Abstract

A machine faces many jobs whose lengths are hidden. Spending one unit of time to inspect a job may reveal a short job that should be finished now, or it may reveal nothing useful while every other job waits. When should the machine keep looking, and when should it start working? We study natural variants of this question and provide optimal algorithms in both the worst-case and instance-optimal frameworks. The resulting algorithms are often quite simple, which may make them useful in practice.

Closest papers

Nearest neighbours by meaning across the whole index.

Exact Competitive Ratios of Index Rules for Scheduling with Obligatory Testing

cs.DS ·2026-10-29 ·Felix Buld
theory similarity 0.58
Abstract

We revisit scheduling with obligatory testing, where each job consists of two operations: a test with an initially known time and an operation whose processing time is revealed upon completion of the job's test. We develop an iterative competitive-ratio-preserving instance-reduction method that enables us to compute exact competitive ratios directly on highly structured instances for various index rules. Our main result is a clean analysis showing that the competitive ratio of the algorithm $1$-SORT is exactly the Golden Ratio $\varphi\approx 1.618$, improving the recent best-known upper bound of $1.861$ for arbitrary testing times. We further leverage this method to obtain near-tight bounds for a simple randomized algorithm on instances with uniform testing times.

0.25

Scheduling with Mandatory Breaks: NP-Hardness and an Additive-One Approximation

cs.DS ·2026-09-28 ·Shreyas Ghildiyal, Muralidhara V N
similarity 0.53
Abstract

In classical fixed-interval scheduling, each job of a given set must be processed during a prescribed time interval. The goal is to assign each job to exactly one machine such that no two jobs assigned to the same machine overlap in their interiors, and the number of machines used is minimized. Without further constraints this is interval graph coloring and is solvable in polynomial time through greedy approaches. We study a variant in which every used machine must remain idle during a contiguous \emph{break} of prescribed length $x$ somewhere in the scheduling horizon. We show that this additional constraint makes the problem hard, except when $x\le1$. First, for every fixed $x\ge2$, deciding whether $k$ machines suffice for the assignment of a given set of jobs is NP-complete, even when all coordinates are bounded linearly in the number of jobs, so machine minimization is strongly NP-hard. Second, for $x=1$, we give a polynomial-time algorithm that solves the problem exactly. Finally, we give a deterministic polynomial-time algorithm that, on every feasible instance, outputs a schedule using at most $\OPT+1$ machines, where $\OPT$ is the true minimum. Unless $\mathrm{P}=\mathrm{NP}$, no polynomial-time algorithm guarantees $\OPT$ machines for any fixed $x\ge2$, so the additive guarantee of one is best possible.

0.07

Speed-Robust Scheduling for Total Completion Time

cs.DS cs.DM ·2026-11-16 ·Moritz Buchem, Nicole Megow, Morten Weber
similarity 0.52
Abstract

We study two-stage speed-robust scheduling for minimizing total completion time. Jobs must be partitioned into $M$ bags before an adversary reveals the speeds of at most $M$ machines. Each bag is then assigned to one available machine, and the jobs on each machine may be processed in any order independent of the bags. We compare with an optimal schedule that knows the speeds in advance and assigns jobs individually. This model has been studied for makespan minimization. We initiate its study for total completion time, as suggested by Stein and Zhong (TALG 2020). For an unknown number of identical machines, we show that the optimal deterministic robustness factor is exactly~$13/12$, both for unit-size jobs and for arbitrary processing times. For infinitesimally small jobs, the factor lies between $31/30\approx1.0333$ and $28/27\approx1.0370$, well below the optimal makespan factor of about $1.2071$. General speeds make the problem strictly harder: no deterministic algorithm is better than $1.2669$-robust, already for infinitesimally small jobs. We give a $25/16$-robust algorithm for arbitrary processing times and improve the guarantee to $1681/1152\approx1.4592$ for infinitesimally small jobs. Our main tools are a layer decomposition that extends guarantees from unit-size jobs to arbitrary processing times when one assignment satisfies them for every prefix in non-increasing processing-time order, and a threshold analysis of the bag counts produced by greedy assignment rules.

0.31

Better Late Than Never: Online Flow Time Scheduling with Online Estimates

cs.DS ·2026-09-07 ·Anupam Gupta, Haim Kaplan, Alexander Lindermayr, Jens Schlöter, Sorrachai Yingchareonthawornchai
similarity 0.52
Abstract · abstract shortened

In the classical online flow-time scheduling problem on a single machine, jobs arrive over time and must be processed to minimize the total time they spend in the system: for over fifty years, we have known that SRPT is an optimal online algorithm. But this algorithm requires exactness in two different ways: (a) job sizes must be known exactly, and (b) they must be revealed as soon as the job arrives. Recent work relaxed each of these assumptions separately: there are algorithms based on knowing approximate sizes (given when the job arrives), or based on knowing (exact) sizes at some point before the remaining size gets too small. Nonetheless, prior to this work, there was no known approach to relax both assumptions simultaneously. In this work, we consider a model that demands much less: When we process a job, at some point in time between when we complete an $\varepsilon$-fraction and a $(1-\varepsilon)$-fraction of its unknown processing requirement, we are informed that the job is ``somewhere in the middle''. Finally, when the job has received its desired amount of processing, we are informed of its completion. No other information is shared about the job. We give an $O(1/\varepsilon^2)$-competitive algorithm for this model. Slightly more generally, we assume that an algorithm receives a $μ$-approximate estimate of each job's processing time at some time before we complete a $(1-\varepsilon)$-fraction of its processing. Our algorithm is $O(μ/\varepsilon)$-competitive, and we show that this is asymptotically optimal. It is a surprisingly natural variant of the multilevel feedback algorithm (MLF) and it is parameter-oblivious: it does not need to know $μ$ or $\varepsilon$ upfront. The core analytical contribution is to robustify the dual-fitting framework for this problem to handle jobs for which we have not yet received estimates.

0.37

Parallel Machine Scheduling with a Singler Server and Loading-Unloading Operations

cs.DS math.OC ·2026-08-12 ·Keramat Hasani, Frank Werner
theory similarity 0.51
Abstract · 20 pages, 3 figures

This paper investigates a parallel machine scheduling problem featuring a single common server responsible for both loading and unloading operations. Each job consists of a unit-time loading operation, non-preemptive processing on one of \(m\) identical machines, and a unit-time unloading operation executed by the same server. The objective is to minimize the makespan. Unlike classical loading-only common-server models, our setting requires the server to handle an unloading operation immediately after a job's processing phase concludes. We prove that the corresponding decision problem is strongly NP-complete when the number of machines is given as part of the input. Furthermore, we analyse the worst-case performance of the List Scheduling (LS) and Longest Processing Time (LPT) heuristics. For three machines, we establish that Algorithm LS achieves an approximation ratio of at most \(5/2\). For an arbitrary fixed \(m \ge 3\), we show that the general LS bound approaches \(4-3/m\) as the number of jobs grows, whereas for Algorithm LPT, we prove the finite-instance ratio $3-\frac{2}{m}+\frac{(m-1)(m-2)}{mn}.$ Thus, for each fixed \(m\), the LPT bound approaches \(3-2/m\) as the number of jobs grows.

0.38

Minimizing the Makespan Approximately on Two Identical Parallel Machines with a Loading--Unloading Server

cs.DS math.OC ·2026-08-19 ·Keramat Hasani, Frank Werner
theory similarity 0.51
Abstract · 29 pages, 1 appendix

We study makespan minimisation on two identical parallel machines that share a single server for both loading and unloading. Each job must be loaded, processed without interruption on its assigned machine, and unloaded immediately after processing, with a common positive integer duration for all loading and unloading operations. We prove that the decision problem is NP-complete for every fixed server-operation duration and strongly NP-complete when this duration is part of the input. We then analyse ordinary list scheduling and the longest-processing-time rule in the non-unit setting. List scheduling has a tight supremum ratio of two. For the longest-processing-time rule, we obtain the exact worst-case ratio when all processing times are at least the server-operation duration, and derive new parameter-dependent lower and upper bounds for unrestricted instances. The results show that both processing-time granularity and blocking generated by short jobs shape the approximation behaviour of the common-server problem.

0.08

New Complexity Results for Fair Repetitive Scheduling

cs.DS ·2026-08-20 ·Moran Koren, Michael L. Pinedo, Dvir Shabtay
similarity 0.50
Abstract · 12 pages

We revisit the problem of finding fair solutions to repetitive scheduling problems with a single machine. In this problem, we are given a set of $n$ clients and a planning horizon consisting of $q$ periods (days). Each day, every client submits a single job that must be processed by the machine. The objective is to construct a set of $q$ schedules, one for each day, such that the quality of service (QoS) received by each client meets a predefined threshold. The QoS measure may be any standard scheduling criterion, such as the total waiting time or total completion time of a client's jobs over the entire planning horizon. This problem has been studied in the literature, with previous works providing complexity classifications and approximation algorithms for various QoS measures. Nevertheless, several important questions remain open. In this paper, we resolve three of these questions and identify several additional directions for future research.

0.23

A QPTAS for Stochastic Scheduling of Bernoulli Jobs

cs.DS cs.CCmath.OC ·2026-10-08 ·Junho Hwang
benchmark similarity 0.49
Abstract · 23 pages, 1 figure

We study the classical problem of scheduling jobs with random processing times on $m$ identical machines to minimize the expected sum of completion times, for Bernoulli jobs: job $j$ takes time $p_j$ with probability $q_j$ and time $0$ otherwise, and its outcome is revealed when it starts. The benchmark is an optimal adaptive policy. We give a quasi-polynomial-time approximation scheme for every number of machines. Previously, quasi-polynomial time was known to give an $O(\log N)$-approximation, and approximation schemes were known only for a constant number of distinct sizes. The scheme rests on a simple observation: it suffices to round the times at which machines become free, rather than the times at which jobs start, to a grid whose width is proportional to the job size, and an optimal policy stretched by a factor close to one already respects such grids. We also show that every policy that fixes the order of the jobs in advance loses a factor $Ω(\log N)$, already on two machines, so a constant factor requires adapting the order to the observed outcomes. Further results include a polynomial-time adaptive rule with ratio $\min\{m,1+\sum_j q_j\}$, a simpler approximation scheme for a constant number of sizes, and #P-hardness of computing the optimal expected cost on two machines.