CS Paper Radar

Quantifying EnergyNet performance: a simulation-based framework for decentralized energy networks

Max Collins, Jonas Birgersson, Marc A. Weiss, Jimmy Chen, Mark Z. Jacobson, Newsha K. Ajami, Daniel Kammen, Tomas Kåberger, Franklin Carrero-Martínez, Michael Menser, Henrik Ny, Lou Riordan, Jill G. Ferguson

eess.SY ·submitted 2026-09-29 13:52 UTC · v2

Abstract

Power transmission and distribution infrastructure connects generation with consumers. Extreme weather, infrastructure failures, and geopolitical conflicts increasingly disrupt these connections, leaving large groups without electricity until service is restored. Local generation, storage, and controllable loads pose challenges but also enable new ways to organize energy systems. EnergyNet is a decentralized architecture of interconnected power electronic Energy Routers. Each coordinates local loads, generation, storage, and grid connections. Bidirectional Energy Links enable exchange between routers, while the Energy Protocol communicates needs and availability to coordinate transfers. EnergyNet can operate with or without the public grid. This paper develops a quantitative framework for modeling and evaluating EnergyNet. It represents topology, prioritized loads, generation, storage, grid connections, links, and component limits. Receding-horizon optimization calculates energy allocation and exchange, supporting also disturbance and reliability analysis. A three-router case illustrates energy sharing and islanded operation. The framework then models a Stanford University campus microgrid and an off-grid microgrid in Half Moon Bay. Under low-solar conditions, electric bus visits support the off-grid microgrid while preserving transport service. Finally, the paper models an EnergyNet under construction in Lund, Sweden, comprising ten buildings and 278 apartments. Full service is maintained in summer and winter and after the loss of one grid interface or Energy Link. Losing two links partitions the network; service in the island depends on local resources and repair time. Reliability screening identifies partitioning as rare but credible. Monte Carlo analysis shows full critical service in sampled summer conditions and median continuous critical service of approximately 92% in winter.

Closest papers

Nearest neighbours by meaning across the whole index.

EnergyNet in Practice: Long Grid, Short Grids and Mobility-Based Energy Peering

eess.SY ·2026-10-07 ·Jonas Birgersson, Max Collins, Marc A. Weiss, Jimmy Chen, Daniel Kammen +8 more
position similarity 0.66
Abstract

Electrification is planned as a network problem: more demand, more upstream capacity, local resources waiting for reinforcement. We argue that a material part of that bill, in money and time, follows from architecture, not electrification itself, and propose the Short Grid as the deployment unit: a locally controlled building, block or campus whose demand, generation, storage and local market operate behind Energy Routers enforcing an approved connection envelope to the Long Grid. Because the envelope governs exchange, not installed capacity, local resources can grow and many sites can build in parallel at the pace of PV and EV installation, not grid reinforcement. PV and EV batteries dominate today, but the architecture is general: any generation or storage, fixed or mobile, fits behind the same boundary and interfaces. EnergyNet Operators coordinate exchange among Short Grids and with the Long Grid; protection stays local; Vehicle-to-EnergyNet (V2EN) and Mobility-Based Energy Peering (MEP) make mobility-financed batteries accessible within and between them; priority-based operation protects critical services in shortage. We test it in models, not yet the field: a ten-building neighbourhood in Lund, Sweden; a bus-linked microgrid pair at Stanford and Half Moon Bay; and a proposed 20-site network in Rockaway, New York. Households and services are the largest demand category in Sweden, Denmark, Norway, California and New York (484 TWh/yr); halving their grid imports would be about 242 TWh. Europe's network investment to 2040 is estimated above EUR 1.2 trillion; modelling shows it depends on system design. Negagrid value, following the negawatt, counts network investment avoided, downsized or deferred, net of local substitute costs. "Don't pay twice": build coordinated local capability first; reinforce the Long Grid for what remains.

0.19

A Critical Review of Grid Integration Challenges and Flexibility Opportunities for Large-Scale Data Centers

eess.SY ·2026-10-14 ·Bibek Dhakal, Manohar Chamana, Biswambhar Gayen, Jatendar Kumar, S M Shams Rahman +5 more
similarity 0.64
Abstract

The rapid proliferation of cloud computing and artificial intelligence workloads is fundamentally reshaping the magnitude, spatial concentration, and electrical characteristics of data center power demand. Data centers differ from conventional commercial loads because they combine high rack densities, converter-dominated interfaces, thermally coupled cooling, uninterruptible power supplies, programmable workloads, and increasingly complex behind-the-meter generation and storage within a single facility. This review examines their grid integration from utility and sustainable-energy perspectives across resource planning, large-load interconnection, distribution feeders, market operation, real-time dynamics, power quality, and asset management. Particular attention is given to distribution-level issues that receive limited treatment in broader energy reviews: bidirectional operation on renewable-rich feeders, harmonic propagation and resonance, ride-through and reconnection, transformer derating, cable ampacity, neutral-conductor heating, protection, and measurement. Static, composite, physics-based dynamic, calibrated, impedance, electromagnetic transient, and hybrid load models are compared according to study purpose and data requirements, and utility coordination platforms, uninterruptible power supply and battery control, workload flexibility, renewable co-location, cogeneration, fuel cells, thermal storage, and clean firm supply are assessed. The central finding is that requested peak demand and annual energy matching alone cannot establish reliable or sustainable integration. Credible assessment must consider hourly and locational supply, network deliverability, marginal emissions, lifecycle and water impacts, backup obligations, rebound, asset health, and verified operating capability.

0.12

AI Data Centers Meet Electrical Grids: A Review of Power Challenges and Coordinated Solutions

eess.SY ·2026-10-06 ·Mariam Mughees, Yuzhuo Li, Yize Chen, Yunwei Ryan Li
survey similarity 0.63
Abstract

Artificial intelligence (AI) workloads are creating large, power-electronic loads whose effects on power systems depend on location, temporal variability, controllability, and interactions with other loads and resources. Annual electricity consumption alone cannot capture these effects. This review examines how AI data centers affect power systems stability, renewable-energy integration, and low-carbon planning by tracing the power-delivery chain from accelerators and workloads through rack converters, uninterruptible power supplies (UPS), storage, and microgrids to the transmission point of interconnection. Reported oscillatory events and multi-gigawatt load transfers highlight how facility responses can amplify disturbances, while programmable workloads and controllable power converters offer opportunities for demand flexibility. Challenges and mitigation strategies are organized across device, rack, facility, and power systems levels, spanning millisecond-to-year timescales. A bandwidth-matching framework relates disturbances to the response capabilities of mitigation resources. The review distinguishes computational energy efficiency from power systems and sustainability outcomes: lower energy consumption per token does not necessarily reduce peak demand, electrical disturbances, or carbon emissions. It examines how coordinated workload scheduling, grid-interactive UPS systems, storage, high-voltage DC distribution, and flexible interconnection can support reliability, efficiency, and decarbonization. Key research needs include dynamic load models, high-bandwidth telemetry, carbon-and grid-aware scheduling, and mechanisms for valuing flexible computational demand.

0.08

Converter-Aware Coordination of Computing Flexibility in Behind-the-Meter Data Centers

eess.SY ·2026-10-16 ·Ruolan Cui, Ruizhang Yang, Chenxi Hu, Franxis Yunhe Hou
similarity 0.62
Abstract

Data centers are emerging as large electricity consumers whose demand can be reshaped through workload scheduling. However, computing flexibility in behind-the-meter facilities does not automatically translate into electrically realizable power flexibility. Ignoring converter and network operating limits may cause converter overloads, protection trips, and interruptions to power supply and computing services. This paper proposes a converter-aware intraday scheduling methodology. First, a task-level mixed-integer linear formulation preserves synchronous training configurations and completion requirements, while Minkowski-sum aggregation and Shapley--Folkman convexification yield a linear inference-pool representation without unit-level binary variables. The latter admits a conditional relative relaxation-gap bound that decreases inversely with pool size. Second, a four-node electrical model links computing demand, on-site injections, and grid exchange to converter and network limits through lifted voltage variables and second-order cone relaxation. Finally, a mixed-integer model coordinates workloads, photovoltaic generation, energy storage, and grid purchases. Case studies show that electrical limits reshape scheduling and renewable utilization, while on-site resources reduce grid dependence. Under the studied conditions, fixed training cannot support full inference service within voltage limits, whereas coordinated scheduling achieves negligible inference shortage and passes verification against the original alternating-current model. These findings demonstrate the role of computing--electrical coordination in realizing the operational value of workload flexibility.

0.14

Steady-State Equivalent Circuit Model for Data Center Loads

eess.SY ·2026-08-18 ·Muhammad Hamza Ali, Peng Sang, Hyeon Woo, Hyein Kang, Sungyun Choi +1 more
similarity 0.61
Abstract

Planners currently represent data centers as aggregate constant-PQ or ZIP loads in steady-state interconnection and contingency studies. These aggregate models are computationally convenient. However, they obscure the electrical relationship between computational workloads, server utilization, and grid-side demand. They ignore the internal power-electronic conversion stages of IT loads and assume homogeneous workload distributions across the compute clusters. This hides operating-point-dependent converter losses and efficiency variations. We propose a steady-state equivalent-circuit model (ECM) for data centers, which explicitly builds circuit models for IT loads, power supply units, cooling, and auxiliary systems. For power supply units, the equivalent circuit model explicitly represents internal power-electronic conversion stages. For IT loads, we develop a utilization-dependent server power model, and we combine it with loss-aware ECMs of power supply units. This approach captures the grid-side impact of heterogeneous workload distributions while preserving compatibility with conventional power-flow analysis. We evaluate this data center ECM in large-scale transmission power flows, using Monte Carlo simulations under heterogeneous and homogeneous cluster utilization. In comparison with the fixed-efficiency constant-PQ model, the ECM predicts that the most stressed line exceeds its thermal limit in about 30% of Monte Carlo samples. The results further show that homogeneous server utilization overstates line-loading variability by 17%-46% relative to heterogeneous server utilization, depending on the intra-cluster workload correlation.

0.47

Optimal Coordination of Heat Pump Demand Flexibility and Battery Energy Storage Considering the Operation of Distribution Networks

eess.SY ·2026-10-06 ·Gustavo L. Aschidamini, Guilherme S. Castiglio, Mariana Resener
similarity 0.60
Abstract

Electrifying space heating with heat pumps (HP) and backup electric-resistance heaters (ERH) is incentivized to support decarbonization but increases voltage and thermal issues in distribution networks. Direct load control (DLC) of smart thermostats (ST) provide grid support, yet, to the best of our knowledge, existing methods do not co-optimize this flexibility with grid-scale battery energy storage systems (BESS) and voltage-regulation devices, and do not use ERH for preheating, limiting peak demand reduction and undervoltage mitigation. We propose a mixed-integer linear programming (MILP)-based model predictive control (MPC) framework that coordinates ST setpoints for preheating and setback, grid-scale BESS, on-load tap changers, switched capacitor banks, and step voltage regulators. The framework is evaluated on 23-node and 733-node distribution networks, including a real-data-based feeder, across multiple realized days. On the 23-node feeder with 50% HP penetration and 50% DLC participation, the proposed framework reduces the feeder peak by 23.1%, and by 27.1% with the co-optimized BESS. Rolling-horizon setpoint optimization contributes 6.5 percentage points beyond a day-ahead ST schedule (16.6%), and dispatching the ERH for preheating adds 2.7 percentage points beyond backup-only operation (20.4%). On the 733-node feeder, where thermal congestion is the binding constraint, the framework reduces overloaded branches by 94% and overloaded transformers by 47%. These results demonstrate the potential of coordinated demand flexibility and voltage regulation to accommodate heating electrification.

0.12

Scalable Reference Electrical Architectures for Modern Data Centers

eess.SY ·2026-11-11 ·Kiran Kumar Challa, Yan, Zhou, Kumarsinh Jhala
benchmarkhot direction similarity 0.60
Abstract · 5 pages, 3 figures, conference article

The rapid growth of cloud computing, artificial intelligence (AI), and high-performance computing is driving the deployment of data centers with electrical demands ranging from tens of megawatts to multi-gigawatt campuses, creating significant challenges for utility interconnection and power system planning. This paper presents scalable, vendor-neutral reference electrical architectures for colocation, hyperscale, and AI data centers. The proposed framework integrates modular Power PODs, hierarchical HV/MV/LV distribution, standby generation, uninterruptible power supplies (UPS), battery energy storage systems (BESS), and scalable utility interfaces into a unified planning methodology. Three representative Power POD configurations are developed to support systematic capacity expansion while maintaining consistent electrical topology and equipment sizing. The proposed architectures facilitate utility interconnection studies, equipment demand forecasting, transmission planning, and grid infrastructure assessment, providing an open and reproducible benchmark for evaluating the impacts of large-scale data center deployment on future power systems.

0.24

Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility

eess.SY ·2026-10-04 ·Rida Fatima, Xingpeng Li
similarity 0.60
Abstract

The rapid growth of AI data centers is creating concentrated electricity demands that can exceed available distribution network headroom and delay interconnection. This paper investigates whether capacity can be used effectively by coordinating flexibility on both sides of the interconnection. A day-ahead mixed integer second order cone programming framework maximizes feasible AI data center IT capacity using utility side conservation voltage reduction and network topology reconfiguration, together with data center workload shifting and reserve constrained uninterruptible power supply storage. Background feeder demand uses voltage dependent ZIP models, while the data center is modeled as constant power demand using Training, Inference, and Mixed workload profiles. A two-stage solution first maximizes interconnection capacity and then minimizes feeder losses for the retained capacity, with numerical relaxation screening. Studies on a 116-bus model derived from the IEEE 123-node feeder show that, at the constrained bus-60 connection point, grid side flexibility, driven almost entirely by network reconfiguration, increases feasible IT capacity by approximately 42.5-45.0%, while data center flexibility alone provides approximately 2.1-5.4% gains. Coordinated operation increases feasible IT capacity from approximately 10.5-10.6 MW under BASE operation to 15.3-16.0 MW, corresponding to gains of approximately 45.9-50.8%; the 16.0 MW Inference result is limited by the adopted UPS reserve requirement. Benefits are strongly location dependent and influenced by workload flexibility, deferral duration, PUE, UPS energy and reserve requirements, and feeder loading. Under a combined adverse operating condition, FULL capacity decreases by only 3.4% relative to the nominal Mixed case while retaining substantial additional capacity over BASE.

0.29