CS Paper Radar

Massachusetts' 2026 Clean Peak Standard Recalibration: Adaptation and Storage Tradeoffs

Yuhan Dai, Boyu Yao

eess.SY ·submitted 2026-09-29 01:27 UTC · v1
published

Abstract

Massachusetts recalibrated its Clean Peak Standard (CPS) in 2026 by lowering the minimum standards and expanding the Near-Term Resource Multiplier for qualifying storage. This paper evaluates the change using a three-zone, hourly capacity expansion model for 2026--2030. Both scenarios achieve full CPS compliance, but the post-May scenario reduces new battery additions by 53.1% and modeled system cost by 3.7%. CPS-eligible discharge declines by 30.4%, while Clean Peak Energy Certificate production declines by only 9.5%. Fossil generation during CPS hours increases by 11.7%, whereas modeled emissions remain nearly unchanged because the Regional Greenhouse Gas Initiative cap binds. The recalibration therefore lowers the modeled storage capacity requirement while weakening physical clean-peak performance.

Comment
Accepted for IEEE GESS 2026

Closest papers

Nearest neighbours by meaning across the whole index.

Co-Optimized Generation, Transmission, and Storage Expansion: System Value and Optimal Duration of Pumped-Storage Hydropower

eess.SY math.OC ·2026-08-27 ·Rafael Benchimol Klausner, Rafael Kelman
similarity 0.63
Abstract

Expansion planning models usually fix storage duration before optimization, setting how much storage power to build but not for how long it can discharge. We present a generation-transmission-storage expansion framework in which candidates of many durations compete on annualized cost, making the duration mix an optimization outcome. It is a rolling-horizon, two-stage stochastic linear program, each five-year stage is a full year at hourly resolution under ten coherent inflow, wind, and solar scenarios. We apply it to the Brazilian Interconnected System over 2030-2050, where demand roughly doubles to 1,716 TWh/year and variable renewable energy (VRE) supplies most new capacity. Two cases are compared: 36 pumped-storage hydropower (PSH) candidates over four subsystems and nine durations (4-144 h) alongside 4-h battery energy storage systems (BESS), and BESS alone. With PSH available, the model builds 31.2 GW / 755 GWh of PSH and no BESS, dominated by 12-h capacity with 4.9 GW of 72-h units. Without PSH it builds 38 GW / 152 GWh of BESS and 7.8 GW more gas-fired capacity, mostly open-cycle peakers. PSH lowers 2050 annualized system cost by US$ 5.0 billion/year (6.8%), operating cost by 23.5%, thermal generation by 34 TWh/year, and long-run marginal cost by 20%; 2035 VRE curtailment falls from 8.4% to 3.2%. The magnitudes are specific to Brazil, but the underlying mechanism is general: limiting storage candidates to a single duration understates the system's optimal energy-storage requirement and overstates its residual need for thermal capacity.

0.30

Assessing Modeling Fidelity for Long-Term Battery Energy Storage Planning: Operation, Degradation, and Temporal Representation

eess.SY ·2026-09-30 ·Hassan Zahid Butt, Xingpeng Li
similarity 0.58
Abstract

Long-term battery energy storage system (BESS) planning often relies on simplified degradation, operational, and temporal representations to maintain computational tractability, yet their effects on lifecycle conclusions are not well understood. This paper assesses the modeling fidelity needed for long-term lifecycle evaluation of BESS designs used in planning studies. A 20-year grid-connected microgrid is sized using a degradation-naive planning model, after which the installed portfolio is fixed and evaluated through sequential lifecycle validation. The reference representation combines nonlinear calendar and cycle aging, C-rate-dependent efficiencies, state-of-health-dependent performance, self-discharge, battery replacement, and full 8,760-h chronology. Battery-model hierarchies, targeted ablations, linear degradation surrogates, health-update intervals, temporal reductions, and combined simplifications are compared using lifecycle cost, replacement timing, state of health, and energy adequacy. The reference case produces replacements in years 9 and 18, a $111.25 million lifecycle net present cost, and 24.01 MWh of cumulative energy not served. Omitting calendar aging eliminates both replacements and understates lifecycle cost by 35.1%, whereas a separately calibrated linear surrogate model reproduces both replacement years and limits the cost deviation to 0.2%, although energy not served remains 31.8% below the reference. A peak-informed calibrated 12-day representation preserves replacement timing but reports zero energy not served, while replacing the preserved peak day with the maximum daily-energy-deficit day substantially overstates energy not served because representative-day closure alters the battery state surrounding the critical event. The results show that modeling fidelity is metric-dependent and should be selected according to the lifecycle outcome to be preserved.

0.10

Impact of Wind-Solar-Battery Growth on Electricity Prices: Reserve Scarcity and Transmission Congestion

eess.SY ·2026-11-14 ·Haoxiang Wan, Ivan Castillo, Xingpeng Li
similarity 0.57
Abstract · 7 pages, 3 figures, 2 tables. Submitted to IEEE GECA 2027

This paper asks whether sequential wind, solar, and battery storage additions that eliminate unserved energy also remove modeled reserve scarcity and transmission congestion. Thirty-one cumulative portfolio states are evaluated on a modified IEEE 24-bus system for a constructed stressed day using a 24-hour day-ahead unit commitment model with network constraints, co-optimized energy and upward reserve, chronological battery storage, and an approximation of the Electric Reliability Council of Texas operating reserve demand curve. The thermal baseline has 106 MWh of unserved energy, whereas 450 MW of wind is sufficient to serve all demand. However, with 1,500 MW of wind, the hourly modeled reserve scarcity price still reaches \$5,000/MWh because wind output declines after the system peak. Adding 1,800 MW of solar reduces the load weighted daily average modeled reserve scarcity price from \$1,136.2/MWh to \$101.2/MWh and confines modeled reserve scarcity to three evening hours. Adding 250 MW/1,000 MWh of battery storage further lowers the average to \$4.3/MWh and reduces wind curtailment from 631 MWh to 306 MWh. Transmission congestion nevertheless remains: all residual wind curtailment occurs at bus 21, wind capture prices at buses 21 and 23 differ by \$31.8/MWh, and identical battery storage plants yield normalized net energy market revenues of \$201/(MW$\cdot$day) and \$121/(MW$\cdot$day) at buses 19 and 21, respectively. These results show that unserved energy, modeled reserve scarcity, and locational congestion effects measure distinct operating conditions and should be evaluated separately but interpreted together.

0.27

State-of-Charge Targets for Storage Participation in Two-Settlement Markets: Reliability, Price, and Compensation Impacts

eess.SY ·2026-11-13 ·Yichen Li, Alexandre Moreira, Ruiwei Jiang, Miguel Heleno, Julie Mulvaney-Kemp
hot direction similarity 0.56
Abstract

As energy storage assumes a larger role in electricity systems, market operation must coordinate its use across time to support reliability during periods of system stress. Minimum state-of-charge (SOC) targets provide a means of preserving energy for these periods, but their design shapes reliability, operating efficiency, and storage compensation. This paper evaluates alternative SOC target designs in a California-based day-ahead and real-time electricity market model. The comparison examines targets based on day-ahead schedules or rolling centralized dispatch, enforced at the individual-resource or system level, across seasons, stress conditions, and participant information settings. The results show that retaining more energy does not necessarily reduce load shedding: targets that restrict discharge can limit storage support during shortages. Under critical summer conditions, individual targets derived from rolling centralized dispatch reduce weekly load shedding by approximately 83--84\% relative to operation without targets. Lower RT clearing costs and average prices can coexist with higher storage compensation, reflecting the role of day-ahead positions and real-time deviations in determining settlement outcomes. These findings highlight the importance of coordinating energy retention with timely discharge and network deliverability when designing SOC requirements for storage participation in electricity markets.

0.20

Reassessing Clean Power 2030 Pathway Using Real Time Records

eess.SY ·2026-10-19 ·Anthony D Stephens, David R Walwyn
similarity 0.56
Abstract · 18 pages, 8 tables, 5 figures

The National Energy System Operator (NESO) Clean Power 2030 advice to the government, accepted as United Kingdom (UK) government policy in December 2024, outlines a rapid increase in wind and solar generation capacities with the associated infrastructure by 2030, with the objective of reducing carbon dioxide emissions from the UK electricity system to 5.2 million tons per annum. Our previous paper used real-time records from 2017 to analyze Clean Power 2030 proposal. This paper extends the previous assessment, using real time records of 2017, 2018 and 2019 to test the resilience of the UK energy system under more diverse weather patterns. Two different modelling methods predict that the 2030 carbon dioxide emissions will be five times greater than Clean Power 2030 prediction. Furthermore, the projections show that, due to increased curtailment, only about half of NESO proposed increases in wind and solar capacities will be economically justified. NESO also advised the government that 35GW of unabated gas-fired generation would maintain security of supply, whereas our models suggest that at least 42 GW will be required during winter wind lulls. Recent events, such as grid stability problems in 2026, also discussed in the paper, validate our estimated and suggest the risk of blackouts in the UK is increasing.

0.27

Capacity Credit of Data-Centre Flexibility: The Role of Workload Scheduling and Usable Battery Energy

eess.SY ·2026-11-17 ·Pengyu Ren, Wei Sun, Jiakai Wu, Yifan Wang
similarity 0.56
Abstract

Data centres that offer the same reduction in grid demand can make different contributions to supply adequacy. We estimate the effective load-carrying capability of workload scheduling and on-site batteries by matching expected unserved energy across paired simulations. Longer task deadlines increase capacity credit by giving operators more choice over when to defer and recover work. A fixed evening commitment shifts more work than deadline-based scheduling but delivers a smaller reduction in expected unserved energy. Protected backup reserves leave uninterruptible power supplies with limited capacity credit, while longer discharge durations raise the credit of dedicated batteries at the same response rating. These findings suggest assessing recovery deadlines and dispatchable energy alongside offered demand reductions.

0.20

Relining or Replacement: How Timing, Costs, and Infrastructure Shape U.S. Primary Steel Decarbonization

eess.SY ·2026-10-10 ·Mohamed Atouife, Yuezhang He, Jesse D. Jenkins
similarity 0.55
Abstract

Imminent blast furnace relinings create a consequential investment window for U.S. primary steel decarbonization. Using plant-level capacity planning and stochastic operations modeling, we quantify the costs, infrastructure, and fiscal requirements to transition legacy blast furnace sites to direct reduction under supply-side incentives. Under baseline assumptions, post-subsidy premiums above average blast furnace costs, including relining, are 272 to 427 dollars per ton of steel for near-zero-emission hydrogen-based direct reduction and 115 to 181 dollars for natural-gas-based production. Representative facilities producing two million tons of steel annually at legacy locations require approximately 4 to 6.5 and 0.7 to 1.1 GW of renewable generation and battery storage, respectively. This translates to 65 and 12 GW across the unrelined fleet for hydrogen- and natural gas-based pathways, respectively. These findings connect replacement timing to costs, infrastructure, and public support, motivating a sequenced transition through clean-powered natural-gas-based direct reduction to avert blast furnace relining, reduce emissions by 57 percent relative to blast furnaces, and preserve options for deeper decarbonization through hydrogen substitution or carbon capture.

0.25

Green500: Adventure in Qualifying a Cluster

cs.DC ·2026-11-06 ·Nicolas Richart, Xavier Ouvrard, Julia Paolini, Manuel Cubero-Castan, Gilles Fourestey
similarity 0.54
Abstract · submitted to EESP Workshop 2026

Energy effciency has become a key metric for evaluating High Performance Computing (HPC) systems, as reflected by the Green500 ranking. However, energy effciency alone does not capture the full environmental impact of an HPC cluster. Using the Kuma cluster at EPFL, we report on two Green500 measurement campaigns at Level 2 and Level 3, and extend this analysis to a full carbon footprint assessment using the MITSI life-cycle based methodology. GPU power capping experiments show that energy effciency peaks at 450 W, achieving an 11% performance loss offset by a 20% reduction in energy consumption. When embodied emissions are accounted for, the optimal power cap for carbon effciency shifts to 500 W under Switzerland's low-carbon electrical grid, revealing a tension between minimizing usage and embodied contributions. We discuss the challenges of generalizing this approach into a broader carbon-based HPC ranking, and argue that moving beyond energy effciency is both necessary and feasible.

0.20