CS Paper Radar

FissionReady: Joint Workload and Power Scheduling for Data Centers Powered by Small Modular Reactors

Raghavendra Kanakagiri, Rohan Basu Roy, Yankai Jiang, Pranathi Wuppuluru, Devesh Tiwari

cs.DC ·submitted 2026-09-30 10:02 UTC · v1

Abstract

Data centers are increasingly exploring small modular nuclear reactors (SMRs) as a carbon-free power source, but variable datacenter demand and negative grid prices require the SMR plant to load-follow rather than run at constant output. Load following is uniquely challenging and complex for SMR plants due to underlying nuclear physics. We propose FissionReady, a datacenter scheduler that tracks each module's fuel age, xenon state, and remaining flexibility to determine per-module operating envelopes, then coordinates load-following, batch deferral, and grid purchasing through a two-timescale optimization. FissionReady achieves zero involuntary shutdowns and zero batch deadline misses while reducing water consumption by roughly one-third and grid cost by roughly half compared to a same-sized base configuration.

Comment
10 pages, 3 figures, 2 tables

Closest papers

Nearest neighbours by meaning across the whole index.

Techno-Economic Boundary Analysis of Small Modular Reactor Cogeneration for Hyperscale Data Center IT and Cooling Loads

eess.SY ·2026-08-11 ·Honglin Li, Buxin She, Jie Zhang
similarity 0.65
Abstract

Hyperscale data centers are adding firm, high-utilization demand faster than grids can serve it, renewing interest in colocating them with small modular reactors. Such a plant could earn revenue in two ways, selling low-carbon power and diverting steam to absorption chillers that serve a cooling load accounting for 20-40% of facility electricity use, but neither revenue stream has been priced across the conditions that must coincide. Here we co-optimize reactor dispatch, steam extraction, absorption cooling and grid exchange hourly for a 200 MW$_\mathrm{e}$ data center in the Electric Reliability Council of Texas (ERCOT) region, across 109 runs spanning capital, market, policy, financing and cooling efficiency. At 2023 mid-range reactor capital, the nuclear configurations cost 49-62% more than grid supply even with the Section 45Y production tax credit. The viable region opens near \$5,000 kW$_\mathrm{e}^{-1}$, and nth-of-a-kind capital makes them 77-89% cheaper in 2023, though between parity and 34% more expensive in the low-price 2024 market. A carbon price of \$53-64 tCO$_2^{-1}$ closes the mid-range gap under hourly export crediting. Absorption cooling is dispatched in response to hourly electricity prices and supplies 38% of annual cooling, at an added cost of \$9.2 million yr$^{-1}$ relative to the reactor-only plant; that gap closes at an installed absorption cost of \$60 kW$_\mathrm{c}^{-1}$ at baseline efficiency and \$570 kW$_\mathrm{c}^{-1}$ on a legacy-efficiency campus, against surveyed commercial prices of \$450-1,200 kW$_\mathrm{c}^{-1}$. Together these results delineate the capital, market and policy conditions under which colocated reactor cogeneration is competitive with grid procurement, and the range over which each condition moves the outcome.

0.04

Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal Shifting

eess.SY ·2026-09-29 ·Suntao Su, Liang Du, Shengyi Wang
similarity 0.60
Abstract · 5 pages, 5 figures, conference

The rapid growth of artificial intelligence (AI) data centers has introduced new challenges to power system operation. As their power demand becomes larger and more variable, quantitatively characterizing their demand flexibility is increasingly important for effective power system coordination. However, heterogeneous workload characteristics and resource requirements make this flexibility difficult to characterize directly. This paper proposes a framework for assessing the grid-compatible demand flexibility of AI data centers via batch workload temporal shifting. An averaging-based resource usage processing method is developed to map fine-resolution CPU, GPU and memory usage into unified time intervals compatible with power system operation. A workload temporal scheduling model is then formulated to shift batch workloads while preserving execution continuity, delay constraints, and server resource capacities, and is coupled with a utilization-dependent server power model to translate workload scheduling decisions into server power demand. Two complementary flexibility metrics are evaluated: short-term peak demand shaving and the maximum duration of sustained power reduction. Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.

0.13

Slasher: Power Flexibility for Cloud Datacenters

cs.DC cs.OSeess.SY ·2026-08-26 ·Liuzixuan Lin, Fiodar Kazhamiaka, Alok Gautam Kumbhare, Chaojie Zhang, Jaylen Wang +8 more
similarity 0.60
Abstract · 18 pages, 15 figures

Datacenters consume many megawatts of power, and regularly encounter scenarios that require modulating their power draw. These scenarios include datacenter infrastructure failures, power grid failures, grid services, and more, spanning a diverse range of requirements in terms of the power magnitude, the scope of the reduction, the notice time, and other dimensions. To address these scenarios, we have built Slasher, a general system for modulating the power of \azure datacenters to handle scenarios ranging from individual racks to regional multi-datacenter grid events. Slasher coordinates datacenter resources with the goal of meeting power targets while minimizing negative impact on hosted workloads. In this paper, we review the main power modulation scenarios, characterize the power reduction levers using data from production cloud datacenters, describe Slasher's system architecture, and formulate the cloud datacenter power modulation control problem. We also develop a high-fidelity datacenter simulator and propose a workload impact model, using them to design and evaluate power control algorithms.

0.31

Energy-performance tradeoffs in server farms with batch services and setup times

cs.PF math.PR ·2026-10-04 ·Thu Le-Anh, Tuan Phung-Duc
publishedhighly cited similarity 0.59
Abstract · This paper is an updated version of the published article, in which the average batch size for the M/M/c/SET-BATCH/Dynamic model has been up…

Data centers consume a large amount of energy, much of which is wasted due to idle servers. Turning off idle servers might be an effective power-saving solution; however, there is a trade-off between energy savings and system performance. Hence, we propose a setup queueing model with a batching policy that allows servers to process a set of jobs simultaneously to minimize power consumption while maintaining acceptable performance. We consider an M/M/c/SET--BATCH queue, a multi-server batch service queue with a fixed batch size and setup times, and some variants, including systems in which idle servers delay before turning off or systems in which the batch size is dynamic. We analyze the steady-state probabilities and system performance of the M/M/c/SET--BATCH system and its variants. Our analysis of the M/M/c/SET--BATCH system with lower computational complexity is made possible by utilizing the special structure of the model. In addition, we use simulations to compare the M/M/c/SET--BATCH model with some other variants with different setup time distributions. The results suggest that the model performs better when the setup time has a larger coefficient of variation. Our results indicate that the batching policy enhances the system performance, especially when we allow servers to be idle before turning them off.

0.70

Data center cooling choices shift water impacts across the grid: An integrated water-energy model for sustainable data center development

eess.SY cs.CYcs.DC ·2026-09-21 ·Garrett Alston, Nancy Love, Rabab Haider
code/data similarity 0.59
Abstract · 12 pages; 8 figures; 6 tables; appendix

Data centers are being developed at an unprecedented pace, yet their energy and water impacts, and the spatial and temporal distribution of these impacts, remain poorly characterized. Data centers consume water for cooling (direct) and through electricity generation (indirect). Decisions on siting and cooling technology result in water-energy trade-offs that extend impacts beyond the facility's location. Existing assessment frameworks rely on facility efficiency metrics and average grid water intensity factors, suppressing the temporal impacts of data center load and generation availability. They also attribute indirect consumption to the facility's location rather than to the generators (and corresponding hydrologic regions) that respond to the added load, misattributing spatial impacts. To close this gap, we develop a computational model of the data center-energy-water nexus that links facility cooling and electricity demand with hourly economic dispatch, generator-level water consumption, and monthly subbasin depletion. Built on open-source data, the model resolves where and when water is consumed, and where this consumption compounds existing water risk or creates new risk. Using the model, we study different cooling configurations and proposed developments in the state of Michigan. Air-cooled data centers halve total water consumption relative to evaporative cooling, but increase electricity demand and raise indirect water consumption by one-third, shifting the water footprint from the facility to generators. Mapping these changes to subbasins reveals depletion increases beyond the data center sites, in regions that facility-level reporting may overlook. These results show that data center water and energy impacts cannot be assessed in isolation, motivating the need for integrated modeling to inform siting, design, and reporting practices.

0.22

Job-Level Workload Allocation for Data Centers Under Flexible Interconnections

eess.SY ·2026-11-14 ·Tanmay Mishra, Arash Omidi, Mads R. Almassalkhi
hot direction similarity 0.59
Abstract · Submitted to IEEE PES General Meeting 2027

Flexible interconnections allow data centers to connect to the grid sooner without upgrading the grid infrastructure, if they accept limits on their grid power during periods of grid stress. When a limit is reached, the data center must slow some of its computing jobs. This choice sets the cost of flexibility, because the work done by a job is worth far more than the energy it uses. This paper models how jobs respond when their power is reduced, and proposes a real-time method that shares the available power among jobs according to their value. It also gives grid planners a simple measure of how much power a data center can reduce, and for how long. A one-year case study of a 100-MW data center shows that the proposed method lowers the cost of meeting grid limits, and that on-site generation and storage lower it further.

0.24

Spatial LLM Workload Shifting Needs Foresight: Model Commitment for AI Data Center Operation under Power Grid Constraints

eess.SY ·2026-09-09 ·Bojun Du, Hongyang Jia, Tonghui Li, Qingchun Hou, Ze Wang +2 more
similarity 0.58
Abstract · 3 pages, 2 figures

AI data centers may face power supply shortages during certain periods, requiring operators to shift large language model (LLM) inference workloads spatially to maintain service rates. However, existing workload-shifting methods typically assume that any data center with sufficient computing resources can immediately serve shifted requests, which may lead to infeasible transfers and unserved demand. This letter proposes model commitment (MC), a mixed-integer linear programming framework that jointly schedules model deployment and cross-site request routing under power constraints and electricity-price signals. First, MC formulates the intertemporal coupling introduced by model replica loading. Second, it translates prefill and decode latency requirements into the amount of demand that each replica can serve. Case studies based on real-world data show that MC enables AI data center operators to achieve a 100% service rate under time-varying grid conditions and reduce total operating cost by 29.0%.

0.24

GreenDirector: carbon- and water-aware workload placement for sustainable computing

cs.DC ·2026-09-11 ·Jaime Iglesias Blanco, Ignacio Heredia, María Castrillo, Andrei Tsaregorodtsev, Mazen Ezzeddine +1 more
similarity 0.58
Abstract

The rapid growth of data center electricity demand, accelerated by AI, makes carbon-only accounting an incomplete measure of computing's environmental impact: low-carbon electricity mixes are often water-intensive, and the resulting harm depends on local, seasonal scarcity rather than on the volume of water consumed. We propose the Environmental Score (ES), a unified, dimensionless index in $[0, 100]$ that jointly captures the carbon footprint and the spatial-temporal, scarcity-weighted water impact of the electricity a workload consumes. It combines real-time, cross-border electricity flow tracing with monthly AWARE2.0 water-scarcity characterization factors, weighting global greenhouse-gas emissions together with the local, seasonal severity of water stress. Building on it, we define the Green Score (GS), a scheduling metric proportional to the useful computational work delivered per unit of real environmental impact, which also accounts for data center power and hardware efficiency. We add both metrics as a green-affinity feature to the GreenDirector schedulers of two production federated infrastructures, the AI4EOSC scientific cloud and the DIRAC workload management system. In AI4EOSC, a cluster-filling experiment over four pan-European providers shows that greener sites are filled first without degrading scheduling latency or end-user experience. In DIRAC, a trace-driven simulation of 133,631 jobs and a preliminary production deployment for the KM3NeT community reduce carbon emissions and improve carbon efficiency by about 40\%, while making the carbon-water trade-off explicit when the lowest-carbon site also carries higher water stress. The results show that hydrological stress can be dynamically weighted into workload placement in live, multi-tenant systems

0.19