CS Paper Radar

Restoring Fair Hrtick Re-arming After Same-Task Repicks in the Linux EEVDF Scheduler

Shubhang Kaushik

cs.OS ·submitted 2026-11-15 09:16 UTC · v1
benchmark

Abstract

Linux uses one-shot high-resolution scheduler ticks (hrticks) to request rescheduling at fair-class execution boundaries. We analyze a gap in the dispatch path in which an expired fair hrtick is not restarted when the fair scheduler selects the current task again. The gap arises because the same-task fast path bypasses set_next_task_fair(), the location that normally records the next fair hrtick delay. We introduce SNT_REPICK, an explicit same-task activation type for struct sched_class. For fair tasks, it preserves the fast path while restarting the hrtick from refreshed EEVDF state. For SCHED_DEADLINE, it deliberately performs no hrtick restart because the corresponding runtime state is not refreshed on a repick. The implementation was merged into the mainline Linux kernel as commit c72945693b. We give a conditional timing analysis for systems on which the periodic scheduler tick remains active and report validation from two platforms. Functional tests on an 80-core Ampere Altra exercised fair hrtick, deadline hrtick, and the CONFIG_HIGH_RES_TIMERS=n fallback. Independently, Intel's 0-Day Kernel Test Service reported a 34.2% increase in its stress-ng.rawudp.packets_32_bytes_received_per_sec metric on a 192-thread Intel Xeon 6740E under the documented test configuration. We distinguish this reported benchmark result from causal claims that require separate scheduler and network instrumentation.

Comment
9 pages, 2 figures. Submitted to Elsevier Journal of Parallel and Distributed Computing. The scheduler change described in this paper was merged into the mainline Linux kernel as commit c72945693b90423f1b46ac2dbc8749c2b7804fc8

Closest papers

Nearest neighbours by meaning across the whole index.

Comments Paper: Counterexample for Schedulability Analysis for Self-Suspending Tasks under EDF-Like Scheduling

cs.OS ·2026-10-19 ·Michael Frichert, Mario Günzel, Marion Sudvarg, Jian-Jia Chen
theoryunusual similarity 0.57
Abstract

This paper provides a counterexample of the sufficient schedulability test for self-suspending real-time tasks under EDF-Like scheduling given by Wang et al. in Theorem 11 of IEEE Transactions on Computers, 74(7):2364-2375, 2025. This paper also shows that their necessary condition is unsound.

0.28

MorphSched: Workload-Aware Adaptive Scheduler Generation for Linux

cs.OS cs.AI ·2026-09-27 ·Yifan Zhang, Hengxuan Lou, Xinkui Zhao, Rengrong Xiong, Naibo Wang +4 more
benchmark similarity 0.56
Abstract

Modern Linux scheduling increasingly requires workload-specific policies to meet the dynamic performance needs of heterogeneous applications. The recent sched_ext framework enables custom BPF schedulers, but building practical policies still requires coordinating Rust user-space control logic, BPF scheduling callbacks, generated user-kernel interfaces, and strict eBPF verifier constraints. This paper presents MorphSched, an LLM-driven system for synthesizing complete Rust+BPF sched_ext schedulers. MorphSched profiles target workloads under Linux EEVDF to construct dynamic, workload-specific optimization objectives, and uses a scaffold-constrained generation pipeline to translate scheduling intent into deployable scheduler implementations. To improve synthesis reliability, MorphSched separates implementation repair from strategy search: verifier, build, and runtime failures are handled through a DAG-structured repair process, while performance feedback is accumulated in an evolutionary memory pool to refine high-level scheduling strategies across iterations. We evaluate MorphSched across 120 machine/workload/interferer configurations on a real Linux kernel. The generated schedulers compile, pass eBPF verification, load successfully, and remain stable throughout our benchmark runs without manual edits to generated scheduler source code. Across these configurations, MorphSched improves the primary foreground metric over EEVDF by 26.5% on average and up to 87.3%. In selected comparisons, the generated schedulers are also competitive with representative hand-written sched_ext schedulers. These results show that scaffold-constrained, system-grounded LLM generation can be a practical tool for exploring workload-specific Linux scheduling policies.

0.32

QFabric: Guarded Cross-Domain Task Recovery and Its Limits on a Linux-RTOS Board

cs.AR cs.OSeess.SY ·2026-11-01 ·Ayushman Bhattacharya, Anwesha Chakraborty
similarity 0.53
Abstract · 9 pages, 4 figures, 8 tables. Code and data: https://doi.org/10.5281/zenodo.23692354

Heterogeneous embedded boards pair a Linux application processor with a real-time microcontroller (MCU), which suggests moving a task between the two domains when its timing degrades. We present QFabric, a prototype that treats cross-domain placement as guarded recovery from a violated empirical soft real-time contract: a bounded task is compiled for both domains, monitored in windows with hysteresis, switched only after semantic and capacity admission at a quiescent epoch boundary, and committed or rolled back after probation. On an Arduino UNO Q (Cortex-A53 Linux and a Cortex-M33 running Zephyr), we characterize the stock Bridge RPC interconnect and measure five workloads in both domains under idle, CPU-load, and higher-priority SCHED_FIFO contention, with ordinary and real-time callers. Each MCU invocation costs about 19 ms of dispatch regardless of compute, the MCU runs the heaviest kernel 34x slower, and because every call traverses Linux userspace, Linux contention inflates the MCU path far more than the Linux path (p99 up to 400 ms versus 17.0 ms). Across 30 cells of a four-node chain, Linux meets every contract within 0.8% misses and QFabric correctly never migrates; a controller without hysteresis migrates in 7 cells, raising p95 by up to 177x, and probation rolls back 5 of those moves. On Linux-dispatched heterogeneous boards, migration therefore cannot isolate a task from Linux interference, and recovery guards matter chiefly by preventing harmful moves. This paper supersedes an earlier artifact release whose reported improvement arose from measurement defects that we identify. All source, raw traces, and generators are public.

0.37

AKTS: Sub-Microsecond Kernel Policy Switching for Language-Model Agents

cs.OS ·2026-09-10 ·Mohammadali Khodabandehlou, Mahdi Alizadeh
publishedcode/data similarity 0.53
Abstract · 6 pages, 1 figure. Accepted at the 10th Machine Learning for Systems Workshop at NeurIPS 2026. Code and raw measurement data: https://github…

GPU-backed LLM servers multiplex interactive requests with background batch work on the same CPUs; a fixed kernel policy serves one objective and loses the other, so agentic OS control needs to switch scheduler behavior as the workload changes. The hard part is applying the switch safely and fast enough for the kernel: scheduler events occur every 1-10 $μ$s, and any code running there must satisfy the eBPF verifier. Scalar knobs are fast but limited, while generating eBPF policy code puts compilation, verification and possible rejection on the runtime path. We present AKTS, which verifies a policy library once, at load time, and reduces the agent's runtime action to writing an integer index into an in-kernel array of preverified policies, resolved by a tail call. Because the agent emits an index rather than code, verifier failure is not a runtime outcome. On Linux 6.14, AKTS applies a policy switch in 920 ns (p50); makes an invalid index inert across 60,217 invocations on an attached scheduler; and switches policies in a vLLM workload to capture 97% of a throughput policy's batch work while matching a latency policy's burst response.

0.63

Fairway: Load-Aware KV Cache Reuse for LLM Prefill Scheduling

cs.DC ·2026-11-01 ·Hamidreza Alikhani, Nazmul Takbir, Matin Khajavi, Rajat Bhattacharjya, Sangeetha Abdu Jyothi +1 more
similarity 0.52
Abstract

LLM-based applications often employ agentic workflows and retrieval-augmented generation (RAG), which build long prompts from shared context. When prefixes are shared across requests, serving engines reuse the key-value (KV) cache to skip parts of the prefill computation. Reuse is typically graded: the uncached work of requests in a queue can differ by up to 100x. In this setting, the order of scheduling determines the time-to-first-token (TTFT) for the queued requests. KV reuse-first scheduling, which prioritizes the requests with the longest KV cache hit, gives the lowest median TTFT but starves expensive requests under load spikes; first-come-first-served (FCFS) scheduling bounds the tail but raises the median TTFT. We present Fairway, a prefill scheduler built on adaptive reuse prioritization: it favors KV cache reuse while queues are short, and shifts toward fair allocation as requests wait longer relative to their own prefill time. Fairway employs a virtual dual lane model: a KV reuse-first Fast lane and a Fair lane atop the serving engine's waiting queue that enables speeding up of cheap reuse requests without starving expensive ones. This model automatically adapts to the workload without any per-workload tuning. Fairway lowers the tail TTFT at no cost to the median in transient overload. Across workloads and load levels, Fairway matches or beats the best baseline, with a p99 TTFT up to 8.6x lower than prior prefix-aware schedulers. During load spikes, it keeps the tail of FCFS at a 6x lower median TTFT.

0.19

Tool Waiting and Re-arrival in Compile-Time-Static LLM Serving: Cost Mechanisms and Configuration Selection

cs.PF ·2026-09-28 ·Dongkyeom Jang, In-Nea Wang, Junho Jeong
similarity 0.51
Abstract · 24 pages, including 7 pages of supplementary material

In agentic LLM services, a session calls an external tool, waits for it, and re-arrives to continue inference. Statically compiled NPU serving can fix the batch bucket set, the maximum batch size, and the number of KV cache slots at compile time. We define such an environment as a compile-time-static serving substrate and analyze the execution-time cost that tool waiting and re-arrival incur in it. On a single LLM instance, we run synthetic workloads following a measured tool waiting time distribution and compare, on the same inputs, a baseline configuration with settings {1, 2, 4, 8}, 8, and 8 against configurations that change some of them. Because re-arrival times differ across configurations, we build a simulator that replays request processing in time order, select the candidate with the lowest predicted cost among 2,077 configurations, and validate it on new inputs. We identify three mechanisms: discrete batch alignment, KV cache survival, and prefill interference. At a concurrency of 6, absent from the bucket set, tool waiting lowered the padding ratio (0.235 to 0.120) yet increased decode execution time 1.51-fold, so padding alone did not indicate cost. On new inputs at a concurrency of 8, where the baseline reused KV in 9 of 24 re-arrivals, enlarging the maximum batch size alone cut execution cost by 8.25%, and the selected configuration, which also adjusted the bucket set, by 9.72%. Where 17 of 18 re-arrivals were already reused, the effect was 0.59%. Compile-time configurations should thus be selected by diagnosing KV reuse loss and the resulting change in execution.

0.27

Bounding Queue Waits for Fair Scheduling of Bursty HPC Workloads via Hierarchical Algorithms

cs.DC ·2026-10-23 ·Karaen Senthilkumar, Suman Raj, Maxime Gonthier, Kyle Chard, Donpaul Stephens +1 more
hot direction similarity 0.51
Abstract · 12 pages, 9 figures, 4 tables

HPC clusters are shared among many projects, each holding an allocation of node-hours, and ensuring fairness is becoming harder. Foundation models workflows and automated pipelines have made job submissions bursty and concentrated among a few heavy users, so occasional users absorb queueing delays created by frequent ones, with no indication of how long their jobs will wait. Existing schedulers either forget past usage, protect only the job at the head of the queue, or assume that running jobs can be preempted. We propose HyDRA, a Hybrid Deadline and Ranking-Aware scheduler that enforces fairness among users while bounding the queue wait of every job. HyDRA assigns each job a deadline on arrival based on its size, the priorities of its project and user, the current backlog, and how far its project and user are from their entitled share. It ranks waiting jobs by a priority score that grows with waiting time, serves jobs close to their deadlines first, and backfills a job only when no deadline, or fairness limit is violated. We evaluate HyDRA on workloads derived from a year of ALCF Polaris job traces, against conventional schedulers and variants inspired by PCS, Themis, and the PBS job-sort formula used at ALCF. HyDRA achieves $2\times$ the project-level Jain's fairness of the best baseline, starts 47\% of jobs by their deadlines compared with at most 36\% for the baselines even for largest workloads, and lowers the 95th-\%ile bounded slowdown by 4.2$\times$ relative to the next best baseline, at a moderate cost in utilization.

0.38

The Complexity of Value Optimization in Sporadic Task Systems

cs.CC cs.DS ·2026-10-26 ·Christopher Harbourne, Nathan Fisher, Kecheng Yang, Pontus Ekberg, Sanjoy Baruah +1 more
theory similarity 0.51
Abstract · 31 pages, 5 figures, 2 tables

Value-based Task Selection (VTS) asks whether a real-time system can select tasks whose total value reaches a required target while preserving every deadline. We study its threshold decision form for finite collections of independent sporadic tasks scheduled preemptively on one processor. We prove that this problem is $Σ_2^P$-complete for both constrained and arbitrary deadlines, even when all numerical parameters are encoded in unary. The existential choice is the selected task set, while the universal condition requires every processor-demand window to remain feasible. Our hardness reduction already uses constrained-deadline tasks. It represents universal assignments by Chinese Remainder Theorem timestamps and uses polynomial-weight local selector locks to enforce a valid existential assignment. The reduction produces polynomially many tasks, and every generated execution time, deadline, period, task value, and target is polynomially bounded in the source-instance size.

0.25