it is worth the wear, and assigns charging ports on a first come, first served basis. In the case study, 400 V2G chargers are added to 1200 existing Level 2 chargers, serving 5000 expected sessions under summer and winter rates. In a summer week, V2G raises operator profit by $4978 compared with smart charging and lowers the high peak demand by 4400 kW (9%). The best contract gives owners 70% of the energy savings and earns 21% more than a fixed payment alone. Doubling the V2G ports to 800 lowers the peak further but reduces profit, because owner payments grow faster than the savings. V2G pays back within 10 years if a bidirectional charger costs less than about $1800 more than a standard one. Compared with a 5 MW/10 MWh stationary battery, V2G cuts more peak demand at $409 of investment per kW instead of $1522 and needs no extra land, while the battery does not pay back within its lifetime.