Steady-State Equivalent Circuit Model for Data Center Loads

Muhammad Hamza Ali, Peng Sang, Hyeon Woo, Hyein Kang, Sungyun Choi, Amritanshu Pandey

eess.SY ·submitted 2026-08-18 15:47 UTC · v1

Abstract

Planners currently represent data centers as aggregate constant-PQ or ZIP loads in steady-state interconnection and contingency studies. These aggregate models are computationally convenient. However, they obscure the electrical relationship between computational workloads, server utilization, and grid-side demand. They ignore the internal power-electronic conversion stages of IT loads and assume homogeneous workload distributions across the compute clusters. This hides operating-point-dependent converter losses and efficiency variations. We propose a steady-state equivalent-circuit model (ECM) for data centers, which explicitly builds circuit models for IT loads, power supply units, cooling, and auxiliary systems. For power supply units, the equivalent circuit model explicitly represents internal power-electronic conversion stages. For IT loads, we develop a utilization-dependent server power model, and we combine it with loss-aware ECMs of power supply units. This approach captures the grid-side impact of heterogeneous workload distributions while preserving compatibility with conventional power-flow analysis. We evaluate this data center ECM in large-scale transmission power flows, using Monte Carlo simulations under heterogeneous and homogeneous cluster utilization. In comparison with the fixed-efficiency constant-PQ model, the ECM predicts that the most stressed line exceeds its thermal limit in about 30% of Monte Carlo samples. The results further show that homogeneous server utilization overstates line-loading variability by 17%-46% relative to heterogeneous server utilization, depending on the intra-cluster workload correlation.

Closest papers

Nearest neighbours by meaning across the whole index.

Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems

eess.SY ·2026-09-02 ·Pengyu Ren, Wei Sun, Fei Teng
similarity 0.70
Abstract

Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning systems can maintain IT service while limiting customer-initiated load reduction. This paper presents a voltage ride-through (VRT)-aware data center and grid co-planning framework that couples transmission-level fault simulation with an internal data center ride-through model. Python-based dynamic simulations generate point-of-interconnection (POI) voltage trajectories under selected network faults, and the resulting waveforms drive an internal model incorporating IT and cooling-load dynamics, DC-link, Uninterruptible Power Supply (UPS) response, and converter apparent power limits. The IEEE 118-bus case study shows that internal VRT capability can become a binding interconnection constraint: steady-state planning alone can overestimate feasible data center capacity, whereas increased UPS converter headroom progressively restores hosting capacity. Under the reduced-order response models studied, the grid-forming mode provides greater ride-through margin than the current-limited grid-following mode under the same network fault conditions. The results further show that VRT constraints can materially change both the total hosting capacity of data centers and its spatial allocation across candidate interconnection buses.

0.16

Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility

eess.SY ·2026-10-04 ·Rida Fatima, Xingpeng Li
similarity 0.69
Abstract

The rapid growth of AI data centers is creating concentrated electricity demands that can exceed available distribution network headroom and delay interconnection. This paper investigates whether capacity can be used effectively by coordinating flexibility on both sides of the interconnection. A day-ahead mixed integer second order cone programming framework maximizes feasible AI data center IT capacity using utility side conservation voltage reduction and network topology reconfiguration, together with data center workload shifting and reserve constrained uninterruptible power supply storage. Background feeder demand uses voltage dependent ZIP models, while the data center is modeled as constant power demand using Training, Inference, and Mixed workload profiles. A two-stage solution first maximizes interconnection capacity and then minimizes feeder losses for the retained capacity, with numerical relaxation screening. Studies on a 116-bus model derived from the IEEE 123-node feeder show that, at the constrained bus-60 connection point, grid side flexibility, driven almost entirely by network reconfiguration, increases feasible IT capacity by approximately 42.5-45.0%, while data center flexibility alone provides approximately 2.1-5.4% gains. Coordinated operation increases feasible IT capacity from approximately 10.5-10.6 MW under BASE operation to 15.3-16.0 MW, corresponding to gains of approximately 45.9-50.8%; the 16.0 MW Inference result is limited by the adopted UPS reserve requirement. Benefits are strongly location dependent and influenced by workload flexibility, deferral duration, PUE, UPS energy and reserve requirements, and feeder loading. Under a combined adverse operating condition, FULL capacity decreases by only 3.4% relative to the nominal Mixed case while retaining substantial additional capacity over BASE.

0.28

Slasher: Power Flexibility for Cloud Datacenters

cs.DC cs.OSeess.SY ·2026-08-26 ·Liuzixuan Lin, Fiodar Kazhamiaka, Alok Gautam Kumbhare, Chaojie Zhang, Jaylen Wang +8 more
similarity 0.69
Abstract · 18 pages, 15 figures

Datacenters consume many megawatts of power, and regularly encounter scenarios that require modulating their power draw. These scenarios include datacenter infrastructure failures, power grid failures, grid services, and more, spanning a diverse range of requirements in terms of the power magnitude, the scope of the reduction, the notice time, and other dimensions. To address these scenarios, we have built Slasher, a general system for modulating the power of \azure datacenters to handle scenarios ranging from individual racks to regional multi-datacenter grid events. Slasher coordinates datacenter resources with the goal of meeting power targets while minimizing negative impact on hosted workloads. In this paper, we review the main power modulation scenarios, characterize the power reduction levers using data from production cloud datacenters, describe Slasher's system architecture, and formulate the cloud datacenter power modulation control problem. We also develop a high-fidelity datacenter simulator and propose a workload impact model, using them to design and evaluate power control algorithms.

0.31

Mitigating the Grid Impact of Gigawatt-Scale AI Data Centers via High-Fidelity Model Flexibility

eess.SY math.OC ·2026-11-18 ·Eihab E. E. Ahmed, Saeed Manshadi
hot direction similarity 0.69
Abstract

Gigawatt-scale artificial intelligence data centers (AIDCs) are being connected at a single point of interconnection (POI) faster than transmission can be reinforced, yet studies of their flexibility rely on DC power flow and simplified load envelopes that omit voltage, cooling dynamics, and workload deadlines. This paper addresses this gap by embedding a high-fidelity AIDC model, with separate inference and training pools, hall thermal mass, PV, a battery energy storage system (BESS) with reactive capability, and a STATCOM, in a five-minute multi-period AC optimal power flow. Simulations on the RTS-GMLC test system show that active-power flexibility mitigates local price spikes and relieves congestion, whereas reactive support from the BESS inverter or a STATCOM is needed to keep the POI voltage away from sagging around its 0.95~pu limit. Sensitivity analyses show that cost-driven charging of large batteries can induce new morning congestion and that storage largely substitutes for wider workload deferral.

0.30

From Grid to Chip: Power Architecture, Stability, and Flexibility of AI Data Centers

cs.ET cs.AReess.SY ·2026-09-10 ·Yubo Song, Rui Kong, Takuro Umihara, Pooya Davari, Frede Blaabjerg +1 more
publishedhot direction similarity 0.67
Abstract · The manuscript has been submitted for review to IEEE Open Journal of Power Electronics

The rapid growth of artificial intelligence (AI) computing is transforming data centers into large, dynamic electrical loads. Their deployment is primarily constrained by energy availability and grid-connection capacity, which is further aggravated by the ability of power-delivery architectures, control systems, and computing workloads to operate reliably during fast grid disturbances. This article presents a technological perspective on AI data centers as grid-interactive computing systems. First, it reviews grid-integration bottlenecks, evolving connection policies, grid-code requirements, which has fostered new technological trends via spatio-temporal flexibility available through workload orchestration, cooling systems, on-site resources, and energy storage. Second, it maps the evolution of power-delivery architectures from medium-voltage grid interfaces to chip-level, discussing higher-voltage DC distribution, solid-state transformers, wide-bandgap devices, advanced chip-level power delivery, and liquid cooling. Third, it establishes a three-level stability framework spanning rack-level DC-bus dynamics, facility-level converter interactions, and system-level grid-coupled behavior. The framework connects dominant instability mechanisms, including constant power load effects, impedance interactions, forced oscillations, and operating-mode transitions, with suitable modeling, assessment, and mitigation approaches. Synthesizing these topics, this article highlights grid-to-chip co-design as a central requirement for scalable AI infrastructure, linking computing workloads, power-delivery systems, energy buffers, and grid operation.

0.37

Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal Shifting

eess.SY ·2026-09-29 ·Suntao Su, Liang Du, Shengyi Wang
similarity 0.67
Abstract · 5 pages, 5 figures, conference

The rapid growth of artificial intelligence (AI) data centers has introduced new challenges to power system operation. As their power demand becomes larger and more variable, quantitatively characterizing their demand flexibility is increasingly important for effective power system coordination. However, heterogeneous workload characteristics and resource requirements make this flexibility difficult to characterize directly. This paper proposes a framework for assessing the grid-compatible demand flexibility of AI data centers via batch workload temporal shifting. An averaging-based resource usage processing method is developed to map fine-resolution CPU, GPU and memory usage into unified time intervals compatible with power system operation. A workload temporal scheduling model is then formulated to shift batch workloads while preserving execution continuity, delay constraints, and server resource capacities, and is coupled with a utilization-dependent server power model to translate workload scheduling decisions into server power demand. Two complementary flexibility metrics are evaluated: short-term peak demand shaving and the maximum duration of sustained power reduction. Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.

0.13

Reliability-based Sizing of Energy Storage for Large Load Integration

eess.SY ·2026-11-18 ·Atri Bera, Chandan Chaudhary, Dilip Pandit, Cody J. Newlun, Tu A. Nguyen +2 more
published similarity 0.66
Abstract · 12 pages, 1 figure, published as part of the proceedings of the 2026 Grid of the Future Symposium organized by the CIGRE US National Committ…

The number of large loads connected to the bulk power system has been increasing rapidly worldwide. Emerging high-demand facilities, particularly AI data centers, are introducing new challenges for power system planners. In absence of appropriate planning mechanisms, the addition of high volumes of data center loads will lead to an increase in outages, thus degrading reliability of the system. Energy storage systems (ESS) offer a promising solution to mitigate the reliability impacts of these large loads, due to their flexibility and fast-ramping characteristics. However, ESS should be judiciously sized and sited to maximize the reliability benefits to the grid. This paper presents a framework for the optimal sizing and siting of ESS to minimize the adverse reliability impacts of large load additions. First, a stochastic semi-Markov model is developed to model the load of AI data centers and generate profiles for several such facilities. These profiles are then incorporated into a Markov-chain Monte Carlo simulation-based composite system reliability assessment framework. A detailed nodal network model is used to quantify the reliability impacts of adding data centers and to identify buses most affected by large loads. Resource adequacy metrics are used to evaluate the overall system reliability impacts. ESS are then strategically sized and sited based on this analysis to mitigate the negative impacts of large loads on overall system reliability. The proposed framework is demonstrated using the RTS-GMLC 72-bus test system. The results show how ESS can effectively enhance system reliability in the presence of rapidly growing large-load demand. This framework provides system planners, utilities, and regulators with a practical tool for maintaining reliable power system operation using energy storage as more large loads are integrated into the grid.

0.46

A Critical Review of Grid Integration Challenges and Flexibility Opportunities for Large-Scale Data Centers

eess.SY ·2026-10-14 ·Bibek Dhakal, Manohar Chamana, Biswambhar Gayen, Jatendar Kumar, S M Shams Rahman +5 more
similarity 0.66
Abstract

The rapid proliferation of cloud computing and artificial intelligence workloads is fundamentally reshaping the magnitude, spatial concentration, and electrical characteristics of data center power demand. Data centers differ from conventional commercial loads because they combine high rack densities, converter-dominated interfaces, thermally coupled cooling, uninterruptible power supplies, programmable workloads, and increasingly complex behind-the-meter generation and storage within a single facility. This review examines their grid integration from utility and sustainable-energy perspectives across resource planning, large-load interconnection, distribution feeders, market operation, real-time dynamics, power quality, and asset management. Particular attention is given to distribution-level issues that receive limited treatment in broader energy reviews: bidirectional operation on renewable-rich feeders, harmonic propagation and resonance, ride-through and reconnection, transformer derating, cable ampacity, neutral-conductor heating, protection, and measurement. Static, composite, physics-based dynamic, calibrated, impedance, electromagnetic transient, and hybrid load models are compared according to study purpose and data requirements, and utility coordination platforms, uninterruptible power supply and battery control, workload flexibility, renewable co-location, cogeneration, fuel cells, thermal storage, and clean firm supply are assessed. The central finding is that requested peak demand and annual energy matching alone cannot establish reliable or sustainable integration. Credible assessment must consider hourly and locational supply, network deliverability, marginal emissions, lifecycle and water impacts, backup obligations, rebound, asset health, and verified operating capability.

0.12