Cycle time minimization for the simple assembly line balancing problem under peak power constraints

Bao Gia Hoang, Tuyen Van Kieu, Khanh Van To

cs.LO ·submitted 2026-08-25 16:19 UTC · v1

Abstract

Peak power limits restrict concurrent tasks and may increase assembly-line cycle time. To the best of our knowledge, this study is the first to minimize cycle time for the simple assembly line balancing problem type 2 (SALBP-2) with a fixed number of workstations and a fixed limit on total instantaneous power. An exact satisfiability (SAT) method finds feasible schedules, searches systematically for shorter cycles, and proves optimality when possible. Two reproducible formulas define looser and tighter power limits for 72 cases based on the standard SALBP library, with Gurobi and CPLEX providing commercial MIP and CP comparisons. Relative to standard SALBP-2 optima, the two limits increase the best-known cycle time by 16.49% and 61.02% on average. The best-performing SAT configurations find a feasible solution for every case, solve more cases to optimality than each commercial solver, and when both prove optimality, are almost always faster under the reported settings.

Comment
Submitted to Engineering Optimization. This preprint has not yet undergone peer review

Closest papers

Nearest neighbours by meaning across the whole index.

Exact SAT and Constraint Programming for Job Shop Scheduling with Time-Varying Peak Power Constraints

cs.LO ·2026-08-26 ·Huy Tuan Nguyen, Duc Trung Kim Nguyen, Khanh To Van
benchmark similarity 0.61
Abstract

The Job Shop Scheduling Problem with Power Requirements (JSPPR) extends the classical job shop scheduling problem by imposing time-varying limits on instantaneous power consumption. Previous studies have used a mixed-integer linear programming formulation and the GRASP x ELS metaheuristic, but no SAT-based exact approach or constraint programming model has been reported. This paper develops the first exact SAT and constraint programming (CP) formulations for the JSPPR. On the 35 published benchmark instances, both SAT and CP prove global optimality for all instances and obtain identical optimal makespans, substantially improving upon the best previously reported results. They also establish four improved makespan values over the GRASP x ELS results reported in the original study. CP proves optimality faster than SAT, while both exact approaches substantially improve the optimality coverage of the MILP formulations, which prove optimality on only 6 and 10 instances using CPLEX and Gurobi, respectively. The certified optimal solutions also reveal inconsistencies in several previously reported benchmark results, including makespans below the proven optimum. We provide corrected optimal makespans and a complete set of certified optimal results for the JSPPR benchmark, establishing a reliable reference for future studies.

0.26

Solving Distributed Flexible Job Shop Scheduling Problem Using SAT

cs.LO ·2026-10-10 ·Phuong Dang Anh, Duc Nguyen Kim Trung, To Van Khanh
benchmark similarity 0.55
Abstract

The Distributed Flexible Job Shop Scheduling Problem (DFJSP) requires the joint determination of factory assignment, machine selection, and operation sequencing to minimize the makespan. This paper presents an exact SAT-based approach built on an efficient SAT formulation that exploits problem structure through propagation, symmetry breaking, and incremental SAT solving to effectively address these coupled decisions. The proposed method is evaluated on 76 standard benchmark instances from the Fattahi, Brandimarte, and rdata datasets under two- and three-factory configurations. Together with previously established results, the new SAT optimality certificates bring the total number of proven-optimal instances to 72 out of 76, including three newly certified instances; for two of these instances, SAT also improves the previous best-known makespans. Across the benchmark configurations, SAT achieves the best results on four of the five configurations and remains competitive with strong exact approaches such as CP and LBBD1_CPIL, as well as existing metaheuristic methods. These results demonstrate that the proposed SAT framework is an effective exact approach for the DFJSP, combining strong solution quality with rigorous optimality certification and offering a complementary exact method for future DFJSP studies and evaluations on additional benchmark instances.

0.13

PrecPack: An Efficient Open-Source Exact Solver for Bin Packing with Generalized Precedence Constraints

cs.DS math.COmath.OC ·2026-09-15 ·Sunkanghong Wang, Zhengzhong Ricky You, Roberto Baldacci, Baichuan Mo, Hu Qin +2 more
benchmarkcode/data similarity 0.52
Abstract

Efficient resource use in packing and assembly-line applications requires decisions that jointly account for capacity and precedence constraints. The strongly NP-hard bin packing problem with generalized precedence constraints (BPP-GP) models such decisions by minimizing the number of ordered, capacitated bins required to pack weighted items, even when precedence requirements span multiple bins. Existing exact algorithms primarily focus on classical special cases, whereas general BPP-GP has been addressed only via compact integer models and heuristics, with no efficient open-source exact solver. We present PrecPack, a unified exact solver that extends branch-bound-and-remember (BBR) to arbitrary nonnegative precedence weights and naturally specializes to the classical cases. Generalized states capture restrictions that remain active across future bins, which are addressed through branching, dominance, and conflict-aware lower bounds. Root column generation uses fixed-point arithmetic to compute numerically valid dual bounds for pruning or to prove optimality. To support reuse and verification, we provide common programming and command-line interfaces, independent assignment checking, explicit termination statuses, and reproducible batch execution; the core procedures require no commercial software. In same-machine, single-threaded comparisons on classic assembly-line benchmarks, more instances are proven optimal, and average computing times are substantially reduced relative to leading source-available BBR implementations. Further comparisons with published benchmark results for bin packing with precedence constraints and BPP-GP also show that more instances were proved optimal and that reported average gaps were smaller on most benchmark sets. PrecPack is released under the MIT License at https://github.com/Sunkanghong-Wang/PrecPack.

0.49

Two Communities, One Problem: Branch-and-Bound vs. A* for Resource-Constrained Project Scheduling

cs.AI math.OC ·2026-11-10 ·Izack Cohen, Dominik Kress, Lara Nehrke, Erwin Pesch, Shimrit Shtern
benchmarktheory similarity 0.51
Abstract

Branch-and-Bound (B&B) and $A^*$ are popular exact search methods originating from Operations Research and Artificial Intelligence, respectively. Although the two methods share fundamental search principles, their different ways of exploring the search space can lead to substantially different computational performance. We investigate these differences using the Resource-Constrained Project Scheduling Problem (RCPSP) as an exemplary problem setting. We first establish the relationships between mixed-integer linear programming, state-action, and timed Petri-net representations. Since B&B and $A^*$ admit numerous algorithmic enhancements, we focus on relatively basic implementations. This allows us to examine the fundamental differences between the methods rather than compare the performance of state-of-the-art solvers. By using the same lower bound and best-first node selection, we isolate the effects of the search mechanisms, particularly the identification of equivalent states reached through different scheduling decision sequences. Experiments on 480 benchmark RCPSP instances show that graph-based $A^*$ substantially outperforms the B&B variants considered. With additional pruning rules, $A^*$ proves optimality for all 480 instances, compared with 445 for best-first B&B under the same time and memory limits. Depth-first B&B uses less memory and can find feasible solutions even when the search does not finish within the time limit. Stronger linear programming relaxations reduce the search space but introduce considerable computational overhead. Our findings highlight the importance of duplicate-state detection and clarify the computational trade-offs between the search approaches. These insights can help researchers select an appropriate method and identify opportunities to incorporate effective mechanisms from one approach into the other.

0.21

Minimizing the Makespan Approximately on Two Identical Parallel Machines with a Loading--Unloading Server

cs.DS math.OC ·2026-08-19 ·Keramat Hasani, Frank Werner
theory similarity 0.51
Abstract · 29 pages, 1 appendix

We study makespan minimisation on two identical parallel machines that share a single server for both loading and unloading. Each job must be loaded, processed without interruption on its assigned machine, and unloaded immediately after processing, with a common positive integer duration for all loading and unloading operations. We prove that the decision problem is NP-complete for every fixed server-operation duration and strongly NP-complete when this duration is part of the input. We then analyse ordinary list scheduling and the longest-processing-time rule in the non-unit setting. List scheduling has a tight supremum ratio of two. For the longest-processing-time rule, we obtain the exact worst-case ratio when all processing times are at least the server-operation duration, and derive new parameter-dependent lower and upper bounds for unrestricted instances. The results show that both processing-time granularity and blocking generated by short jobs shape the approximation behaviour of the common-server problem.

0.08

FissionReady: Joint Workload and Power Scheduling for Data Centers Powered by Small Modular Reactors

cs.DC ·2026-09-30 ·Raghavendra Kanakagiri, Rohan Basu Roy, Yankai Jiang, Pranathi Wuppuluru, Devesh Tiwari
similarity 0.51
Abstract · 10 pages, 3 figures, 2 tables

Data centers are increasingly exploring small modular nuclear reactors (SMRs) as a carbon-free power source, but variable datacenter demand and negative grid prices require the SMR plant to load-follow rather than run at constant output. Load following is uniquely challenging and complex for SMR plants due to underlying nuclear physics. We propose FissionReady, a datacenter scheduler that tracks each module's fuel age, xenon state, and remaining flexibility to determine per-module operating envelopes, then coordinates load-following, batch deferral, and grid purchasing through a two-timescale optimization. FissionReady achieves zero involuntary shutdowns and zero batch deadline misses while reducing water consumption by roughly one-third and grid cost by roughly half compared to a same-sized base configuration.

0.19

Coordinating Boundaries: Improved Approximation Algorithms for Unweighted Non-Preemptive Throughput Maximization

cs.DS ·2026-10-26 ·Weitian Tong, Yao Xu
similarity 0.50
Abstract · 34 pages, 8 figures

We study unweighted nonpreemptive throughput maximization: given jobs with processing times, release times, and deadlines, schedule a maximum-cardinality subset on identical machines. For every fixed $\varepsilon>0$, we give randomized algorithms with expected approximation ratios $17/13+\varepsilon$ in polynomial time and $21/17+\varepsilon$ in pseudopolynomial time. These improve the respective $4/3+\varepsilon$ and $5/4+\varepsilon$ guarantees of Armbruster, Grandoni, Tinguely, and Wiese [STOC'26]. Both results hold for an arbitrary number of identical machines. Our algorithms build on their configuration-LP and matching framework, which partitions time into blocks. For a job whose window meets multiple blocks, its boundary blocks are the first and last such blocks. Crossing boundary pairs, whose endpoints strictly interleave, permit additional assignments to sampled execution slots, while a noncrossing family can be coordinated using consistent joint distributions on at most three blocks. The exchange analysis accounts for fractional job assignments that must be erased before inserting an additional job. For the pseudopolynomial implementation, we project configurations onto selected job identities and use separate configuration distributions with common placement marginals. This retains efficient pricing while enforcing the correlations needed for coordination.

0.15

Equal-Budget Monte Carlo Tree Search versus Randomized-Restart List Scheduling for DAG Workflows: A Controlled Equal-Budget Computational Study

cs.AI cs.DCcs.LG ·2026-10-08 ·Yuyu Zhang
similarity 0.49
Abstract · 19 pages, 4 figures. Preregistered negative result with an open evaluation protocol; companion artifacts archived at 10.5281/zenodo.22929494…

Monte Carlo Tree Search (MCTS) is often proposed for scheduling directed-acyclic-graph (DAG) workflows, yet most studies never run the comparison that could refute it - giving a much simpler method the same search effort. We run that comparison under a controlled protocol. All arms receive an identical budget - the same number of candidate schedules built and evaluated: an MCTS scheduling method, preregistered as the main arm; a randomized-restart list scheduler with no search tree as the control; and a textbook-UCT MCTS arm as a registered follow-up on the same domain. The analysis plan was locked before data collection; an independent checker confirmed all 768 confirmation-stage schedules valid with correct finish times. At the main budget of 2048 evaluated schedules, MCTS is 2.88% worse than the restarts (95% CI [-3.62%,-2.15%]; the 72 of 96 held-out instances with positive baseline-relative headroom). The deficit is not budget starvation: on the separate exploration pool restarts self-improve by 1.85% where MCTS gains 0.24%, and 700 of 720 of MCTS's first results are merely the warm start it was handed. The studied selection rule locks deterministically onto the first-expanded child, keeping its trials correlated while restarts draw gains from the tails; the causal link to makespan remains an inference. A structural map locates where the tree stops paying: restarts win on sparse irregular workflows, no difference is detectable on regular layered ones, and dense ones leave no room to improve. Swapping the rule for textbook UCT removes most of the deficit (-0.26%, 95% CI [-0.71%,+0.23%]) without reversing its sign. Results are confined to a controlled synthetic domain (N in {8,16,32} tasks, 2-8 processors, budgets up to 2048); we make no claim about larger budgets.

0.27