CS Paper Radar

Reliability-based Sizing of Energy Storage for Large Load Integration

Atri Bera, Chandan Chaudhary, Dilip Pandit, Cody J. Newlun, Tu A. Nguyen, Raymond H. Byrne, Joydeep Mitra

eess.SY ·submitted 2026-11-18 21:01 UTC · v1
published

Abstract

The number of large loads connected to the bulk power system has been increasing rapidly worldwide. Emerging high-demand facilities, particularly AI data centers, are introducing new challenges for power system planners. In absence of appropriate planning mechanisms, the addition of high volumes of data center loads will lead to an increase in outages, thus degrading reliability of the system. Energy storage systems (ESS) offer a promising solution to mitigate the reliability impacts of these large loads, due to their flexibility and fast-ramping characteristics. However, ESS should be judiciously sized and sited to maximize the reliability benefits to the grid. This paper presents a framework for the optimal sizing and siting of ESS to minimize the adverse reliability impacts of large load additions. First, a stochastic semi-Markov model is developed to model the load of AI data centers and generate profiles for several such facilities. These profiles are then incorporated into a Markov-chain Monte Carlo simulation-based composite system reliability assessment framework. A detailed nodal network model is used to quantify the reliability impacts of adding data centers and to identify buses most affected by large loads. Resource adequacy metrics are used to evaluate the overall system reliability impacts. ESS are then strategically sized and sited based on this analysis to mitigate the negative impacts of large loads on overall system reliability. The proposed framework is demonstrated using the RTS-GMLC 72-bus test system. The results show how ESS can effectively enhance system reliability in the presence of rapidly growing large-load demand. This framework provides system planners, utilities, and regulators with a practical tool for maintaining reliable power system operation using energy storage as more large loads are integrated into the grid.

Comment
12 pages, 1 figure, published as part of the proceedings of the 2026 Grid of the Future Symposium organized by the CIGRE US National Committee

Closest papers

Nearest neighbours by meaning across the whole index.

Steady-State Equivalent Circuit Model for Data Center Loads

eess.SY ·2026-08-18 ·Muhammad Hamza Ali, Peng Sang, Hyeon Woo, Hyein Kang, Sungyun Choi +1 more
similarity 0.66
Abstract

Planners currently represent data centers as aggregate constant-PQ or ZIP loads in steady-state interconnection and contingency studies. These aggregate models are computationally convenient. However, they obscure the electrical relationship between computational workloads, server utilization, and grid-side demand. They ignore the internal power-electronic conversion stages of IT loads and assume homogeneous workload distributions across the compute clusters. This hides operating-point-dependent converter losses and efficiency variations. We propose a steady-state equivalent-circuit model (ECM) for data centers, which explicitly builds circuit models for IT loads, power supply units, cooling, and auxiliary systems. For power supply units, the equivalent circuit model explicitly represents internal power-electronic conversion stages. For IT loads, we develop a utilization-dependent server power model, and we combine it with loss-aware ECMs of power supply units. This approach captures the grid-side impact of heterogeneous workload distributions while preserving compatibility with conventional power-flow analysis. We evaluate this data center ECM in large-scale transmission power flows, using Monte Carlo simulations under heterogeneous and homogeneous cluster utilization. In comparison with the fixed-efficiency constant-PQ model, the ECM predicts that the most stressed line exceeds its thermal limit in about 30% of Monte Carlo samples. The results further show that homogeneous server utilization overstates line-loading variability by 17%-46% relative to heterogeneous server utilization, depending on the intra-cluster workload correlation.

0.47

Scalable Reference Electrical Architectures for Modern Data Centers

eess.SY ·2026-11-11 ·Kiran Kumar Challa, Yan, Zhou, Kumarsinh Jhala
benchmarkhot direction similarity 0.65
Abstract · 5 pages, 3 figures, conference article

The rapid growth of cloud computing, artificial intelligence (AI), and high-performance computing is driving the deployment of data centers with electrical demands ranging from tens of megawatts to multi-gigawatt campuses, creating significant challenges for utility interconnection and power system planning. This paper presents scalable, vendor-neutral reference electrical architectures for colocation, hyperscale, and AI data centers. The proposed framework integrates modular Power PODs, hierarchical HV/MV/LV distribution, standby generation, uninterruptible power supplies (UPS), battery energy storage systems (BESS), and scalable utility interfaces into a unified planning methodology. Three representative Power POD configurations are developed to support systematic capacity expansion while maintaining consistent electrical topology and equipment sizing. The proposed architectures facilitate utility interconnection studies, equipment demand forecasting, transmission planning, and grid infrastructure assessment, providing an open and reproducible benchmark for evaluating the impacts of large-scale data center deployment on future power systems.

0.24

Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems

eess.SY ·2026-09-02 ·Pengyu Ren, Wei Sun, Fei Teng
similarity 0.64
Abstract

Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning systems can maintain IT service while limiting customer-initiated load reduction. This paper presents a voltage ride-through (VRT)-aware data center and grid co-planning framework that couples transmission-level fault simulation with an internal data center ride-through model. Python-based dynamic simulations generate point-of-interconnection (POI) voltage trajectories under selected network faults, and the resulting waveforms drive an internal model incorporating IT and cooling-load dynamics, DC-link, Uninterruptible Power Supply (UPS) response, and converter apparent power limits. The IEEE 118-bus case study shows that internal VRT capability can become a binding interconnection constraint: steady-state planning alone can overestimate feasible data center capacity, whereas increased UPS converter headroom progressively restores hosting capacity. Under the reduced-order response models studied, the grid-forming mode provides greater ride-through margin than the current-limited grid-following mode under the same network fault conditions. The results further show that VRT constraints can materially change both the total hosting capacity of data centers and its spatial allocation across candidate interconnection buses.

0.16

A Theory of Probabilistic Power Provisioning for Data Centers with Distributed Energy Storage

cs.IT cs.DCcs.PFeess.SY ·2026-08-13 ·Can Emre Koksal, Richard A. Barry, Artun Sel
similarity 0.64
Abstract · 26 pages, 7 figures, 5 tables

The growing power demands and variability of AI workloads make electrical power delivery a critical constraint in data-center operation. Distributed energy storage can reduce the power capacity required to support stochastic loads, but its benefits depend fundamentally on the statistics and time scales of demand. This paper develops a probabilistic framework that jointly characterizes provisioned power, energy-storage capacity, and the probability of overdraw. We show that storage-assisted provisioning separates into two operating regimes. In the Small Battery Region, overdraw is dominated by short-lived demand excursions and storage provides nearly linear reductions in the required power margin. In the Large Battery Region, overdraw results from sustained demand fluctuations over longer spans of time, and the required margin exhibits diminishing returns with storage. For this regime we introduce effective power, an analogue of effective bandwidth that captures the temporal statistics of the demand and gives an asymptotically tight characterization of the required power. We further quantify how temporal correlation and spatial aggregation affect storage requirements and statistical multiplexing gains, and extend the analysis to loads with multiple demand time scales. Finally, we evaluate the framework using power-demand traces from three production data centers spanning HPC, GPU-training, and cloud-service workloads. Despite their heterogeneous, cyclo-stationary and multi-modal behavior, the measured workloads exhibit the predicted regimes, and a simple four-parameter two-state model captures the dynamics governing their storage-power tradeoffs. The resulting framework provides both a probabilistic foundation and practical dimensioning principles for storage-assisted power provisioning in next-generation AI data centers.

0.38

Impact of Grid-Interactive Data Center Microgrids on Grid Reliability

eess.SY ·2026-11-11 ·Kiran Kumar Challa, Kumarsinh Jhala
hot direction similarity 0.64
Abstract · 5 Pages, 9 Figurs, Conference

Traditional data centers, operating as passive loads with standby backup resources, present significant challenges for grid integration due to their scale, rapid load fluctuations, and limited operational flexibility. This article investigates the transformative potential of grid-interactive data center microgrids, which integrate battery energy storage, on-site generation, and intelligent microgrid controllers to actively support both facility and grid operations. The proposed simulation framework enables the study comparing conventional and grid-interactive architectures under a range of steady-state and contingency scenarios. Results reveal that grid-interactive microgrids can substantially reduce peak grid demand, improve voltage stability, and improve system reliability especially when data center and system load peaks coincide. The findings highlight the critical role of coordinated resource management in enabling the reliable and efficient integration of large data center loads, and provide a practical methodology for assessing their system-level impacts.

0.26

Minimizing Grid Interconnection Capacity Requirements for AI Data Centers: A Developer-Side Planning Framework with Onsite Resources and Workload Flexibility

eess.SY ·2026-08-29 ·Hassan Zahid Butt, Rida Fatima, Xingpeng Li
similarity 0.63
Abstract

Securing grid interconnection capacity has become a bottleneck for AI data center projects and can take longer than constructing the facilities themselves. This mismatch can delay deployment for years, making early interconnection planning essential. This paper develops ICP-AI, an interconnection capacity planning framework from a data center developer's perspective. The framework minimizes grid import capacity under a prescribed onsite investment budget while jointly sizing photovoltaic (PV) and battery energy storage system (BESS) resources and scheduling deadline constrained workload flexibility. A secondary refinement fixes the minimum grid capacity and selects the minimum-investment PV-BESS portfolio among solutions that achieve that capacity. The framework is evaluated using monthly composite stress profiles across varying temporal assumptions, load shapes, flexible load fractions, and deferral windows. Results show that interconnection capacity reduction depends strongly on the planning environment: at a $100M budget, it is about 6% for the high load factor baseline, exceeds 10% under monthly average solar availability, and reaches 13.3% for a more diurnal load. At a $10M budget, 5% flexible load with a 1 h workload deferral window reduces BESS capacity from 15.30 to 4.87 MWh while increasing capacity reduction from 4.43% to 4.84%. To test sensitivity to temporal compression, the model is also solved over the full 8,760 h chronology, which preserves the main capacity and flexibility trends. Overall, ICP-AI quantifies the interconnection capacity and infrastructure substitution value of workload flexibility, providing an investment-interconnection frontier to support capital allocation and early project planning in constrained grid environments.

0.12

Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility

eess.SY ·2026-10-04 ·Rida Fatima, Xingpeng Li
similarity 0.63
Abstract

The rapid growth of AI data centers is creating concentrated electricity demands that can exceed available distribution network headroom and delay interconnection. This paper investigates whether capacity can be used effectively by coordinating flexibility on both sides of the interconnection. A day-ahead mixed integer second order cone programming framework maximizes feasible AI data center IT capacity using utility side conservation voltage reduction and network topology reconfiguration, together with data center workload shifting and reserve constrained uninterruptible power supply storage. Background feeder demand uses voltage dependent ZIP models, while the data center is modeled as constant power demand using Training, Inference, and Mixed workload profiles. A two-stage solution first maximizes interconnection capacity and then minimizes feeder losses for the retained capacity, with numerical relaxation screening. Studies on a 116-bus model derived from the IEEE 123-node feeder show that, at the constrained bus-60 connection point, grid side flexibility, driven almost entirely by network reconfiguration, increases feasible IT capacity by approximately 42.5-45.0%, while data center flexibility alone provides approximately 2.1-5.4% gains. Coordinated operation increases feasible IT capacity from approximately 10.5-10.6 MW under BASE operation to 15.3-16.0 MW, corresponding to gains of approximately 45.9-50.8%; the 16.0 MW Inference result is limited by the adopted UPS reserve requirement. Benefits are strongly location dependent and influenced by workload flexibility, deferral duration, PUE, UPS energy and reserve requirements, and feeder loading. Under a combined adverse operating condition, FULL capacity decreases by only 3.4% relative to the nominal Mixed case while retaining substantial additional capacity over BASE.

0.28

Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal Shifting

eess.SY ·2026-09-29 ·Suntao Su, Liang Du, Shengyi Wang
similarity 0.63
Abstract · 5 pages, 5 figures, conference

The rapid growth of artificial intelligence (AI) data centers has introduced new challenges to power system operation. As their power demand becomes larger and more variable, quantitatively characterizing their demand flexibility is increasingly important for effective power system coordination. However, heterogeneous workload characteristics and resource requirements make this flexibility difficult to characterize directly. This paper proposes a framework for assessing the grid-compatible demand flexibility of AI data centers via batch workload temporal shifting. An averaging-based resource usage processing method is developed to map fine-resolution CPU, GPU and memory usage into unified time intervals compatible with power system operation. A workload temporal scheduling model is then formulated to shift batch workloads while preserving execution continuity, delay constraints, and server resource capacities, and is coupled with a utilization-dependent server power model to translate workload scheduling decisions into server power demand. Two complementary flexibility metrics are evaluated: short-term peak demand shaving and the maximum duration of sustained power reduction. Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.

0.13