The Power of Migration on Identical Machines is Two

Nicole Megow, Bart Zondervan

cs.DS cs.DM ·submitted 2026-11-09 08:14 UTC · v1

Abstract

We study the power of migration in preemptive scheduling on identical parallel machines with time windows. If an instance admits a migratory schedule on $m$ machines, how many machines are needed to schedule it without migration? Kalyanasundaram and Pruhs (2001) showed that $6m-5$ machines suffice and gave a polynomial-time construction using $12m-5$ machines, whereas $2m-1$ machines may be necessary. We close this gap, which has been open for more than 25 years: $2m-1$ machines always suffice, and a corresponding non-migratory schedule can be computed in strongly polynomial time. Our proof has two main technical ingredients. First, we introduce supercanonical schedules and prove that the conflict graph of every such schedule on $m$ machines is $(2m-1)$-colorable. The key property is that whenever a job pauses, the jobs running alongside it just before and just after the pause separate the jobs processed entirely during the pause from the rest of the conflict graph. We use these separators and Kempe exchanges to compute a coloring in polynomial time. Second, we construct a supercanonical schedule with polynomially many processing blocks by shrinking job windows as far as possible while preserving feasibility and solving a min-cost flow problem.

Closest papers

Nearest neighbours by meaning across the whole index.

Scheduling with Mandatory Breaks: NP-Hardness and an Additive-One Approximation

cs.DS ·2026-09-28 ·Shreyas Ghildiyal, Muralidhara V N
similarity 0.72
Abstract

In classical fixed-interval scheduling, each job of a given set must be processed during a prescribed time interval. The goal is to assign each job to exactly one machine such that no two jobs assigned to the same machine overlap in their interiors, and the number of machines used is minimized. Without further constraints this is interval graph coloring and is solvable in polynomial time through greedy approaches. We study a variant in which every used machine must remain idle during a contiguous \emph{break} of prescribed length $x$ somewhere in the scheduling horizon. We show that this additional constraint makes the problem hard, except when $x\le1$. First, for every fixed $x\ge2$, deciding whether $k$ machines suffice for the assignment of a given set of jobs is NP-complete, even when all coordinates are bounded linearly in the number of jobs, so machine minimization is strongly NP-hard. Second, for $x=1$, we give a polynomial-time algorithm that solves the problem exactly. Finally, we give a deterministic polynomial-time algorithm that, on every feasible instance, outputs a schedule using at most $\OPT+1$ machines, where $\OPT$ is the true minimum. Unless $\mathrm{P}=\mathrm{NP}$, no polynomial-time algorithm guarantees $\OPT$ machines for any fixed $x\ge2$, so the additive guarantee of one is best possible.

0.07

Coordinating Boundaries: Improved Approximation Algorithms for Unweighted Non-Preemptive Throughput Maximization

cs.DS ·2026-10-26 ·Weitian Tong, Yao Xu
similarity 0.63
Abstract · 34 pages, 8 figures

We study unweighted nonpreemptive throughput maximization: given jobs with processing times, release times, and deadlines, schedule a maximum-cardinality subset on identical machines. For every fixed $\varepsilon>0$, we give randomized algorithms with expected approximation ratios $17/13+\varepsilon$ in polynomial time and $21/17+\varepsilon$ in pseudopolynomial time. These improve the respective $4/3+\varepsilon$ and $5/4+\varepsilon$ guarantees of Armbruster, Grandoni, Tinguely, and Wiese [STOC'26]. Both results hold for an arbitrary number of identical machines. Our algorithms build on their configuration-LP and matching framework, which partitions time into blocks. For a job whose window meets multiple blocks, its boundary blocks are the first and last such blocks. Crossing boundary pairs, whose endpoints strictly interleave, permit additional assignments to sampled execution slots, while a noncrossing family can be coordinated using consistent joint distributions on at most three blocks. The exchange analysis accounts for fractional job assignments that must be erased before inserting an additional job. For the pseudopolynomial implementation, we project configurations onto selected job identities and use separate configuration distributions with common placement marginals. This retains efficient pricing while enforcing the correlations needed for coordination.

0.15

Strong NP-Hardness and Approximation Algorithm for Weighted Tardiness with Release Dates and Identical Processing Times

cs.CC cs.DMmath.CO ·2026-09-23 ·Zhi-Long Chen, Nicholas G. Hall
theory similarity 0.62
Abstract · 38 pages, 2 figures, 5 tables

We study nonpreemptive scheduling on a single machine with release dates, due dates, positive job weights, and a common processing time. The objective is to minimize total weighted tardiness. Although closely related equal-processing-time problems admit polynomial-time algorithms, the complexity of this problem has remained open in the literature since 2010. We prove that its decision version is strongly NP-complete, even when every job can meet its due date if processed immediately upon release. The reduction is from unweighted MAX-CUT and uses a quadratic number of jobs with polynomially bounded numerical data. Its main ingredient is a constructive normalization theorem that converts every sufficiently inexpensive feasible schedule into a binary choice for each graph vertex; after normalization, total weighted tardiness equals a constant minus a scaled cut value. We also give a deterministic polynomial-time phase-grid assignment algorithm for the shifted objective $Φ=F+p\sum_jw_j$, where $F$ is total weighted tardiness. The algorithm enumerates at most $N$ release-date residues modulo $p$, solves one minimum-cost assignment problem for each residue, and returns the best phase-grid schedule. It runs in $O(N^5)$ arithmetic operations and achieves the tight ratio $3/2-1/(2N)$ for this algorithm. Because the added term $p\sum_jw_j$ is independent of how the jobs are scheduled, the shifted and original objectives have exactly the same optimal schedules. However, the approximation guarantee applies to the shifted objective; for the original objective, the analysis provides an additive bound. Thus, the paper both resolves the long-standing complexity question and provides a complementary worst-case guarantee for the phase-grid assignment algorithm.

0.21

Faster Exponential Algorithms for Multi-Machine Scheduling Problems

cs.DS ·2026-08-12 ·Anubhav Dhar, Anita Dürr, Ahmed Ghazy, Jakob Greilhuber, Karol Węgrzycki
published similarity 0.61
Abstract

Minimizing the weighted completion times ($P \mid \mid Σw_j C_j$) and weighted number of tardy jobs ($P \mid \mid Σw_j U_j$) on multiple identical machines are two classical NP-hard scheduling problems. As shown by Lenté et al. (2014), both problems can be solved in time ${O}^{\star}(3^n)$. In this paper, we improve these bounds to ${O}(2.755^n)$ and ${O}^{\star}(2^n)$, respectively. Our algorithm for $P \mid \mid Σw_j C_j$ exploits the meet-in-the-middle paradigm and an efficient data structure answering linear programming queries. Additionally, when the number of machines is at most $6$, we show that the running time for $P \mid \mid Σw_j C_j$ can further be improved. Both scheduling problems are generalizations of the classical Bin Packing problem, which can be solved in ${O}^{\star}(2^n)$ time. Improving this running time is an important open question. We show that, when assuming the Asymptotic Rank Conjecture (ARC), Bin Packing can be solved in time ${O}((2-\varepsilon)^n)$ for some $\varepsilon >0$. Our algorithm makes use of two main ingredients: the recent ${O}((2-\varepsilon)^n)$-time algorithm of Nederlof et al. [SICOMP'23] for Bin Packing when the number of bins is a fixed constant, and the ${O}((2-\varepsilon)^n)$-time algorithm of Björklund et al. [SODA'25] for special instances of the $3$-way Partitioning problem when assuming ARC.

0.50

Structural Complexity of Matching-Match: Dense and Sparse Graphs

cs.DS ·2026-09-22 ·Ilie Dumitru, Adrian Miclăuş, Alexandru Popa
theory similarity 0.61
Abstract

The Matching-Match puzzle asks whether the vertices of a fixed graph can be colored so that the multiset of color pairs induced by its edges is exactly a prescribed multiset. We study how the complexity of this realization problem depends on the host graph. On the dense side, we give a polynomial-time algorithm for complete $k$-partite graphs for every fixed number $k$ of parts, with arbitrary precoloring and an arbitrary number of colors. We prove a sharp complement-degree threshold: the problem is polynomial-time solvable when $Δ(\overline G)\le1$, but NP-complete on completely uncolored graphs already when $Δ(\overline G)=2$. This yields a dichotomy for uniform complete multipartite graphs, and connected diameter two already suffices for NP-completeness. We also prove W[1]-hardness on cographs parameterized by the number of colors. On the sparse side, completely uncolored paths and cycles admit a linear-time characterization by Euler trails and circuits, while counting feasible colorings is $\#P$-complete on both classes. Counting is nevertheless polynomial-time solvable on stars and complete graphs, even with arbitrary precoloring. A decomposition-transfer theorem yields NP-completeness already at tree-depth two. A separate path-decomposition reduction gives a maximum-degree threshold between one and two for completely uncolored disconnected host graphs with unrestrictedly many colors. Components with at most two edges are tractable, while a disjoint union of $P_4$'s is NP-complete. Finally, precoloring restores tractability in several cases: star forests are polynomial when every center is precolored, and two broad precoloring regimes on length-two spiders are polynomial even when the number of colors is unbounded.

0.21

An EPTAS for Vector Scheduling with Time Intervals

cs.DS cs.CC ·2026-09-27 ·Junho Hwang
theory similarity 0.60
Abstract · 18 pages, 4 figures. v2: extended to several resources and unrelated machines, with a new title and simplified proofs

We study vector scheduling in which each job is active during a fixed time interval. A job uses several resources and stays on one machine for its entire interval; its resource requirements may depend on the machine. The objective is to minimize the largest resource load over all machines and times. For $r$ machines and $d$ resources, we give a deterministic $(1+\varepsilon)$-approximation in $f(r,d,1/\varepsilon)N^{O(1)}$ time, where $N$ is the binary input length. This gives an efficient polynomial-time approximation scheme for fixed $r$ and $d$, extending approximation schemes for scalar temporary tasks assignment. The algorithm merges jobs into blocks whose time intervals are fixed before any machine is chosen, and assigns the blocks by dynamic programming over a balanced recursive split of the time line. We also prove strong NP-hardness and an exponential lower bound in $1/\varepsilon$ under the Exponential Time Hypothesis, already for two identical machines and one resource.

0.13

A QPTAS for Stochastic Scheduling of Bernoulli Jobs

cs.DS cs.CCmath.OC ·2026-10-08 ·Junho Hwang
benchmark similarity 0.60
Abstract · 23 pages, 1 figure

We study the classical problem of scheduling jobs with random processing times on $m$ identical machines to minimize the expected sum of completion times, for Bernoulli jobs: job $j$ takes time $p_j$ with probability $q_j$ and time $0$ otherwise, and its outcome is revealed when it starts. The benchmark is an optimal adaptive policy. We give a quasi-polynomial-time approximation scheme for every number of machines. Previously, quasi-polynomial time was known to give an $O(\log N)$-approximation, and approximation schemes were known only for a constant number of distinct sizes. The scheme rests on a simple observation: it suffices to round the times at which machines become free, rather than the times at which jobs start, to a grid whose width is proportional to the job size, and an optimal policy stretched by a factor close to one already respects such grids. We also show that every policy that fixes the order of the jobs in advance loses a factor $Ω(\log N)$, already on two machines, so a constant factor requires adapting the order to the observed outcomes. Further results include a polynomial-time adaptive rule with ratio $\min\{m,1+\sum_j q_j\}$, a simpler approximation scheme for a constant number of sizes, and #P-hardness of computing the optimal expected cost on two machines.

0.25

Asymmetric Weighted Earliness-Tardiness: Scheduling with a Nonrestrictive Common Due Date

cs.CC math.OCcs.DMmath.CO ·2026-09-12 ·Nicholas G. Hall, Hans Kellerer, Miao Song
similarity 0.60
Abstract · 268 pages, 12 figures, 29 tables

Single-machine asymmetric weighted earliness--tardiness (AWET) scheduling asks how to sequence jobs around a common synchronization date when early and late completion incur unrelated job-dependent penalties. At the boundary nonrestrictive date $d=\sum_jp_j$, a compact V-shaped schedule reduces the continuous-time problem to a quadratic choice of a nonempty early set. We establish four complementary results for this model. First, the positive-integer problem is strongly NP-complete by a unary-polynomial reduction from Restricted Exact Cover by 3-Sets. Second, unrestricted AWET admits a polynomial-time $(3+2\sqrt2+\varepsilon)$-approximation based on an anchored semidefinite relaxation and deterministic marginal thresholding. Third, when the earliness and tardiness ratio orders are strict reversals, the problem is weakly NP-complete but has an exact two-resource pseudopolynomial dynamic program. Fourth, for fixed total refinements whose ratio permutation is separable, an exact separating-tree recurrence and coordinated geometric trimming yield an FPTAS. The proofs use different manifestations of the same canonical objective: scale-separated prefix penalties, positive-semidefinite minimum-kernel covariance, a dominant completed load square, and a bounded four-coordinate decomposition interface. Together, the results show that the decisive issue is not merely whether the two ratio orders agree, but whether their interaction can be controlled by a global certificate or compressed into a bounded constructive interface.

0.21