Strengthening AC optimal power flow relaxation through offline bound tightening and linear approximations

Xiangxin An, Constance Crozier, Santanu S. Dey

eess.SY math.OC ·submitted 2026-10-23 00:07 UTC · v1

Abstract

The alternating-current optimal power flow (ACOPF) problem is fundamental to power system operation and planning, but its nonconvexity makes globally optimal solutions of large-scale instances computationally challenging. Convex relaxations provide tractable lower bounds for assessing solution quality and supporting global optimization, although their effectiveness depends strongly on relaxation strength. This paper proposes an offline convexification and bound tightening framework for constructing strong linear programming (LP) relaxations for families of related ACOPF instances. Rather than repeating the tightening procedure for each instance, we compute variable bounds and second-order cone outer-approximation (SOC-OA) cuts offline using a demand-slack model and reuse them for subsequent instances with the same topology and admissible demand variations. Computational results on PGLib instances show that the fully offline approach achieves an average gap of $4.32\%$, compared with $3.80\%$ for the fully online approach, while achieving an average speedup of approximately $272\times$. The results demonstrate that offline convexification and bound tightening can recover most of the relaxation improvement of online tightening while significantly reducing the computational burden for repeated ACOPF evaluations.

Comment
15 pages, 4 figures

Closest papers

Nearest neighbours by meaning across the whole index.

Quantifying the Cost of Restoring AC Feasibility for Approximate Optimal Power Flow Solutions

eess.SY math.OC ·2026-11-11 ·Sanjay Johnson, Sungho Shin
theory similarity 0.69
Abstract · 5 pages, 4 figures, submitted to 2027 IEEE Power & Energy Society General Meeting

Power system operations rely on approximate solutions of the AC optimal power flow problem, most notably the DC optimal power flow used in security-constrained unit commitment and economic dispatch, while convex relaxations, machine learning surrogates, and other approximations are studied extensively in the academic literature. Because these approximations neglect or relax parts of the AC power flow equations, their solutions must be adjusted before dispatch; for example, the DC optimal power flow, which neglects transmission losses, reactive power, and voltage magnitude variations, is known to produce solutions that are always infeasible. The cost of this adjustment is not adequately understood. This paper proposes a method that quantifies, for any approximate solution, the minimum cost of the adjustments that restore AC feasibility, which is a lower bound on the cost of the heuristic adjustments used in practice. We apply it to the DC optimal power flow, the second-order cone and quadratic convex relaxations, and the AC optimal power flow solved to a loose relative tolerance of $10^{-4}$ instead of $10^{-8}$. Relative to the AC optimal power flow solution obtained from a local nonlinear optimization solver, and even with the minimum adjustment, the DC optimal power flow requires adjusting, on average, generators that account for 15.6% of total generation capacity and incurs a 1.10% cost increase; the convex relaxations require more adjustment (17.2% and 16.9%) but smaller cost increases (0.68% and 0.78%); and the loose-tolerance AC optimal power flow requires 6.1% and incurs 0.42%. These results indicate significant value in operating markets directly on the AC optimal power flow, which avoids the distortion of the dispatch and prices caused by heuristic feasibility restoration.

0.35

Low-Rank and Lifted Semidefinite Programming for Mixed-Integer Polynomial Power Grid Optimization

eess.SY math.OC ·2026-09-29 ·Samuel Chevalier
similarity 0.64
Abstract · Submitted to Allerton 2026

Can a local solver return the guaranteed globally optimal solution to a nonconvex mixed-integer polynomial power grid optimization problem? By mixing low-rank semidefinite programming (SDP) and moment-based lifting in the Lasserre hierarchy, this paper provides anecdotal evidence in the affirmative. Specifically, we iteratively tighten a moment-based relaxation of the AC Optimal Transmission Switching (AC-OTS) problem, including higher order moment-based constraints, rooted in the Lasserre hierarchy, until it is tight (i.e., primal feasible). We then re-solve this problem using a local, low-rank SDP solver (Knitro), plugging the associated dual variables into a bounding Lagrange dual function. By demonstrating primal and dual objective agreement and primal feasibility, we confirm the solution as the exact, global solution. From these initial results, we hypothesize that mixing (i) low-rank (i.e., highly scalable) SDP methods with (ii) moment-based relaxation tightening could be a scalable alternative to global branch-and-bound-based methods.

0.49

Modeling of Network Constraints in Large-scale Capacity Expansion Optimization of Power Grids

eess.SY math.OC ·2026-08-28 ·Yu Weng, Lara Booth, Priya L. Donti, Ruaridh Macdonald
publishedtheoryhot direction similarity 0.63
Abstract

Capacity expansion modeling plays a critical role in optimizing the deployment of new generation, storage, and transmission, typically at national and regional levels. To support long-term planning, these models consider a large set of energy technologies and policies, along with decades of weather and demand data. Realistic capacity expansion models thus become high-dimensional optimization problems, with hundreds of millions of variables and constraints, which are challenging to solve. A common strategy to address this complexity is to omit non-linear, non-convex AC optimal power flow (ACOPF) constraints and instead use linearized power balance equations or transport formulations. While these simplifications improve tractability, they limit our understanding of how power flow and the physical properties of power networks impact investment decisions across generation, storage, and transmission infrastructure. This paper addresses this gap by extending the GenX capacity expansion model to incorporate fixed point theorem-based network constraints. These embed ACOPF-based considerations while maintaining the tractability of the planning model, nearly preserving the dimensionality of the transport formulation and incurring only modest runtime increases. This approach is much cheaper than embedding ACOPF directly, making it appropriate for large-scale capacity planning problems. We compare our approach to the original transport-based GenX model as well as a non-linear, non-convex version that incorporates the full ACOPF constraints, for a case study of the ISO New England grid.

0.47

Converter-Aware Coordination of Computing Flexibility in Behind-the-Meter Data Centers

eess.SY ·2026-10-16 ·Ruolan Cui, Ruizhang Yang, Chenxi Hu, Franxis Yunhe Hou
similarity 0.62
Abstract

Data centers are emerging as large electricity consumers whose demand can be reshaped through workload scheduling. However, computing flexibility in behind-the-meter facilities does not automatically translate into electrically realizable power flexibility. Ignoring converter and network operating limits may cause converter overloads, protection trips, and interruptions to power supply and computing services. This paper proposes a converter-aware intraday scheduling methodology. First, a task-level mixed-integer linear formulation preserves synchronous training configurations and completion requirements, while Minkowski-sum aggregation and Shapley--Folkman convexification yield a linear inference-pool representation without unit-level binary variables. The latter admits a conditional relative relaxation-gap bound that decreases inversely with pool size. Second, a four-node electrical model links computing demand, on-site injections, and grid exchange to converter and network limits through lifted voltage variables and second-order cone relaxation. Finally, a mixed-integer model coordinates workloads, photovoltaic generation, energy storage, and grid purchases. Case studies show that electrical limits reshape scheduling and renewable utilization, while on-site resources reduce grid dependence. Under the studied conditions, fixed training cannot support full inference service within voltage limits, whereas coordinated scheduling achieves negligible inference shortage and passes verification against the original alternating-current model. These findings demonstrate the role of computing--electrical coordination in realizing the operational value of workload flexibility.

0.14

Machine learning-guided real-time AC optimal transmission switching

eess.SY ·2026-10-28 ·Weimin Huang, Weiwei Yang, Bistra Dilkina, Konstantina Mellou, Ishai Menache +3 more
benchmark similarity 0.61
Abstract

The operation of power grids has substantial economic consequences, affecting generation costs and, ultimately, electricity prices. The Optimal Transmission Switching (OTS) problem seeks to reduce these costs by selectively switching off transmission lines. However, OTS gives rise to a challenging mixed-integer nonlinear optimization problem that is difficult to solve at operationally relevant timescales, particularly as rapidly changing loads create a need for real-time switching decisions. To address this challenge, we develop a machine learning-guided method that identifies high quality line switching decisions in real time. Specifically, we construct a grid-specific switching-value model that rapidly estimates the generation-cost reduction associated with opening transmission lines by fine-tuning a pretrained model for AC optimal power flow (AC-OPF). The switching-value model provides signals to guide promising switching decisions, and topologies proposed by the model are evaluated using exact AC-OPF solvers to verify feasibility and obtain the actual generation cost. We develop multiple strategies that use the ML surrogate to efficiently explore the combinatorial space of transmission topologies, including Fixed-Rank Search, Adaptive-Rank Search, and Swap-Enhanced Search. Across multiple benchmark networks, our proposed algorithms identify line switching decisions that significantly reduce generation cost within a 50s computational budget. In particular, under a realistic data center buildout scenario on the 2,000-bus synthetic Texas grid, our approach reduces generation costs by 31.97% and gross nodal load payments by 94.34%. More broadly, our results demonstrate that a fine-tuned surrogate can effectively guide search even without guaranteeing feasibility, enabling classical optimization methods to tackle large nonlinear combinatorial problems on operationally relevant timescales.

0.26

Benchmarking a Grid Foundation Model for AC Optimal Power Flow: Feasibility and Warm-Start Results on Synthetic Texas and South Carolina Grids

eess.SY ·2026-11-17 ·Tam Kemabonta, Brighton Ombuki, Vladimir Abdelnour
similarity 0.61
Abstract · 5 pages, 3 figures, 2 tables. Submitted to the 2027 IEEE PES General Meeting

Learning-based surrogates for alternating-current optimal power flow (AC-OPF) are often judged by the gap between their objective value and that of a nonlinear solver, which does not show that a prediction satisfies power balance and network limits. This paper tests whether predictions from the pretrained foundation model GridSFM-Open 1.1.0, recently released by Microsoft, are feasible AC-OPF operating points and whether they are useful initial values for a nonlinear solver. The model was evaluated zero-shot and after fine-tuning on 10, 100, and 1,000 labeled scenarios (FT10, FT100, and FT1000) on 500 scenarios for each of two synthetic grids, ACTIVSg2000 (Texas) and ACTIVSg500 (South Carolina), with Ipopt, MATPOWER MIPS, and pandapower PIPS as solver references. The lowest Texas median cost gap, 0.44\% for FT100, coincided with thermal violations in 24.1\% of cases and a median maximum bus power mismatch of 89 MW and 197 Mvar. Texas zero-shot predictions had a median maximum mismatch of 648 MW and 1,641 Mvar, and every South Carolina case violated a thermal limit for every model variant. Seeding Ipopt with FT1000 predictions gave geometric-mean solve-time speedups of 1.55x on South Carolina and 1.12x on Texas (p = 0.06, not significant at the 5\% level), while zero-shot seeds slowed South Carolina solves (0.26x). A small objective gap therefore did not indicate feasibility: although median zero-shot inference took only 1.32 s on Texas and 0.157 s on South Carolina on a shared host, every prediction still required a nonlinear solver, and fine-tuned predictions gave modest, grid-dependent warm-start speedups while zero-shot predictions slowed convergence on one grid. GridSFM may therefore be useful for initializing a nonlinear solver, but obtaining feasible AC-OPF solutions still required the solver.

0.18

Convex-SKM-Net: Low-Latency Block Halfspace Corrections for Neural Convex Constraint Satisfaction

cs.LG cs.AImath.OC ·2026-10-28 ·Haoyu Zhu, Xiaochen Zhang, Qingchun Hou
benchmarktheory similarity 0.60
Abstract

Fast inference and strict constraint satisfaction are essential for learning-based decision-making. Existing methods often rely on constraint-specific projections or feasible-set parameterizations, while iterative repair can be costly. We introduce Convex-SKM-Net, a convex constraint-satisfaction layer that forms linearization halfspaces from residual and (sub)gradient oracles without constraint-specific inequality projectors. It applies fixed-depth dual projected-gradient descent (dual PGD) to minimum-displacement block problems using GPU-friendly matrix operations. We jointly learn the predictor and a positive-definite mobility, adapting the correction geometry to improve objective quality. We prove convergence of the outer iterates at fixed dual depth and linear convergence in distance under Slater's condition and bounded subgradients. All our test outputs on three second-order-cone model-predictive control (SOC-MPC) horizons and six power-system convex relaxations satisfy a $10^{-3}$ feasibility tolerance. Comparisons with the latest constraint-satisfaction methods show inference speedups of up to $144.3\times$ on SOC-MPC and $7.7\times$ on a convex quadratically constrained quadratic programming (QCQP) benchmark with joint training. On QCQP, the mean objective gap is $0.012\%$, with full test feasibility at $10^{-4}$. Learning mobility reduces the five-seed affine-task mean gap by $22.4\%$ and improves gaps in matched power-system comparisons.

0.10

Differentiable Electricity-Market Clearing for Gradient-Based Planning

cs.LG cs.CY ·2026-09-02 ·Luca Mungo, Maarten P. Scholl, Arnau Quera-Bofarull
similarity 0.60
Abstract · 9 pages, 4 figures

Planning a large data center is difficult because a facility big enough to matter changes the electricity prices it will pay. Those prices are set by market clearing, a constrained optimization problem solved anew in every operating condition. However, simulating the market tells a planner how a candidate plan performs but not how to improve it. Here we treat market clearing as a differentiable optimization layer: each forward pass solves the market, and reverse-mode automatic differentiation propagates the planning cost back through the cleared prices to the plan. After validating these gradients against finite differences, we apply them to a concrete problem: allocating 50 MW of data-center load across six candidate buses in two synthetic networks, under a fixed cost per active site, evaluated over 36 operating states. Judged against exhaustive enumeration of all site combinations, gradient optimization recovers the continuous allocations almost exactly, with worst-case objective gaps of 2.3\% and 8.5\% of the cost difference between the best and worst single site. Its one systematic error is instructive: near the costs at which a site should close, the smooth relaxation of the discrete site count shrinks the site rather than closing it, so discrete transitions arrive late. Differentiable market clearing thus turns market-aware planning into a problem gradients can search.