AI training loads can exhibit rapid power fluctuations because their power demand differs significantly between computational and communication phases, creating challenging ramp rates at the data center point of common coupling (PCC). Integrating battery energy storage systems (BESS) in data centers is a promising mitigation option. This paper proposes a hybrid BESS control strategy that combines droop-based grid-forming (GFM) control with instantaneous load current-based compensation to suppress high frequency load fluctuations. The GFM control loop regulates the long-term power exchange of the BESS, while the load-following control provides fast compensation for short-term AI workload fluctuations. Communication delay between the load current measurements and the BESS controller is explicitly modeled, and its impact on smoothing performance is analyzed. To mitigate delay-induced degradation, a predictor-based compensation method is incorporated into the BESS control structure. High-fidelity electromagnetic transient simulations are conducted to validate the proposed approach. Results demonstrate effective smoothing of AI training load fluctuations across different grid strength conditions and under time varying communication delays.

Comment
10 pages, 17 figures

Closest papers

Nearest neighbours by meaning across the whole index.

Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation

eess.SY math.OC ·2026-11-06 ·Wei Wang, Himanshu Sharma, Thiagarajan Ramachandran
similarity 0.76
Abstract

Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load fluctuations through reserved active power with zero net state-of-charge change, and (iii) voltage support via reactive power capability at the point of common coupling. Minute-level operational scheduling enforces state-of-charge feasibility and load ramp constraints, and incorporates a controllable queue of delay-insensitive computing tasks to enhance flexibility. A case study using a real data center load profile demonstrates the proposed method and quantifies the BESS power-energy requirements and operational trade-offs needed to satisfy the multi-service constraints, providing practical guidance for interconnection planning and deployment.

0.05

Grid-Mode-Aware Model Predictive Control of Hybrid Energy Storage Systems for AI Data Center Power Smoothing

eess.SY ·2026-09-03 ·Xin Chen
similarity 0.74
Abstract

To facilitate the grid-friendly integration of highly variable AI data center loads, this paper proposes a grid-mode-aware model predictive control (G-MPC) framework for managing a hybrid energy storage system (HESS) to smooth grid-side power demand. The framework optimally coordinates a battery energy storage system (BESS) and a supercapacitor (SC) by solving a multi-step optimization problem in a receding-horizon manner. In particular, band-pass filter dynamics are directly embedded in the G-MPC formulation to extract and suppress grid-side power components associated with vulnerable grid oscillatory modes, thus mitigating load-induced grid oscillations. The resulting G-MPC optimization jointly minimizes violations of grid-side power-envelope, ramp-rate, and modal-power requirements and the degradation and power-ramping costs of the BESS and SC, while satisfying power limits, state-of-charge limits, and other operational constraints. To enable real-time implementation, a fix-and-re-optimize algorithm is developed to solve each G-MPC problem efficiently while preventing simultaneous charging and discharging. Extensive simulations demonstrate the effectiveness, flexibility, and computational efficiency of the proposed framework. The results also highlight the importance of explicitly suppressing power components associated with vulnerable grid modes, rather than merely reducing overall load variations, to effectively mitigate grid oscillations.

0.40

Grid-Mode-Aware AI Data Center Power Smoothing via Bayesian-Optimized Hybrid Energy Storage System

eess.SY ·2026-11-02 ·Sina Mohammadi, Quang Manh Hoang, Marcus Chen I Wada, Van-Hai Bui, Wencong Su
similarity 0.70
Abstract · 6 pages, 5 figures, Submitted, 2027 IEEE Texas Power and Energy Conference (TPEC)

AI data centers exhibit highly stochastic, volatile power demands from intensive workloads and synchronized GPU training cycles, which can excite grid natural frequencies and threaten system stability. This paper proposes a real-time, forecasting-independent control framework utilizing a Hybrid Energy Storage System (HESS) that coordinates a Battery Energy Storage System (BESS) and a supercapacitor (SC). Employing a parameterized frequency-decoupling and active modal-damping policy, the framework mitigates critical oscillatory load components while smoothing overall power fluctuations. To bypass the heavy computational burden of online receding-horizon optimization, this work introduces an offline Bayesian Optimization (BO) approach to optimally tune real-time control parameters, minimizing a multi-objective cost function that balances grid compliance penalties and storage degradation. Numerical simulations demonstrate that the proposed method ensures grid stability and strong target envelope adherence. Specifically, it reshapes extreme 75-160 MW raw demand fluctuations to largely fit within a tight 10 MW target band, with only brief transient excursions, while attenuating the critical 20 MW oscillatory component below 1 MW to suppress resonant excitation.

0.20

Mitigating the Grid Impact of Gigawatt-Scale AI Data Centers via High-Fidelity Model Flexibility

eess.SY math.OC ·2026-11-18 ·Eihab E. E. Ahmed, Saeed Manshadi
hot direction similarity 0.69
Abstract

Gigawatt-scale artificial intelligence data centers (AIDCs) are being connected at a single point of interconnection (POI) faster than transmission can be reinforced, yet studies of their flexibility rely on DC power flow and simplified load envelopes that omit voltage, cooling dynamics, and workload deadlines. This paper addresses this gap by embedding a high-fidelity AIDC model, with separate inference and training pools, hall thermal mass, PV, a battery energy storage system (BESS) with reactive capability, and a STATCOM, in a five-minute multi-period AC optimal power flow. Simulations on the RTS-GMLC test system show that active-power flexibility mitigates local price spikes and relieves congestion, whereas reactive support from the BESS inverter or a STATCOM is needed to keep the POI voltage away from sagging around its 0.95~pu limit. Sensitivity analyses show that cost-driven charging of large batteries can induce new morning congestion and that storage largely substitutes for wider workload deferral.

0.30

Grid-Forming AI Data Centers: Coordinated Grid Support Control from IT Loads and Energy Storage

eess.SY ·2026-11-13 ·Xuechun Zhang, Zhiyi Zhao, Fei Teng, Zhen Wang
hot direction similarity 0.69
Abstract

To exploit the grid-support capability of AI data centers (AIDCs), this paper proposes a grid-forming (GFM) control scheme which coordinates the IT loads and energy storage (ES) in the AIDC. First, the framework of a grid-connected AIDC is presented, with the multi-stage power conversion from the grid to the IT loads presented. A dual GFM scheme is then proposed for the back-to-back converters to provide grid support through coordinated power adjustments from IT loads and ES. In addition, an aggregated power response model is established to characterize the IT-load flexibility considering multiple IT servers executing diverse tasks. Time-domain simulations of a 100 MW grid-connected AIDC demonstrate that the proposed control scheme can effectively support the grid.

0.25

Low-Voltage Ride-Through in AI Data Centers via Coordinated Battery and Computing Load Control

eess.SY ·2026-11-14 ·Xiaoyang Wang, Xin Chen, Fang Chen Lin, Prasad Enjeti, Ali Yazdanpanah +2 more
hot direction similarity 0.67
Abstract · 5 pages, 7 figures

The ability of large AI data centers to ride through grid voltage sags is critical to power system stability and reliability. This paper frames data center low-voltage ride-through (LVRT) as a DC-link power balance problem. Once the rectifier reaches its current limit, the power drawn from the grid decreases in proportion to the grid voltage. The DC-link capacitor can supply the resulting power deficit only briefly before the DC-link voltage falls low enough to trigger undervoltage protection tripping. To address this issue, this paper proposes effective control strategies for coordinating uninterruptible power supply (UPS) battery and computing load curtailment to offset the power deficit and enable LVRT at minimum control cost. Three control scenarios are studied: UPS battery support alone, computing load curtailment alone, and the coordinated use of both resources. Electromagnetic transient (EMT) simulations using the TAMU-ERCOT AI data center model demonstrate that battery support and the coordinated strategy achieve LVRT for all tested sags, including a near-zero-voltage fault, while load curtailment alone rides through moderate voltage sags.

0.22

Multi-Timescale Deliverability of Shared Hybrid Storage for AI Data Center Campuses

eess.SY ·2026-10-30 ·Zihan Meng, Ruizhang Yang, Chenxi Hu, Francis Yunhe Hou
similarity 0.66
Abstract

Artificial intelligence data center (AIDC) campuses contain sustained power variations and subsecond power fluctuations, requiring both sufficient stored energy and fast response. A shared hybrid energy storage system (HESS) can mitigate aggregate AIDC power deviations, but interval-based schedules cannot capture the delay between commanded and delivered power at the campus point of common coupling (PCC). To this end, this paper proposes a multi-timescale scheduling model for mitigating AIDC power fluctuations with the shared HESS. First, it models electrical pooling at the campus bus and constrains the shared HESS to a single PCC injection. Second, a two-layer model passes five-minute scheduled power, energy state, and reserve capacity to a causal fast response model that distinguishes commanded power from delivered power. Case studies using the National Laboratory of the Rockies (NLR) GenAI Power Profiles Dataset show reductions in both PCC and fast integral absolute error (IAE), while retaining most of the improvement available under ideal response.

0.12

AI Data Centers Meet Electrical Grids: A Review of Power Challenges and Coordinated Solutions

eess.SY ·2026-10-06 ·Mariam Mughees, Yuzhuo Li, Yize Chen, Yunwei Ryan Li
survey similarity 0.66
Abstract

Artificial intelligence (AI) workloads are creating large, power-electronic loads whose effects on power systems depend on location, temporal variability, controllability, and interactions with other loads and resources. Annual electricity consumption alone cannot capture these effects. This review examines how AI data centers affect power systems stability, renewable-energy integration, and low-carbon planning by tracing the power-delivery chain from accelerators and workloads through rack converters, uninterruptible power supplies (UPS), storage, and microgrids to the transmission point of interconnection. Reported oscillatory events and multi-gigawatt load transfers highlight how facility responses can amplify disturbances, while programmable workloads and controllable power converters offer opportunities for demand flexibility. Challenges and mitigation strategies are organized across device, rack, facility, and power systems levels, spanning millisecond-to-year timescales. A bandwidth-matching framework relates disturbances to the response capabilities of mitigation resources. The review distinguishes computational energy efficiency from power systems and sustainability outcomes: lower energy consumption per token does not necessarily reduce peak demand, electrical disturbances, or carbon emissions. It examines how coordinated workload scheduling, grid-interactive UPS systems, storage, high-voltage DC distribution, and flexible interconnection can support reliability, efficiency, and decarbonization. Key research needs include dynamic load models, high-bandwidth telemetry, carbon-and grid-aware scheduling, and mechanisms for valuing flexible computational demand.

0.08