CS Paper Radar

The Benefit of Migration in Throughput Maximization on Unrelated Machines and under Restricted Assignment

George Karakostas, Stavros G. Kolliopoulos

cs.DS ·submitted 2026-11-20 17:53 UTC · v1

Abstract

In preemptive throughput maximization on parallel machines, jobs have release dates, due dates and weights, and the goal is to maximize the total weight of the jobs completed by their due dates. We study the benefit of migration, i.e., by what factor the optimal weight can increase when a preempted job is allowed to resume on a different machine. By a classic result of Kalyanasundaram and Pruhs, on identical machines the migratory optimum is at most $O(1)$ times the nonmigratory optimum. We give, for the first time, bounds for unrelated machines and for restricted assignment. We show that on unrelated machines, when every eligible machine can complete a job by itself, the migratory optimum is at most $O(\sqrt n)$ times the nonmigratory optimum, where $n$ is the number of jobs. Under restricted assignment it is at most $O(\log n)$ times the nonmigratory optimum. We provide instances which show that both bounds are best possible up to constant factors, even when the jobs have unit weights. Since our proofs are constructive, we obtain the first nontrivial approximation algorithms for migratory throughput maximization on unrelated machines and under restricted assignment.

Comment
68 pages, 5 figures

Closest papers

Nearest neighbours by meaning across the whole index.

Coordinating Boundaries: Improved Approximation Algorithms for Unweighted Non-Preemptive Throughput Maximization

cs.DS ·2026-10-26 ·Weitian Tong, Yao Xu
similarity 0.69
Abstract · 34 pages, 8 figures

We study unweighted nonpreemptive throughput maximization: given jobs with processing times, release times, and deadlines, schedule a maximum-cardinality subset on identical machines. For every fixed $\varepsilon>0$, we give randomized algorithms with expected approximation ratios $17/13+\varepsilon$ in polynomial time and $21/17+\varepsilon$ in pseudopolynomial time. These improve the respective $4/3+\varepsilon$ and $5/4+\varepsilon$ guarantees of Armbruster, Grandoni, Tinguely, and Wiese [STOC'26]. Both results hold for an arbitrary number of identical machines. Our algorithms build on their configuration-LP and matching framework, which partitions time into blocks. For a job whose window meets multiple blocks, its boundary blocks are the first and last such blocks. Crossing boundary pairs, whose endpoints strictly interleave, permit additional assignments to sampled execution slots, while a noncrossing family can be coordinated using consistent joint distributions on at most three blocks. The exchange analysis accounts for fractional job assignments that must be erased before inserting an additional job. For the pseudopolynomial implementation, we project configurations onto selected job identities and use separate configuration distributions with common placement marginals. This retains efficient pricing while enforcing the correlations needed for coordination.

0.15

Parallel Machine Scheduling with a Singler Server and Loading-Unloading Operations

cs.DS math.OC ·2026-08-12 ·Keramat Hasani, Frank Werner
theory similarity 0.68
Abstract · 20 pages, 3 figures

This paper investigates a parallel machine scheduling problem featuring a single common server responsible for both loading and unloading operations. Each job consists of a unit-time loading operation, non-preemptive processing on one of \(m\) identical machines, and a unit-time unloading operation executed by the same server. The objective is to minimize the makespan. Unlike classical loading-only common-server models, our setting requires the server to handle an unloading operation immediately after a job's processing phase concludes. We prove that the corresponding decision problem is strongly NP-complete when the number of machines is given as part of the input. Furthermore, we analyse the worst-case performance of the List Scheduling (LS) and Longest Processing Time (LPT) heuristics. For three machines, we establish that Algorithm LS achieves an approximation ratio of at most \(5/2\). For an arbitrary fixed \(m \ge 3\), we show that the general LS bound approaches \(4-3/m\) as the number of jobs grows, whereas for Algorithm LPT, we prove the finite-instance ratio $3-\frac{2}{m}+\frac{(m-1)(m-2)}{mn}.$ Thus, for each fixed \(m\), the LPT bound approaches \(3-2/m\) as the number of jobs grows.

0.38

The Power of Migration on Identical Machines is Two

cs.DS cs.DM ·2026-11-09 ·Nicole Megow, Bart Zondervan
similarity 0.68
Abstract

We study the power of migration in preemptive scheduling on identical parallel machines with time windows. If an instance admits a migratory schedule on $m$ machines, how many machines are needed to schedule it without migration? Kalyanasundaram and Pruhs (2001) showed that $6m-5$ machines suffice and gave a polynomial-time construction using $12m-5$ machines, whereas $2m-1$ machines may be necessary. We close this gap, which has been open for more than 25 years: $2m-1$ machines always suffice, and a corresponding non-migratory schedule can be computed in strongly polynomial time. Our proof has two main technical ingredients. First, we introduce supercanonical schedules and prove that the conflict graph of every such schedule on $m$ machines is $(2m-1)$-colorable. The key property is that whenever a job pauses, the jobs running alongside it just before and just after the pause separate the jobs processed entirely during the pause from the rest of the conflict graph. We use these separators and Kempe exchanges to compute a coloring in polynomial time. Second, we construct a supercanonical schedule with polynomially many processing blocks by shrinking job windows as far as possible while preserving feasibility and solving a min-cost flow problem.

0.10

Single-Machine Guarantees on Unrelated Machines and Beyond: Proportional Fairness for Nonclairvoyant Polytope Scheduling

cs.DS ·2026-10-23 ·Sven Jäger, Alexander Lindermayr, Bart Zondervan
theory similarity 0.67
Abstract · Shortened abstract

The Polytope Scheduling Problem (PSP) is a general framework for preemptive scheduling in which feasible instantaneous job allocations form a packing polytope. In the nonclairvoyant online setting, Proportional Fairness (PF), a practical allocation rule rooted in market theory, is the leading general-purpose algorithm. On a single machine, PF coincides with weighted Round-Robin, which is $2$-competitive for weighted completion time with uniform release dates (optimal for nonclairvoyant algorithms) and $(2+\varepsilon)$-speed $O(1/\varepsilon)$-competitive for weighted flow time. Known guarantees beyond a single machine are weaker. This raises a central question: Are these heterogeneous environments intrinsically harder than a single machine under nonclairvoyance? We show that they are not: PF retains both single-machine guarantees on the novel class of support-submodular polytopes, which includes unrelated machines and polymatroids. On unrelated machines, this refutes a belief (JACM'18, SODA'25) that PF is not $O(1)$-speed $O(1)$-competitive for weighted flow time. Our main technical contribution is an equivalent characterization: a polytope is support submodular if and only if, for all job weights, the optimal weighted completion time is concave in the processing requirements. This structural insight underlies both guarantees. For general PSP, the picture changes: we give the first lower bound above $2$, showing that every randomized nonclairvoyant algorithm has a competitive ratio of at least $2+10^{-5}$ for weighted completion time, even with uniform release dates. On the positive side, we substantially improve the best known guarantee for weighted completion time from $27$ (SICOMP'26) to $4$ via a new dual-fitting analysis of PF. For weighted flow time, we show that PF achieves the first $O(1)$-speed $O(1)$-competitive nonclairvoyant guarantee for graph scheduling.

0.27

Scheduling to Maximize Weighted Throughput with an Active-Time Budget

cs.DS ·2026-08-29 ·Susanne Albers, G. Wessel van der Heijden
publishedtheory similarity 0.67
Abstract · 16 pages, 5 figures, To appear at WAOA 2026

We study the active-time scheduling problem with weighted throughput maximization. In this setting, a set of $n$ jobs $J$ arrive at integer release times, each with an integer processing time and integer deadline. Jobs may be preempted at integer time slot boundaries. A schedule assigns jobs to time slots, with at most $m$ jobs assigned to the same time slot. A slot is called \emph{active} if at least one job is scheduled in it. Instead of scheduling all jobs to minimize the number of active time slots, we consider the more general variant of \emph{weighted throughput} with an active-time budget $K$, where each job $j\in J$ has a weight $w_j$. The objective is to maximize the total weight of \emph{completed} jobs using at most $K$ active time slots. This means that partially scheduled jobs do not count towards the objective. The classical active-time minimization problem is recovered by asking whether all jobs can be completed within a given active-time budget. We give hardness, approximation, and exact algorithmic results. For general intervals with unbounded parallelism, we prove NP-hardness, rule out an FPTAS unless $\mathrm{P}=\mathrm{NP}$, and give a pseudo-polynomial time $Ω(1/\log K)$-approximation. For proper intervals, we prove a canonical structural lemma and obtain an exact $(nK)^{O(m)}$-time algorithm. For laminar intervals, we give an exact $f(K,m)\cdot n^{O(1)}$-time algorithm.

0.25

Approximation algorithms for identical parallel machine scheduling with assignment costs

cs.DS ·2026-10-24 ·Wei Li
similarity 0.66
Abstract

We study non-preemptive scheduling on identical parallel machines in which assigning job $j$ to machine $M_i$ incurs the cost $c_{ij}=a_iw_j+b_j$. The processing times $p_j$ and the cost weights $w_j$ are independent, and the number of machines is part of the input. For every fixed $\varepsilon\in(0,1]$ and every deadline $T$ for which a schedule with makespan at most $T$ exists, we give a polynomial-time algorithm that computes a schedule with makespan at most $(1+\varepsilon)T$ whose total assignment cost does not exceed the minimum under the deadline $T$. Using this algorithm as a subroutine, we obtain a polynomial-time approximation scheme for minimizing the makespan under a total cost budget whose schedules always satisfy the budget; this answers an open question for costs $c_{ij}=l_ic_j$ with $c_j$ independent of $p_j$. For the lexicographic problem, in which the total assignment cost is minimized among all schedules of minimum makespan, we obtain in polynomial time a schedule with makespan at most $1+\varepsilon$ times the minimum and total assignment cost at most that of a lexicographically optimal schedule; this improves the makespan guarantees of earlier algorithms for additive and multiplicative costs. For costs $c_{ij}=s_i+a_iw_j$, where $s_i$ is charged for each job processed on $M_i$, the same guarantees are obtained in quasi-polynomial time.

0.24

Minimizing the Makespan Approximately on Two Identical Parallel Machines with a Loading--Unloading Server

cs.DS math.OC ·2026-08-19 ·Keramat Hasani, Frank Werner
theory similarity 0.66
Abstract · 29 pages, 1 appendix

We study makespan minimisation on two identical parallel machines that share a single server for both loading and unloading. Each job must be loaded, processed without interruption on its assigned machine, and unloaded immediately after processing, with a common positive integer duration for all loading and unloading operations. We prove that the decision problem is NP-complete for every fixed server-operation duration and strongly NP-complete when this duration is part of the input. We then analyse ordinary list scheduling and the longest-processing-time rule in the non-unit setting. List scheduling has a tight supremum ratio of two. For the longest-processing-time rule, we obtain the exact worst-case ratio when all processing times are at least the server-operation duration, and derive new parameter-dependent lower and upper bounds for unrestricted instances. The results show that both processing-time granularity and blocking generated by short jobs shape the approximation behaviour of the common-server problem.

0.08

A minimum witness for the 3/2 configuration-linear-program gap in two-weight graph balancing, unique at its size

cs.DS math.OC ·2026-08-13 ·Adam Y. Shavit
theorycode/data similarity 0.66
Abstract · 37 pages, 12 figures, 1 table. v3: corrects the infeasibility-verdict count behind the six-machine sweep (4,228,054, not 4,231,347), a false…

Restricted assignment minimizes makespan, the busiest machine's load, when each job has one size and a set of allowed machines. Its tightest studied relaxation is the configuration linear program, which fractionally gives each machine whole job sets that fit. Its integrality gap, the worst-case ratio of integral optimum to relaxation value, is open in general. On two-weight graph balancing (sizes 1 and 2, each job allowed on at most two machines) the gap is known: Jansen, Land, and Maack (2016) give both bounds. Their Table 1 instance attains 3/2, and their Corollary 11 bound of 2-s/b for sizes s < b matches it at {1,2}. We ask how small such an instance, a witness, can be. We give a six-job witness I* on the complete graph on four machines: unit jobs form a cycle through all four, and two weight-2 jobs take the remaining edges. I* has integral optimum 3 against relaxation value 2, one job fewer than the smallest earlier witness of this class. We prove I* minimum and unique at its size, on any number of machines: no instance with at most five jobs reaches gap 3/2, and at six jobs I* is the only witness, up to relabeling machines and adding unusable machines. At seven jobs uniqueness fails: we classify all thirteen witnesses, including the Jansen-Land-Maack instance. Eight jobs give 154, nine 1,662. At least four machines are necessary. Kartak et al. (2015) classified the extremal non-round-up instances of the same relaxation in one-dimensional cutting stock for small demand; the Discussion relates them. Recognizing witnesses at relaxation value 2, shared by all ours, is coNP-complete, so no min-max characterization with polynomially checkable conditions exists unless NP = coNP. Every feasibility decision behind the exhaustive claims was made twice, in floating-point and exact rational arithmetic, with identical results. We accept the pipeline's negatives only after it rediscovers I*.

0.64