Multi-Timescale Deliverability of Shared Hybrid Storage for AI Data Center Campuses

Zihan Meng, Ruizhang Yang, Chenxi Hu, Francis Yunhe Hou

eess.SY ·submitted 2026-10-30 04:48 UTC · v1

Abstract

Artificial intelligence data center (AIDC) campuses contain sustained power variations and subsecond power fluctuations, requiring both sufficient stored energy and fast response. A shared hybrid energy storage system (HESS) can mitigate aggregate AIDC power deviations, but interval-based schedules cannot capture the delay between commanded and delivered power at the campus point of common coupling (PCC). To this end, this paper proposes a multi-timescale scheduling model for mitigating AIDC power fluctuations with the shared HESS. First, it models electrical pooling at the campus bus and constrains the shared HESS to a single PCC injection. Second, a two-layer model passes five-minute scheduled power, energy state, and reserve capacity to a causal fast response model that distinguishes commanded power from delivered power. Case studies using the National Laboratory of the Rockies (NLR) GenAI Power Profiles Dataset show reductions in both PCC and fast integral absolute error (IAE), while retaining most of the improvement available under ideal response.

Closest papers

Nearest neighbours by meaning across the whole index.

AI Data Centers Meet Electrical Grids: A Review of Power Challenges and Coordinated Solutions

eess.SY ·2026-10-06 ·Mariam Mughees, Yuzhuo Li, Yize Chen, Yunwei Ryan Li
survey similarity 0.71
Abstract

Artificial intelligence (AI) workloads are creating large, power-electronic loads whose effects on power systems depend on location, temporal variability, controllability, and interactions with other loads and resources. Annual electricity consumption alone cannot capture these effects. This review examines how AI data centers affect power systems stability, renewable-energy integration, and low-carbon planning by tracing the power-delivery chain from accelerators and workloads through rack converters, uninterruptible power supplies (UPS), storage, and microgrids to the transmission point of interconnection. Reported oscillatory events and multi-gigawatt load transfers highlight how facility responses can amplify disturbances, while programmable workloads and controllable power converters offer opportunities for demand flexibility. Challenges and mitigation strategies are organized across device, rack, facility, and power systems levels, spanning millisecond-to-year timescales. A bandwidth-matching framework relates disturbances to the response capabilities of mitigation resources. The review distinguishes computational energy efficiency from power systems and sustainability outcomes: lower energy consumption per token does not necessarily reduce peak demand, electrical disturbances, or carbon emissions. It examines how coordinated workload scheduling, grid-interactive UPS systems, storage, high-voltage DC distribution, and flexible interconnection can support reliability, efficiency, and decarbonization. Key research needs include dynamic load models, high-bandwidth telemetry, carbon-and grid-aware scheduling, and mechanisms for valuing flexible computational demand.

0.08

Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal Shifting

eess.SY ·2026-09-29 ·Suntao Su, Liang Du, Shengyi Wang
similarity 0.68
Abstract · 5 pages, 5 figures, conference

The rapid growth of artificial intelligence (AI) data centers has introduced new challenges to power system operation. As their power demand becomes larger and more variable, quantitatively characterizing their demand flexibility is increasingly important for effective power system coordination. However, heterogeneous workload characteristics and resource requirements make this flexibility difficult to characterize directly. This paper proposes a framework for assessing the grid-compatible demand flexibility of AI data centers via batch workload temporal shifting. An averaging-based resource usage processing method is developed to map fine-resolution CPU, GPU and memory usage into unified time intervals compatible with power system operation. A workload temporal scheduling model is then formulated to shift batch workloads while preserving execution continuity, delay constraints, and server resource capacities, and is coupled with a utilization-dependent server power model to translate workload scheduling decisions into server power demand. Two complementary flexibility metrics are evaluated: short-term peak demand shaving and the maximum duration of sustained power reduction. Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.

0.13

Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation

eess.SY math.OC ·2026-11-06 ·Wei Wang, Himanshu Sharma, Thiagarajan Ramachandran
similarity 0.68
Abstract

Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load fluctuations through reserved active power with zero net state-of-charge change, and (iii) voltage support via reactive power capability at the point of common coupling. Minute-level operational scheduling enforces state-of-charge feasibility and load ramp constraints, and incorporates a controllable queue of delay-insensitive computing tasks to enhance flexibility. A case study using a real data center load profile demonstrates the proposed method and quantifies the BESS power-energy requirements and operational trade-offs needed to satisfy the multi-service constraints, providing practical guidance for interconnection planning and deployment.

0.05

Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility

eess.SY ·2026-10-04 ·Rida Fatima, Xingpeng Li
similarity 0.67
Abstract

The rapid growth of AI data centers is creating concentrated electricity demands that can exceed available distribution network headroom and delay interconnection. This paper investigates whether capacity can be used effectively by coordinating flexibility on both sides of the interconnection. A day-ahead mixed integer second order cone programming framework maximizes feasible AI data center IT capacity using utility side conservation voltage reduction and network topology reconfiguration, together with data center workload shifting and reserve constrained uninterruptible power supply storage. Background feeder demand uses voltage dependent ZIP models, while the data center is modeled as constant power demand using Training, Inference, and Mixed workload profiles. A two-stage solution first maximizes interconnection capacity and then minimizes feeder losses for the retained capacity, with numerical relaxation screening. Studies on a 116-bus model derived from the IEEE 123-node feeder show that, at the constrained bus-60 connection point, grid side flexibility, driven almost entirely by network reconfiguration, increases feasible IT capacity by approximately 42.5-45.0%, while data center flexibility alone provides approximately 2.1-5.4% gains. Coordinated operation increases feasible IT capacity from approximately 10.5-10.6 MW under BASE operation to 15.3-16.0 MW, corresponding to gains of approximately 45.9-50.8%; the 16.0 MW Inference result is limited by the adopted UPS reserve requirement. Benefits are strongly location dependent and influenced by workload flexibility, deferral duration, PUE, UPS energy and reserve requirements, and feeder loading. Under a combined adverse operating condition, FULL capacity decreases by only 3.4% relative to the nominal Mixed case while retaining substantial additional capacity over BASE.

0.08

A Theory of Probabilistic Power Provisioning for Data Centers with Distributed Energy Storage

cs.IT cs.DCcs.PFeess.SY ·2026-08-13 ·Can Emre Koksal, Richard A. Barry, Artun Sel
similarity 0.66
Abstract · 26 pages, 7 figures, 5 tables

The growing power demands and variability of AI workloads make electrical power delivery a critical constraint in data-center operation. Distributed energy storage can reduce the power capacity required to support stochastic loads, but its benefits depend fundamentally on the statistics and time scales of demand. This paper develops a probabilistic framework that jointly characterizes provisioned power, energy-storage capacity, and the probability of overdraw. We show that storage-assisted provisioning separates into two operating regimes. In the Small Battery Region, overdraw is dominated by short-lived demand excursions and storage provides nearly linear reductions in the required power margin. In the Large Battery Region, overdraw results from sustained demand fluctuations over longer spans of time, and the required margin exhibits diminishing returns with storage. For this regime we introduce effective power, an analogue of effective bandwidth that captures the temporal statistics of the demand and gives an asymptotically tight characterization of the required power. We further quantify how temporal correlation and spatial aggregation affect storage requirements and statistical multiplexing gains, and extend the analysis to loads with multiple demand time scales. Finally, we evaluate the framework using power-demand traces from three production data centers spanning HPC, GPU-training, and cloud-service workloads. Despite their heterogeneous, cyclo-stationary and multi-modal behavior, the measured workloads exhibit the predicted regimes, and a simple four-parameter two-state model captures the dynamics governing their storage-power tradeoffs. The resulting framework provides both a probabilistic foundation and practical dimensioning principles for storage-assisted power provisioning in next-generation AI data centers.

0.38

Communication Delay Robust Control of BESS for AI Training Load Smoothing

eess.SY ·2026-09-18 ·Xue Lyu, Wei Du, Sheik Mohammad Mohiuddin, Brett A. Ross
hot direction similarity 0.66
Abstract · 10 pages, 17 figures

AI training loads can exhibit rapid power fluctuations because their power demand differs significantly between computational and communication phases, creating challenging ramp rates at the data center point of common coupling (PCC). Integrating battery energy storage systems (BESS) in data centers is a promising mitigation option. This paper proposes a hybrid BESS control strategy that combines droop-based grid-forming (GFM) control with instantaneous load current-based compensation to suppress high frequency load fluctuations. The GFM control loop regulates the long-term power exchange of the BESS, while the load-following control provides fast compensation for short-term AI workload fluctuations. Communication delay between the load current measurements and the BESS controller is explicitly modeled, and its impact on smoothing performance is analyzed. To mitigate delay-induced degradation, a predictor-based compensation method is incorporated into the BESS control structure. High-fidelity electromagnetic transient simulations are conducted to validate the proposed approach. Results demonstrate effective smoothing of AI training load fluctuations across different grid strength conditions and under time varying communication delays.

0.28

Grid-Mode-Aware AI Data Center Power Smoothing via Bayesian-Optimized Hybrid Energy Storage System

eess.SY ·2026-11-02 ·Sina Mohammadi, Quang Manh Hoang, Marcus Chen I Wada, Van-Hai Bui, Wencong Su
similarity 0.64
Abstract · 6 pages, 5 figures, Submitted, 2027 IEEE Texas Power and Energy Conference (TPEC)

AI data centers exhibit highly stochastic, volatile power demands from intensive workloads and synchronized GPU training cycles, which can excite grid natural frequencies and threaten system stability. This paper proposes a real-time, forecasting-independent control framework utilizing a Hybrid Energy Storage System (HESS) that coordinates a Battery Energy Storage System (BESS) and a supercapacitor (SC). Employing a parameterized frequency-decoupling and active modal-damping policy, the framework mitigates critical oscillatory load components while smoothing overall power fluctuations. To bypass the heavy computational burden of online receding-horizon optimization, this work introduces an offline Bayesian Optimization (BO) approach to optimally tune real-time control parameters, minimizing a multi-objective cost function that balances grid compliance penalties and storage degradation. Numerical simulations demonstrate that the proposed method ensures grid stability and strong target envelope adherence. Specifically, it reshapes extreme 75-160 MW raw demand fluctuations to largely fit within a tight 10 MW target band, with only brief transient excursions, while attenuating the critical 20 MW oscillatory component below 1 MW to suppress resonant excitation.

0.20

Minimizing Grid Interconnection Capacity Requirements for AI Data Centers: A Developer-Side Planning Framework with Onsite Resources and Workload Flexibility

eess.SY ·2026-08-29 ·Hassan Zahid Butt, Rida Fatima, Xingpeng Li
similarity 0.63
Abstract

Securing grid interconnection capacity has become a bottleneck for AI data center projects and can take longer than constructing the facilities themselves. This mismatch can delay deployment for years, making early interconnection planning essential. This paper develops ICP-AI, an interconnection capacity planning framework from a data center developer's perspective. The framework minimizes grid import capacity under a prescribed onsite investment budget while jointly sizing photovoltaic (PV) and battery energy storage system (BESS) resources and scheduling deadline constrained workload flexibility. A secondary refinement fixes the minimum grid capacity and selects the minimum-investment PV-BESS portfolio among solutions that achieve that capacity. The framework is evaluated using monthly composite stress profiles across varying temporal assumptions, load shapes, flexible load fractions, and deferral windows. Results show that interconnection capacity reduction depends strongly on the planning environment: at a $100M budget, it is about 6% for the high load factor baseline, exceeds 10% under monthly average solar availability, and reaches 13.3% for a more diurnal load. At a $10M budget, 5% flexible load with a 1 h workload deferral window reduces BESS capacity from 15.30 to 4.87 MWh while increasing capacity reduction from 4.43% to 4.84%. To test sensitivity to temporal compression, the model is also solved over the full 8,760 h chronology, which preserves the main capacity and flexibility trends. Overall, ICP-AI quantifies the interconnection capacity and infrastructure substitution value of workload flexibility, providing an investment-interconnection frontier to support capital allocation and early project planning in constrained grid environments.

0.12