Abstract

Given the high cost of grid-scale batteries, other energy storage approaches are needed for developing and low-income regions. Elevated volumes of water are often more economically feasible energy storage options than batteries in these contexts. This paper presents a dual-framework modeling approach for one such energy storage setup: a solar-grid hybrid water supply system in the arid Afar region of Ethiopia. By utilizing an elevated 1,900 m3 water reservoir as a "hydraulic battery," the system replaces traditional electrochemical storage, significantly reducing capital expenditures. Using Python for high-resolution technical simulation and Xendee for economic optimization, the study shows a 55.1% solar fraction and a 10% Internal Rate of Return (IRR). The results confirm that hybrid systems with hydraulic storage offer a financially viable and reliable solution for water access in energy-constrained regions.

Comment
6 pages, 3 figures, presented at 2026 IEEE PES/IAS PowerAfrica Conference

Closest papers

Nearest neighbours by meaning across the whole index.

Co-Optimized Generation, Transmission, and Storage Expansion: System Value and Optimal Duration of Pumped-Storage Hydropower

eess.SY math.OC ·2026-08-27 ·Rafael Benchimol Klausner, Rafael Kelman
similarity 0.65
Abstract

Expansion planning models usually fix storage duration before optimization, setting how much storage power to build but not for how long it can discharge. We present a generation-transmission-storage expansion framework in which candidates of many durations compete on annualized cost, making the duration mix an optimization outcome. It is a rolling-horizon, two-stage stochastic linear program, each five-year stage is a full year at hourly resolution under ten coherent inflow, wind, and solar scenarios. We apply it to the Brazilian Interconnected System over 2030-2050, where demand roughly doubles to 1,716 TWh/year and variable renewable energy (VRE) supplies most new capacity. Two cases are compared: 36 pumped-storage hydropower (PSH) candidates over four subsystems and nine durations (4-144 h) alongside 4-h battery energy storage systems (BESS), and BESS alone. With PSH available, the model builds 31.2 GW / 755 GWh of PSH and no BESS, dominated by 12-h capacity with 4.9 GW of 72-h units. Without PSH it builds 38 GW / 152 GWh of BESS and 7.8 GW more gas-fired capacity, mostly open-cycle peakers. PSH lowers 2050 annualized system cost by US$ 5.0 billion/year (6.8%), operating cost by 23.5%, thermal generation by 34 TWh/year, and long-run marginal cost by 20%; 2035 VRE curtailment falls from 8.4% to 3.2%. The magnitudes are specific to Brazil, but the underlying mechanism is general: limiting storage candidates to a single duration understates the system's optimal energy-storage requirement and overstates its residual need for thermal capacity.

0.30

Optimal Power Sharing for Hybrid Energy Storage Systems Based on Karush-Kuhn-Tucker Conditions

eess.SY ·2026-09-25 ·Juan Diego Rios-Peñaloza, Milan Prodanovic, Javier Roldán-Pérez
similarity 0.64
Abstract · Submitted to a scientific journal for possible publication. 10 pages, 15 figures

Renewable energy power plants are increasingly expected to provide ancillary services to the grid. Yet, the variability of sources such as solar photovoltaics requires additional operational flexibility to deliver these services. In this context, hybrid energy storage systems (HESSs) offer an appropriate solution, because different technologies with complementary characteristics can be applied and leveraged to share the power demand and improve the overall performance. Yet, a proper power sharing requires a detailed model of the storage elements. This aspect has barely been studied in the literature, where most models consider constant efficiencies. Moreover, most formulations are based on optimisation problems that are computationally too demanding to be solved in real time. In this paper, a controller is proposed to minimise the losses of a HESS considering detailed power-dependent efficiency curves of each storage technology. The power sharing method is based on the analytical verification of the Karush-Kuhn-Tucker (KKT) conditions, which makes it computationally efficient and suitable for real-world deployment. The proposed controller is applied to a test case consisting of a 10 MW PV power plant with a HESS based on a lithium-ion battery and a redox-flow battery, each with 2.5 MW power and 5 MWh capacity. The main contributions are verified via numerical simulations performed in MATLAB/Simulink, whereas a real-time implementation deployed in OPAL-RT demonstrates the viability of the algorithm for real-time applications.

0.29

Optimal Dispatch of a Hydrogen-Colocated Renewable-Powered Desalination Plant

eess.SY ·2026-09-09 ·Guochen Zhao, Ahmed S. Alahmed
similarity 0.62
Abstract

This paper develops an analytical framework for profit-maximizing dispatch of water, electricity, and green hydrogen in a renewable-powered water desalination plant (WDP) combining thermal and reverse osmosis (RO) desalination. The optimal dispatch reveals that the schedules of the desalination units, electrolyzer, and grid interaction can all be characterized in closed form as functions of renewable generation. At low renewable output, the plant relies on thermal desalination and grid power while maintaining RO desalination and hydrogen production at their minimum setpoints. At high output, it reduces thermal desalination, increases RO desalination, and allocates surplus power and water to hydrogen production. For renewable output within a precomputed intermediate range, the WDP balances energy internally, allocating resources based on the relative marginal values of hydrogen and RO water. Simulations using real solar and plant data show that integrating RO and thermal desalination with renewable generation and hydrogen production achieves the highest daily profit of 75.945 k$, exceeding the best configuration without hydrogen by 15.1%.

0.21

Optimal Demand Response-Based Energy Management for Campus Buildings with Battery Energy Storage Systems: A Case Study of the ELB Building

eess.SY ·2026-10-14 ·Ali Beidoun, Quang Manh Hoang, Guilherme Vieira Hollweg, Van-Hai Bui
similarity 0.57
Abstract · 1-12

Buildings account for a significant portion of global electricity consumption, making demand response (DR) an effective strategy for reducing energy costs and improving grid flexibility. This paper presents an optimal energy management framework for a campus building that integrates demand response and battery energy storage systems (BESS) to minimize electricity costs while satisfying operational constraints and occupant comfort requirements. The proposed optimization model schedules building loads and battery charging/discharging based on time-varying electricity prices and building demand profiles. The framework is validated using the Engineering Laboratory Building (ELB) at the University of Michigan-Dearborn as a real-world case study. Four operating scenarios are investigated: (i) baseline operation, (ii) demand response without battery energy storage, (iii) battery energy storage, and (iv) demand response with battery energy storage. Simulation results demonstrate that demand alone reduces the building's electricity cost by approximately 12% compared with conventional operation. When battery energy storage is incorporated, the total electricity cost reduction increases to approximately 26%, highlighting the significant economic benefits of coordinated demand response and energy storage scheduling. The results demonstrate that integrating battery energy storage with demand response substantially enhances the operational flexibility of campus buildings and provides an effective solution for cost-effective and sustainable building energy management.

0.17

Optimizing Multi-Market Participation of Battery and Electrolyser Systems Based on Field Performance

cs.LG ·2026-08-17 ·Chunyang Zhao, Stoyan Trenchev, Shi You, Chresten Træholt
published similarity 0.57
Abstract · 6 pages, 8 figures. Accepted at the 2026 IEEE Power and Energy Society General Meeting (PESGM)

The increasing share of renewable energy in power systems creates a need for fast-response and flexible resources to maintain system stability. With the expansion of electricity markets and ancillary service products, opportunities arise to stack revenues across multiple services. Long-term Power-to-X (PTX) electrolysers and short-term battery energy storage systems (BESS) are prevalent flexible resources, yet most studies neglect real hardware behavior, such as ramp limits, efficiency, and setpoint-tracking accuracy. This work presents experimental and modeling results for a 55 kW/79 kWh BESS and an electrolyser comprising three 2.4 kW units. Key characteristics are identified through measurements and embedded into a price-driven optimization framework for participation in the Danish electricity and ancillary service markets, utilizing real market data from 2022 to 2025. The optimized daily profits for multi-market participation are 1,749.27 DKK and 289.46 DKK for the BESS and electrolyser, respectively. With the demonstrated business cases for BESS and PTX systems, this work highlights the importance of incorporating experimental performance when evaluating participation across multiple markets and years.

0.38

Water as a Battery: Using Hydropower Flexibility to Support the Grid

eess.SY ·2026-10-25 ·Chinmay Morankar, Abdullah Al Mehadi
published similarity 0.57
Abstract

This study presents a two-layer optimization framework to determine the optimal sizing of PV, wind, and battery storage co-located with existing hydroelectric plants to support rapidly increasing data center loads while minimizing cost, grid reliance, and transmission upgrades. The outer layer uses Particle Swarm Optimization (PSO) to select capacity combinations, while the inner layer performs rolling-horizon dispatch simulations to model hourly energy balance among PV, wind, hydro, and BESS, considering operational constraints. Two case studies were analyzed. At The Dalles Dam (Oregon), favorable wind resources and land availability enabled deployment of 111.2 MW PV and 117.9 MW wind, with no BESS required. Hydro flexibility allowed the system to meet the load with minimal grid support. In contrast, Conowingo Dam (Maryland) faced land constraints and limited renewables to 130 MW PV, leading to higher grid dependence. Co-locating hydro with renewables significantly enhances reliability and cost effectiveness by leveraging hydro's dispatchability to balance daily and seasonal variable generation from PV + Wind, reducing the need for storage or costly grid imports. This analysis provides a framework to meet the 99.9% availability targets of this new load type on the grid with sustainable energy resources.

0.32

Data center cooling choices shift water impacts across the grid: An integrated water-energy model for sustainable data center development

eess.SY cs.CYcs.DC ·2026-09-21 ·Garrett Alston, Nancy Love, Rabab Haider
code/data similarity 0.55
Abstract · 12 pages; 8 figures; 6 tables; appendix

Data centers are being developed at an unprecedented pace, yet their energy and water impacts, and the spatial and temporal distribution of these impacts, remain poorly characterized. Data centers consume water for cooling (direct) and through electricity generation (indirect). Decisions on siting and cooling technology result in water-energy trade-offs that extend impacts beyond the facility's location. Existing assessment frameworks rely on facility efficiency metrics and average grid water intensity factors, suppressing the temporal impacts of data center load and generation availability. They also attribute indirect consumption to the facility's location rather than to the generators (and corresponding hydrologic regions) that respond to the added load, misattributing spatial impacts. To close this gap, we develop a computational model of the data center-energy-water nexus that links facility cooling and electricity demand with hourly economic dispatch, generator-level water consumption, and monthly subbasin depletion. Built on open-source data, the model resolves where and when water is consumed, and where this consumption compounds existing water risk or creates new risk. Using the model, we study different cooling configurations and proposed developments in the state of Michigan. Air-cooled data centers halve total water consumption relative to evaporative cooling, but increase electricity demand and raise indirect water consumption by one-third, shifting the water footprint from the facility to generators. Mapping these changes to subbasins reveals depletion increases beyond the data center sites, in regions that facility-level reporting may overlook. These results show that data center water and energy impacts cannot be assessed in isolation, motivating the need for integrated modeling to inform siting, design, and reporting practices.

0.22

Impact of Wind-Solar-Battery Growth on Electricity Prices: Reserve Scarcity and Transmission Congestion

eess.SY ·2026-11-14 ·Haoxiang Wan, Ivan Castillo, Xingpeng Li
similarity 0.54
Abstract · 7 pages, 3 figures, 2 tables. Submitted to IEEE GECA 2027

This paper asks whether sequential wind, solar, and battery storage additions that eliminate unserved energy also remove modeled reserve scarcity and transmission congestion. Thirty-one cumulative portfolio states are evaluated on a modified IEEE 24-bus system for a constructed stressed day using a 24-hour day-ahead unit commitment model with network constraints, co-optimized energy and upward reserve, chronological battery storage, and an approximation of the Electric Reliability Council of Texas operating reserve demand curve. The thermal baseline has 106 MWh of unserved energy, whereas 450 MW of wind is sufficient to serve all demand. However, with 1,500 MW of wind, the hourly modeled reserve scarcity price still reaches \$5,000/MWh because wind output declines after the system peak. Adding 1,800 MW of solar reduces the load weighted daily average modeled reserve scarcity price from \$1,136.2/MWh to \$101.2/MWh and confines modeled reserve scarcity to three evening hours. Adding 250 MW/1,000 MWh of battery storage further lowers the average to \$4.3/MWh and reduces wind curtailment from 631 MWh to 306 MWh. Transmission congestion nevertheless remains: all residual wind curtailment occurs at bus 21, wind capture prices at buses 21 and 23 differ by \$31.8/MWh, and identical battery storage plants yield normalized net energy market revenues of \$201/(MW$\cdot$day) and \$121/(MW$\cdot$day) at buses 19 and 21, respectively. These results show that unserved energy, modeled reserve scarcity, and locational congestion effects measure distinct operating conditions and should be evaluated separately but interpreted together.

0.27