CS Paper Radar

Slasher: Power Flexibility for Cloud Datacenters

Liuzixuan Lin, Fiodar Kazhamiaka, Alok Gautam Kumbhare, Chaojie Zhang, Jaylen Wang, Hassan Khan, Rodrigo L. Assis, Mariana Rodrigues, Kyle Woolcock, Nithish Mahalingam, Brijesh Warrier, Rodrigo Fonseca, Ricardo Bianchini

cs.DC cs.OSeess.SY ·submitted 2026-08-26 17:01 UTC · v1

Abstract

Datacenters consume many megawatts of power, and regularly encounter scenarios that require modulating their power draw. These scenarios include datacenter infrastructure failures, power grid failures, grid services, and more, spanning a diverse range of requirements in terms of the power magnitude, the scope of the reduction, the notice time, and other dimensions. To address these scenarios, we have built Slasher, a general system for modulating the power of \azure datacenters to handle scenarios ranging from individual racks to regional multi-datacenter grid events. Slasher coordinates datacenter resources with the goal of meeting power targets while minimizing negative impact on hosted workloads. In this paper, we review the main power modulation scenarios, characterize the power reduction levers using data from production cloud datacenters, describe Slasher's system architecture, and formulate the cloud datacenter power modulation control problem. We also develop a high-fidelity datacenter simulator and propose a workload impact model, using them to design and evaluate power control algorithms.

Comment
18 pages, 15 figures

Closest papers

Nearest neighbours by meaning across the whole index.

Job-Level Workload Allocation for Data Centers Under Flexible Interconnections

eess.SY ·2026-11-14 ·Tanmay Mishra, Arash Omidi, Mads R. Almassalkhi
hot direction similarity 0.72
Abstract · Submitted to IEEE PES General Meeting 2027

Flexible interconnections allow data centers to connect to the grid sooner without upgrading the grid infrastructure, if they accept limits on their grid power during periods of grid stress. When a limit is reached, the data center must slow some of its computing jobs. This choice sets the cost of flexibility, because the work done by a job is worth far more than the energy it uses. This paper models how jobs respond when their power is reduced, and proposes a real-time method that shares the available power among jobs according to their value. It also gives grid planners a simple measure of how much power a data center can reduce, and for how long. A one-year case study of a 100-MW data center shows that the proposed method lowers the cost of meeting grid limits, and that on-site generation and storage lower it further.

0.24

Steady-State Equivalent Circuit Model for Data Center Loads

eess.SY ·2026-08-18 ·Muhammad Hamza Ali, Peng Sang, Hyeon Woo, Hyein Kang, Sungyun Choi +1 more
similarity 0.69
Abstract

Planners currently represent data centers as aggregate constant-PQ or ZIP loads in steady-state interconnection and contingency studies. These aggregate models are computationally convenient. However, they obscure the electrical relationship between computational workloads, server utilization, and grid-side demand. They ignore the internal power-electronic conversion stages of IT loads and assume homogeneous workload distributions across the compute clusters. This hides operating-point-dependent converter losses and efficiency variations. We propose a steady-state equivalent-circuit model (ECM) for data centers, which explicitly builds circuit models for IT loads, power supply units, cooling, and auxiliary systems. For power supply units, the equivalent circuit model explicitly represents internal power-electronic conversion stages. For IT loads, we develop a utilization-dependent server power model, and we combine it with loss-aware ECMs of power supply units. This approach captures the grid-side impact of heterogeneous workload distributions while preserving compatibility with conventional power-flow analysis. We evaluate this data center ECM in large-scale transmission power flows, using Monte Carlo simulations under heterogeneous and homogeneous cluster utilization. In comparison with the fixed-efficiency constant-PQ model, the ECM predicts that the most stressed line exceeds its thermal limit in about 30% of Monte Carlo samples. The results further show that homogeneous server utilization overstates line-loading variability by 17%-46% relative to heterogeneous server utilization, depending on the intra-cluster workload correlation.

0.47

Multi-Scale Datacenter Power Modulation

eess.SY ·2026-09-15 ·Akshay Sreekumar, Nicolas Christianson, Fiodar Kazhamiaka, Ram Rajagopal
similarity 0.69
Abstract

Cloud datacenters must increasingly modulate power in response to time-varying grid and infrastructure constraints. We study this problem as finite-horizon control of a networked hybrid dynamical system, where datacenter power and service capacity depend on interactions between servers, workers, and hosted services. Power can be reduced through fast continuous worker throttling, which acts immediately but degrades service capacity, and slow discrete server transitions, which provide deeper savings but evolve with delay. Coordinating these mechanisms yields a high-dimensional mixed-integer dynamic optimization problem which is intractable to solve at scale. We propose a hierarchical receding-horizon controller that separates slow server reconfiguration from fast throttling recourse. For fixed server states, the throttling layer reduces to a service-level convex recourse problem solved efficiently by dual decomposition. The server layer then uses a ranked-prefix search that evaluates candidate configurations through the recourse value over the planning horizon. Experiments on realistic instances with over 15,000 servers, 200,000 workers, and 1,400 services show that the controller satisfies time-varying power caps with no violations and substantially lower service impact than fast-only or slow-only baselines. Our method offers significant speedups compared to standard optimization solvers, computing near-optimal plans within a 20 second real-time control interval.

0.34

Creating Power Flexibility in Datacenters via Query Routing

cs.AI ·2026-11-03 ·Shivam Patel, Bingqing Chen, Jared Fernandez, Guannan Qu, Gauri Joshi
similarity 0.68
Abstract

The growing energy requirements of large language model inference highlight the need for datacenters to support safe grid operation by providing power demand flexibility, while maintaining service for interactive workloads. This work investigates query routing as a mechanism to enable such capability by dynamically allocating queries across different language model instances without deferring requests. We develop a general analytical framework that connects query arrival rates and sequence length distributions to token iteration time, request residence time, serving capacity, and power consumption of model instances. Leveraging this framework, we characterize the feasible query routing allocations and the corresponding power demand flexibilities, enabling the selection of routing strategies to achieve desired power consumption behavior. We validate our framework across four GPU platforms on language models ranging from 1B to 70B parameters, obtaining 2.8% mean absolute percentage error in estimating achievable power flexibility. We evaluate our approach on a real trace-driven simulation of a 10,000 H100 GPUs datacenter, exhibiting flexibility up to 16% of total power consumption, with 90% of the desired power reduction achieved within approximately 10 seconds. These results establish query routing as an effective mechanism for datacenter power demand flexibility and demonstrate the broader applicability of our proposed framework to datacenter level planning and orchestration.

0.12

Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal Shifting

eess.SY ·2026-09-29 ·Suntao Su, Liang Du, Shengyi Wang
similarity 0.68
Abstract · 5 pages, 5 figures, conference

The rapid growth of artificial intelligence (AI) data centers has introduced new challenges to power system operation. As their power demand becomes larger and more variable, quantitatively characterizing their demand flexibility is increasingly important for effective power system coordination. However, heterogeneous workload characteristics and resource requirements make this flexibility difficult to characterize directly. This paper proposes a framework for assessing the grid-compatible demand flexibility of AI data centers via batch workload temporal shifting. An averaging-based resource usage processing method is developed to map fine-resolution CPU, GPU and memory usage into unified time intervals compatible with power system operation. A workload temporal scheduling model is then formulated to shift batch workloads while preserving execution continuity, delay constraints, and server resource capacities, and is coupled with a utilization-dependent server power model to translate workload scheduling decisions into server power demand. Two complementary flexibility metrics are evaluated: short-term peak demand shaving and the maximum duration of sustained power reduction. Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.

0.13

Scalable Reference Electrical Architectures for Modern Data Centers

eess.SY ·2026-11-11 ·Kiran Kumar Challa, Yan, Zhou, Kumarsinh Jhala
benchmarkhot direction similarity 0.67
Abstract · 5 pages, 3 figures, conference article

The rapid growth of cloud computing, artificial intelligence (AI), and high-performance computing is driving the deployment of data centers with electrical demands ranging from tens of megawatts to multi-gigawatt campuses, creating significant challenges for utility interconnection and power system planning. This paper presents scalable, vendor-neutral reference electrical architectures for colocation, hyperscale, and AI data centers. The proposed framework integrates modular Power PODs, hierarchical HV/MV/LV distribution, standby generation, uninterruptible power supplies (UPS), battery energy storage systems (BESS), and scalable utility interfaces into a unified planning methodology. Three representative Power POD configurations are developed to support systematic capacity expansion while maintaining consistent electrical topology and equipment sizing. The proposed architectures facilitate utility interconnection studies, equipment demand forecasting, transmission planning, and grid infrastructure assessment, providing an open and reproducible benchmark for evaluating the impacts of large-scale data center deployment on future power systems.

0.24

Data Center Load Reductions: Attribution, Measurement Limits, and Estimation

eess.SY ·2026-10-28 ·Abdallah Alalem Albustami, Ahmad F. Taha, Mohammad Alwahdanee, Zuhaib Shakeel Muhammad
similarity 0.67
Abstract

Hundreds of gigawatts of data center loads are seeking interconnection in the United States given the massive growth of artificial intelligence and cloud computing. In recent years, several incidents of data centers reducing their loads by hundreds to thousands of megawatts have been documented, raising grid reliability concerns. U.S. regulators have since ordered reliability standards for the integration of computational loads, and the North American Electric Reliability Corporation (NERC) now calls on transmission owners to install disturbance recorders at these facilities to support root cause analysis. Such recorders usually observe only electrical quantities at the point of interconnection (POI). A sudden load reduction can be caused by a change in workload or a switch to backup supply. This work shows when POI measurements can distinguish the two mechanisms. It is established that they can produce identical POI voltage and current in a quasi-static constant power model, and during the transient their separation depends on the reduction relative to measurement noise, the clearing time, the dynamics through which workload reaches the POI, and the recorder bandwidth. When POI data are insufficient, an estimator that uses workload data is proposed to determine how much of the facility stayed connected. The results of this work identify the measurements and grid information utilities need to determine why data center load dropped.

0.31

A Critical Review of Grid Integration Challenges and Flexibility Opportunities for Large-Scale Data Centers

eess.SY ·2026-10-14 ·Bibek Dhakal, Manohar Chamana, Biswambhar Gayen, Jatendar Kumar, S M Shams Rahman +5 more
similarity 0.66
Abstract

The rapid proliferation of cloud computing and artificial intelligence workloads is fundamentally reshaping the magnitude, spatial concentration, and electrical characteristics of data center power demand. Data centers differ from conventional commercial loads because they combine high rack densities, converter-dominated interfaces, thermally coupled cooling, uninterruptible power supplies, programmable workloads, and increasingly complex behind-the-meter generation and storage within a single facility. This review examines their grid integration from utility and sustainable-energy perspectives across resource planning, large-load interconnection, distribution feeders, market operation, real-time dynamics, power quality, and asset management. Particular attention is given to distribution-level issues that receive limited treatment in broader energy reviews: bidirectional operation on renewable-rich feeders, harmonic propagation and resonance, ride-through and reconnection, transformer derating, cable ampacity, neutral-conductor heating, protection, and measurement. Static, composite, physics-based dynamic, calibrated, impedance, electromagnetic transient, and hybrid load models are compared according to study purpose and data requirements, and utility coordination platforms, uninterruptible power supply and battery control, workload flexibility, renewable co-location, cogeneration, fuel cells, thermal storage, and clean firm supply are assessed. The central finding is that requested peak demand and annual energy matching alone cannot establish reliable or sustainable integration. Credible assessment must consider hourly and locational supply, network deliverability, marginal emissions, lifecycle and water impacts, backup obligations, rebound, asset health, and verified operating capability.

0.12