Energy-performance tradeoffs in server farms with batch services and setup times

Thu Le-Anh, Tuan Phung-Duc

cs.PF math.PR ·submitted 2026-10-04 02:39 UTC · v1
publishedhighly cited

Abstract

Data centers consume a large amount of energy, much of which is wasted due to idle servers. Turning off idle servers might be an effective power-saving solution; however, there is a trade-off between energy savings and system performance. Hence, we propose a setup queueing model with a batching policy that allows servers to process a set of jobs simultaneously to minimize power consumption while maintaining acceptable performance. We consider an M/M/c/SET--BATCH queue, a multi-server batch service queue with a fixed batch size and setup times, and some variants, including systems in which idle servers delay before turning off or systems in which the batch size is dynamic. We analyze the steady-state probabilities and system performance of the M/M/c/SET--BATCH system and its variants. Our analysis of the M/M/c/SET--BATCH system with lower computational complexity is made possible by utilizing the special structure of the model. In addition, we use simulations to compare the M/M/c/SET--BATCH model with some other variants with different setup time distributions. The results suggest that the model performs better when the setup time has a larger coefficient of variation. Our results indicate that the batching policy enhances the system performance, especially when we allow servers to be idle before turning them off.

Comment
This paper is an updated version of the published article, in which the average batch size for the M/M/c/SET-BATCH/Dynamic model has been updated. The conclusions based on the numerical results remain unchanged
Journal ref
Le-Anh, T. and Phung-Duc, T., "Energy-Performance Tradeoffs in Server Farms with Batch Services and Setup Times," Performance Evaluation, Vol. 168, Article no. 102468, 2025
DOI
10.1016/j.peva.2025.102468

Closest papers

Nearest neighbours by meaning across the whole index.

A Smallest-Need-First Job Scheduling Framework with Adaptive Optimization of Idle Node Counts for Energy-Efficient HPC Systems

cs.DC ·2026-08-30 ·Reza Pulungan, Raka Satya Prasasta, Santana Yuda Pradata, Mursalim, Hiroyuki Takizawa +1 more
similarity 0.66
Abstract · 18 pages, 10 figures

Power-state management in high-performance computing (HPC) clusters must reduce idle energy without excessive wake-up delays for rigid parallel jobs. This paper presents SNF-ICON, an event-driven controller combining smallest-need-first (SNF) gang scheduling, predictive wake timing, and adaptive warm-spare control. At each scheduler invocation, recent interarrival and completed-service samples are screened for sufficiency, exponential-like variability, low lag-one autocorrelation, and acceptable Kolmogorov-Smirnov distance. Rejected or data-sparse windows use SNF+IPM (Intelligent Power Manager), whereas accepted windows activate release prediction and an exponential next-event model. Warm-spare optimization is applied only when queue, event, and arrival-recency conditions permit, balancing estimated waiting and non-compute energy over a timeout-capped horizon. We evaluate four DAS2 trace segments and a generated Markovian workload on AOBA-derived 64-node models, plus SDSC Blue on an AOBA-derived 1152-node model. SNF-ICON is compared with SNF+IPM and First Come First Served (FCFS) + backfilling with IPM. It reduces average waiting time relative to the FCFS-based baseline in all six cases and remains close to at least one heuristic energy baseline in five. The generated workload spends substantial time in ICON mode, whereas DAS2 workloads operate mainly in fallback. Furthermore, cross-platform results show strong dependence on node-transition and power models. Thus, no single policy or parameter set works best in every case.

0.27

Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal Shifting

eess.SY ·2026-09-29 ·Suntao Su, Liang Du, Shengyi Wang
similarity 0.65
Abstract · 5 pages, 5 figures, conference

The rapid growth of artificial intelligence (AI) data centers has introduced new challenges to power system operation. As their power demand becomes larger and more variable, quantitatively characterizing their demand flexibility is increasingly important for effective power system coordination. However, heterogeneous workload characteristics and resource requirements make this flexibility difficult to characterize directly. This paper proposes a framework for assessing the grid-compatible demand flexibility of AI data centers via batch workload temporal shifting. An averaging-based resource usage processing method is developed to map fine-resolution CPU, GPU and memory usage into unified time intervals compatible with power system operation. A workload temporal scheduling model is then formulated to shift batch workloads while preserving execution continuity, delay constraints, and server resource capacities, and is coupled with a utilization-dependent server power model to translate workload scheduling decisions into server power demand. Two complementary flexibility metrics are evaluated: short-term peak demand shaving and the maximum duration of sustained power reduction. Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.

0.13

Steady-State Equivalent Circuit Model for Data Center Loads

eess.SY ·2026-08-18 ·Muhammad Hamza Ali, Peng Sang, Hyeon Woo, Hyein Kang, Sungyun Choi +1 more
similarity 0.60
Abstract

Planners currently represent data centers as aggregate constant-PQ or ZIP loads in steady-state interconnection and contingency studies. These aggregate models are computationally convenient. However, they obscure the electrical relationship between computational workloads, server utilization, and grid-side demand. They ignore the internal power-electronic conversion stages of IT loads and assume homogeneous workload distributions across the compute clusters. This hides operating-point-dependent converter losses and efficiency variations. We propose a steady-state equivalent-circuit model (ECM) for data centers, which explicitly builds circuit models for IT loads, power supply units, cooling, and auxiliary systems. For power supply units, the equivalent circuit model explicitly represents internal power-electronic conversion stages. For IT loads, we develop a utilization-dependent server power model, and we combine it with loss-aware ECMs of power supply units. This approach captures the grid-side impact of heterogeneous workload distributions while preserving compatibility with conventional power-flow analysis. We evaluate this data center ECM in large-scale transmission power flows, using Monte Carlo simulations under heterogeneous and homogeneous cluster utilization. In comparison with the fixed-efficiency constant-PQ model, the ECM predicts that the most stressed line exceeds its thermal limit in about 30% of Monte Carlo samples. The results further show that homogeneous server utilization overstates line-loading variability by 17%-46% relative to heterogeneous server utilization, depending on the intra-cluster workload correlation.

0.47

Minimizing the Makespan Approximately on Two Identical Parallel Machines with a Loading--Unloading Server

cs.DS math.OC ·2026-08-19 ·Keramat Hasani, Frank Werner
theory similarity 0.59
Abstract · 29 pages, 1 appendix

We study makespan minimisation on two identical parallel machines that share a single server for both loading and unloading. Each job must be loaded, processed without interruption on its assigned machine, and unloaded immediately after processing, with a common positive integer duration for all loading and unloading operations. We prove that the decision problem is NP-complete for every fixed server-operation duration and strongly NP-complete when this duration is part of the input. We then analyse ordinary list scheduling and the longest-processing-time rule in the non-unit setting. List scheduling has a tight supremum ratio of two. For the longest-processing-time rule, we obtain the exact worst-case ratio when all processing times are at least the server-operation duration, and derive new parameter-dependent lower and upper bounds for unrestricted instances. The results show that both processing-time granularity and blocking generated by short jobs shape the approximation behaviour of the common-server problem.

0.08

FissionReady: Joint Workload and Power Scheduling for Data Centers Powered by Small Modular Reactors

cs.DC ·2026-09-30 ·Raghavendra Kanakagiri, Rohan Basu Roy, Yankai Jiang, Pranathi Wuppuluru, Devesh Tiwari
similarity 0.59
Abstract · 10 pages, 3 figures, 2 tables

Data centers are increasingly exploring small modular nuclear reactors (SMRs) as a carbon-free power source, but variable datacenter demand and negative grid prices require the SMR plant to load-follow rather than run at constant output. Load following is uniquely challenging and complex for SMR plants due to underlying nuclear physics. We propose FissionReady, a datacenter scheduler that tracks each module's fuel age, xenon state, and remaining flexibility to determine per-module operating envelopes, then coordinates load-following, batch deferral, and grid purchasing through a two-timescale optimization. FissionReady achieves zero involuntary shutdowns and zero batch deadline misses while reducing water consumption by roughly one-third and grid cost by roughly half compared to a same-sized base configuration.

0.19

Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation

eess.SY math.OC ·2026-11-06 ·Wei Wang, Himanshu Sharma, Thiagarajan Ramachandran
similarity 0.59
Abstract

Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load fluctuations through reserved active power with zero net state-of-charge change, and (iii) voltage support via reactive power capability at the point of common coupling. Minute-level operational scheduling enforces state-of-charge feasibility and load ramp constraints, and incorporates a controllable queue of delay-insensitive computing tasks to enhance flexibility. A case study using a real data center load profile demonstrates the proposed method and quantifies the BESS power-energy requirements and operational trade-offs needed to satisfy the multi-service constraints, providing practical guidance for interconnection planning and deployment.

0.05

Online Service with Per-Batch Maximum Delays

cs.DS ·2026-08-19 ·Tianhang Lu, Runtian Ren, Shengcai Liu, Ke Tang
similarity 0.58
Abstract

We study online service with per-batch maximum delays on a finite metric space. Requests arrive over time, and a server serves each batch by following a walk visiting its requests' locations. Movement is instantaneous. The objective is to minimize the total distance traveled by the server plus the sum, over all batches, of the maximum waiting time in each batch. We give deterministic polynomial-time algorithms with competitive ratios $10$ on finite lines, $12$ on weighted trees, and $20$ on arbitrary finite metrics. Unlike additive delay, maximum delay allows younger requests to join a batch without increasing its delay charge. Our algorithms coordinate service using a common waiting clock and a threshold determined by the metric. The analysis uses certificates for groups of requests to compare this policy with any offline schedule, even one that serves different batches and follows different walks. This comparison shows that coordinating service in this way loses only a constant factor. The bounds hold whether the server must serve requests it visits or may leave them unserved; the two rules also have equal offline optimal costs. Offline optimization is polynomial on lines and explicitly represented weighted trees, and NP hard on general metrics. When arrivals are announced but locations are hidden until visited, we give an $84$-competitive algorithm on a known finite line under either rule.

0.13

LLM-Powered Predictive Decision-Making for Sustainable Data Center Operations

cs.LG ·2026-08-19 ·Hanzhao Wang, Jingxuan Wu, Yumeng Li, Yu Pan, Guanting Chen
similarity 0.58
Abstract

The growing demand for AI-driven workloads, particularly from Large Language Models (LLMs), has raised concerns about the significant energy and resource consumption in data centers. This work introduces a novel LLM-based predictive scheduling system designed to enhance operational efficiency while reducing the environmental impact of data centers. Our system utilizes an LLM to predict key metrics such as execution time and energy consumption from source code, and it has the potential to extend to other sustainability-focused metrics like water usage for cooling and carbon emissions, provided the data center can track such data. The predictive model is followed by a real-time scheduling algorithm that allocates GPU resources, aiming to improve sustainability by optimizing both energy consumption and queuing delays. With fast inference times, the ability to generalize across diverse task types, and minimal data requirements for training, our approach offers a practical solution for data center scheduling. This framework demonstrates strong potential for advancing sustainability objectives in AI-driven infrastructure. Through our collaboration with a data center, we achieved a 32% reduction in energy consumption and a 30% decrease in waiting time.

0.08