CS Paper Radar

PyPSA-Libya: An Open-Source Energy System Model for National Decarbonization and Hydrogen Export Pathways

Mohamed Abuella

cs.CE eess.SY ·submitted 2026-10-28 00:26 UTC · v1
code/data

Abstract

Libya possesses significant renewable energy potential that remains largely untapped. This paper presents PyPSA-Libya, a national-scale model built on the PyPSA-Earth framework, designed to explore optimal transition pathways for the Libyan power sector. We present two primary studies: (1) an electricity-only capacity expansion analysis comparing a zero-emission constraint against an unconstrained baseline at 36-cluster resolution, and (2) a sector-coupled hydrogen export study evaluating the levelized cost of exporting 70 TWh/year of hydrogen to Europe under three technological scenarios and a 100 EUR/tonne CO2 carbon tax regime. Results indicate that while solar PV dominates the domestic capacity mix, integration of hydrogen production significantly alters grid storage requirements. Furthermore, under carbon pricing, steam methane reforming with carbon capture (SMR-CC) frequently out-competes pure green electrolysis, establishing a lower-cost compliance pathway for cross-border export. The model, data, and configuration files are released under an open-source license to support transparent energy planning in Libya.

Comment
36 pages, 15 figures, 10 tables

Closest papers

Nearest neighbours by meaning across the whole index.

Modelling the Nordic power system expansion with PyPSA-Eur: a comparison with the Nordic Grid Development Perspective 2025

eess.SY ·2026-10-09 ·Leonardo Rydin Gorjão, Heidi S. Nygård
published similarity 0.63
Abstract · Conference proceedings, 4 figures, 6 pages

We compare the Nordic Grid Development Perspective 2025 (NGDP) with a least-cost transition pathway for the Nordic power system obtained with PyPSA-Eur for the period 2025-2050 under a net-zero CO$_2$ constraint. The model co-optimises generation, storage, and transmission expansion with hourly system operation while constraining the Nordic generation mix to remain consistent with NGDP milestone ranges. Overall, the optimised capacity pathways reproduce the broad NGDP expansion of wind and solar power, with Denmark emerging as the main locus of offshore wind and solar deployment, Finland as a major site for onshore wind expansion, and Norway and Sweden relying more strongly on existing hydropower and nuclear capacity. The main discrepancy between the two pathways does not lie in the broad build-out of variable renewables, but in the timing and role of hydrogen. Whereas the NGDP treats hydrogen as an early and steadily increasing component of industrial demand and system development already from 2030, PyPSA-Eur delays substantial hydrogen deployment until 2045-2050, when it becomes cost-effective primarily as a flexibility and seasonal storage option in a strongly variable-renewable-energy-dominated system. This contrast suggests that early hydrogen build-out in the Nordics is not a robust outcome of cost optimisation alone, but depends strongly on assumptions regarding industrial demand growth, sector coupling, and anticipatory infrastructure planning. We therefore argue that hydrogen remains the principal strategic uncertainty in the Nordic transition, with the NGDP representing a more anticipatory planning perspective and PyPSA-Eur a more conservative least-cost timing of deployment.

0.37

Massachusetts' 2026 Clean Peak Standard Recalibration: Adaptation and Storage Tradeoffs

eess.SY ·2026-09-29 ·Yuhan Dai, Boyu Yao
published similarity 0.52
Abstract · Accepted for IEEE GESS 2026

Massachusetts recalibrated its Clean Peak Standard (CPS) in 2026 by lowering the minimum standards and expanding the Near-Term Resource Multiplier for qualifying storage. This paper evaluates the change using a three-zone, hourly capacity expansion model for 2026--2030. Both scenarios achieve full CPS compliance, but the post-May scenario reduces new battery additions by 53.1% and modeled system cost by 3.7%. CPS-eligible discharge declines by 30.4%, while Clean Peak Energy Certificate production declines by only 9.5%. Fossil generation during CPS hours increases by 11.7%, whereas modeled emissions remain nearly unchanged because the Regional Greenhouse Gas Initiative cap binds. The recalibration therefore lowers the modeled storage capacity requirement while weakening physical clean-peak performance.

0.36

Shift or curtail? How much data-center flexibility is worth depends on the host power grid

eess.SY physics.soc-ph ·2026-08-20 ·Saroj Khanal, Geon Roh, Boyu Yao, Abraham Silverman, Dennice Gayme +3 more
similarity 0.52
Abstract · Submitted to Nature Energy

Data-center growth risks overbuilding power grid infrastructure and stranding capital. Flexible data-center operation can defer infrastructure investments, but its value depends on the flexibility mechanism and the host power grid characteristics. We classify data-center load as firm, flexible or interruptible, and embed them in capacity expansion applied to market-organized, fossil-heavy PJM and carbon-capped, centrally coordinated Korea. In PJM, the flexibility value is spatial: shifting workloads between zones reduces system cost by 6% in 2028 and 19% in 2038, avoiding 4.4 GW and 8.9 GW of gas and nuclear generation. In Korea, it is temporal: shifting load into midday solar hours makes 0.5 GW of additional solar worth building in 2028 and avoids 1.2 GW of gas and 0.3 GW of batteries in 2038. In both, realistic event-shape limits diminish the value of curtailment. The results show that flexibility procurement and its value are driven by grid characteristics and policy objectives.

0.46

Robust Joint Planning of EV and eBus Charging Infrastructure with PV Self-Consumption under Demand Uncertainty

eess.SY ·2026-08-19 ·Biswarup Mukherjee
benchmark similarity 0.51
Abstract · This manuscript has been submitted for peer review

This paper presents a mixed-integer linear programming (MILP) framework for joint electric vehicle (EV) and electric bus (eBus) charging-infrastructure planning with photovoltaic (PV) self-consumption. The model co-optimizes charger siting, sizing, technology selection, eBus-to-depot assignment, and hourly charging schedules. A deterministic MILP is first formulated as a nominal benchmark and then extended to a scenario-based robust min--max formulation under vehicle energy-demand uncertainty. The robust model uses shared first-stage infrastructure decisions and scenario-specific operating decisions, and minimizes infrastructure cost plus the worst-case scenario operating cost through an epigraph reformulation. Soft-feasibility penalties quantify unmet charging energy, terminal state-of-charge (SOC) shortfall, and capacity violations under stressed scenarios. A 50-node case study shows that route-segment eBus demand and PV weighting alter charger deployment, technology mix, and grid import, while V2G enables hard-feasible robust operation at sufficiently large penalty weights. These results highlight that effective long-term infrastructure planning must simultaneously account for diverse vehicle fleets, operational strategies that adapt to different scenarios, and node-level constraints on charging capacity.

0.19

Hydrogen in Practice: A Global Review of Demonstration Projects from Production to Integration

eess.SY ·2026-11-14 ·Yiyina Teng, Shahab Dehghan, Xiaoqiang Guo, Shiqi Zhang, Yanming Wan +2 more
published similarity 0.50
Abstract · 49 pages, 15 figures

Hydrogen technology has the potential to address various challenges related to integrating low- and zero-carbon energy sources, as well as achieving carbon neutrality. It provides valuable solutions for transitioning to net-zero emission energy systems on a global scale. The implementation of hydrogen production and integration demonstration projects has received significant attention around the world and strong support from governments, highlighting the crucial role of such initiatives in the advancement of hydrogen energy. However, research in this area remains limited, particularly in terms of comprehensive and systematic reviews of industrial practices under real-world conditions. To bridge this gap, this article provides an in-depth review of hydrogen production, storage, and industrial applications, summarizing key features of thirteen exemplary hydrogen demonstration projects from around the world. The goal is to offer insights and guidance for the large-scale deployment of hydrogen energy while identifying potential technological pathways for the future.

0.37

Green500: Adventure in Qualifying a Cluster

cs.DC ·2026-11-06 ·Nicolas Richart, Xavier Ouvrard, Julia Paolini, Manuel Cubero-Castan, Gilles Fourestey
similarity 0.50
Abstract · submitted to EESP Workshop 2026

Energy effciency has become a key metric for evaluating High Performance Computing (HPC) systems, as reflected by the Green500 ranking. However, energy effciency alone does not capture the full environmental impact of an HPC cluster. Using the Kuma cluster at EPFL, we report on two Green500 measurement campaigns at Level 2 and Level 3, and extend this analysis to a full carbon footprint assessment using the MITSI life-cycle based methodology. GPU power capping experiments show that energy effciency peaks at 450 W, achieving an 11% performance loss offset by a 20% reduction in energy consumption. When embodied emissions are accounted for, the optimal power cap for carbon effciency shifts to 500 W under Switzerland's low-carbon electrical grid, revealing a tension between minimizing usage and embodied contributions. We discuss the challenges of generalizing this approach into a broader carbon-based HPC ranking, and argue that moving beyond energy effciency is both necessary and feasible.

0.20

Autonomous agents for electricity-system planning

cs.AI cs.CL ·2026-11-04 ·Yoon Pyo Lee, Samrendra Roy, Jay Phil Yoo, Kazuma Kobayashi, Souvik Chakraborty +1 more
similarity 0.50
Abstract

Planning electricity systems requires repeated decisions that connect regional resources, investment, operation and network constraints. Here we present an autonomous planning framework that carries prepared regional scenarios through proposal, numerical evaluation, feedback interpretation, redesign and final plan selection. Agents propose investment bounds, storage operating conditions and feeder interventions, interpret numerical feedback, and decide how to revise designs and when to stop. The framework automatically executes annual investment-and-dispatch optimization and representative-feeder verification, applies fixed acceptance criteria and retains the lowest-cost accepted candidate. We evaluate forty carbon-constrained trajectories across ten system-year scenarios in five electricity systems and four countries, using two model deployments and single- and multi-agent architectures. All forty retain candidates satisfying the implemented physical and fixed annual operational carbon-budget checks. Twenty-eight of forty matched reference designs exceed the new scenario ceilings. A separate archive of ninety-six trajectories under a common 1,000 Mt annual ceiling provides matched references and broader regional coverage. The results demonstrate autonomous planning under explicit emissions constraints using public regional data and published institutional demand outlooks.

0.20

Co-Optimized Generation, Transmission, and Storage Expansion: System Value and Optimal Duration of Pumped-Storage Hydropower

eess.SY math.OC ·2026-08-27 ·Rafael Benchimol Klausner, Rafael Kelman
similarity 0.49
Abstract

Expansion planning models usually fix storage duration before optimization, setting how much storage power to build but not for how long it can discharge. We present a generation-transmission-storage expansion framework in which candidates of many durations compete on annualized cost, making the duration mix an optimization outcome. It is a rolling-horizon, two-stage stochastic linear program, each five-year stage is a full year at hourly resolution under ten coherent inflow, wind, and solar scenarios. We apply it to the Brazilian Interconnected System over 2030-2050, where demand roughly doubles to 1,716 TWh/year and variable renewable energy (VRE) supplies most new capacity. Two cases are compared: 36 pumped-storage hydropower (PSH) candidates over four subsystems and nine durations (4-144 h) alongside 4-h battery energy storage systems (BESS), and BESS alone. With PSH available, the model builds 31.2 GW / 755 GWh of PSH and no BESS, dominated by 12-h capacity with 4.9 GW of 72-h units. Without PSH it builds 38 GW / 152 GWh of BESS and 7.8 GW more gas-fired capacity, mostly open-cycle peakers. PSH lowers 2050 annualized system cost by US$ 5.0 billion/year (6.8%), operating cost by 23.5%, thermal generation by 34 TWh/year, and long-run marginal cost by 20%; 2035 VRE curtailment falls from 8.4% to 3.2%. The magnitudes are specific to Brazil, but the underlying mechanism is general: limiting storage candidates to a single duration understates the system's optimal energy-storage requirement and overstates its residual need for thermal capacity.

0.30